Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Concrete Aggregates for British Columbia Construction ProjectsBy P. J. Routledge
THE purpose of this paper is to discuss the practical aspects of locating gravel deposits and of establishing efficient, portable concrete aggregate beneficiation plants for use on construction projec
Jan 1, 1962
-
The Development of an Integrated IT System at Albian Sands EnergyBy Louise H. Michaud
Albian Sands Energy is scheduled to begin production at its oilsands operations in the fall of 2002. Start-up includes the selection and implementation of over 75 IT systems or computer applications.
May 1, 2002
-
A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore"This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs
Jan 1, 1989
-
Rate Dependence of Flexural Tensile Strength of Laurentian GraniteBy F. Dai
Due to difficulties associated with gripping in direct tension, indirect methods are commonly used to measure rock tensile strength. In this work, we adopt an innovative indirect tensile test method:
May 1, 2009
-
Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic MethodBy Robert E. McIvor
"The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe
Jan 1, 2011
-
Computer Control StrategyBy R. J. McLeod
"CONTROL STRATEGYThe Lake Dufault Division of Falconbridge Copper Limited has been concentrating a complex copper zinc ore since late 1964. An ARL X-ray on stream analyzer was installed in 1966 for pr
Jan 1, 1973
-
Mill Operations - Lean and KeenBy P. R. Richardson
"Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,
Jan 1, 1988
-
Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”By Robert E. McIvor
"“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g
Jan 1, 2013
-
The Midas Pond Gold Prospect, Victoria Lake Group, Central Newfoundland: A Mesothermal Quartz Vein System with Epithermal CharacteristicsBy Derek H. C. Wilton, David T. W. Evans
"Abstract - The Midas Pond gold prospect, central Newfoundland, is hosted by sheared and altered felsic and mafic pyroclastic rocks of the Tulks Hill volcanics, Victoria Lake Group, and has been trenc
Jan 1, 2000
-
Mining Operations at Carol Project Iron Ore, Company of CanadaBy Engineering Staff
In 1958, the Iron Ore Company of Canada decided to proceed with the Carol Project. The ore deposits in the area are part of the highly metamorphosed southern zone of the Labrador Trough. They lie alon
Jan 1, 1962
-
Factors That Affect Cemented Rockfill Quality in Nevada MinesBy David M. R. Stone
Underground mining in the gold industry is gaining popularity in Nevada, and with it the use of cemented rockfill is becoming mainstream. Even with today?s high metal prices, however, mining companie
May 1, 2007
-
Social Implications of Mining Operations on Nearby Communities - A Case StudyBy Steven Townend
Mining-related activities have been known to create a challenging operating environment for mining companies located in close proximity to communities. Issues such as noise, vibrations from mining ope
May 1, 2011
-
Determining Ore Breakage Characteristics using the Steel Wheel Abrasion TestBy Tapiwa Chenje, Victor Olivas, Peter Radziszewski
"Ore breakage and grinding media wear have always been considered and determined separately in laboratory tests. However the two processes are linked with the ore broken down in any comminution device
Jan 1, 2011
-
The Use of a Laboratory Centrifugal Separator to Study Gravity Recovery in Industrial CircuitsBy Y. Shu, A. R. Laplante
"A laboratory Knelson Concentrator (LKC), 7.5 cm in diameter, was used to study the performance of a similar unit at plant scale, 76 cm in diameter, This paper reports on sampling and assaying procedu
Jan 1, 1992
-
Processing of Calcium CarbonatesBy David R. Skuse, Jacek A. Kostuch, Steven M. Fortier
"Particulate ground calcium carbonate (GCC) is used as a filler and coating pigment in a wide range of applications including papers, paints, plastics and films. In this paper we will overview the req
Jan 1, 2004
-
Gold "Preg-Robbing" by Pyrite: Natural and Process InducedBy Stephen L. Chryssoulis
"""Preg-robbing"" of gold by carbonaceous matter during the cyanidation of certain types of carbonaceous gold ores is well documented. Recent studies established that ""preg-robbing"" of gold is not l
Jan 1, 1997
-
Optimization of Acid Consumption for Copper Heap LeachingBy Anand Raman, Steve Dixon
"Industry practice for defining acid consumption is based on column tests. Freeport-McMoRan (FCX) has adopted a practice of leach operation using a defined pH or gpl acid in the raffinate based on the
Jan 1, 2008
-
Kiena Maintains Up To Date Image with a New Gold MillBy R. Jolicoeur, J. F. Jackson, M. A. Green
"The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in
Jan 1, 1986
-
Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, TurkeyBy C. O. Aksoy
There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary
Jan 1, 2005
-
Process Improvements at Placer Dome Campbell MineBy K. Norris
"The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, p
Jan 1, 1992