Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Effects of Operating Parameters on Grinding Steel Consumption

    "INTRODUCTIONThe Kidd Creek Concentrator is located 28 kilometers east of the city of Timmins, Ontario. Two types of ore are treated; 'A' type, a copper-zinc-low silver ore producing copper and zinc c

    Jan 1, 1988

  • CIM
    Flotation at Les Mines Selbaie

    By Adam Wright

    "Les Mines Selbaie have been producing copper and zinc concentrates from the A-1 ore zone since 1986. This paper reviews major developments in flotation practice over that period. Firstly, ore blendin

    Jan 1, 1995

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    Mechanism of Slag and Matte Formation in Copper Flash Smelting

    By Zhuo Chen, Jun Zhou, Jiemin Zhou

    Samples of the reacting suspension particles were taken from the reaction shaft of a commercial flash furnace at different heights. The processes of matte and slag formation and morphology of the samp

    Jan 1, 2019

  • CIM
    Narrow-vein Mining Experiences at the Ashanti Mine: A Case Study

    By Fidelis T. Suorineni

    The Ashanti mine, located in Obusai, Ghana, West Africa, has been in production for over 100 years, and is currently the second largest single gold producer in Africa. The mine covers a concession are

    Oct 1, 2001

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004

  • CIM
    Hydraulic Hoisting & Long Distance Pumping of Coal

    By R. E. McElvain

    "Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.

    Jan 1, 1978

  • CIM
    Energy Conservation in Mining & Milling Operations

    By T. B. Armstrong

    "The developing world energy crisis and spiraling fuel costs have created a new public awareness and general acceptance of the need for energy conservation.Plants will have different objectives for an

    Jan 1, 1978

  • CIM
    A Novel Approach to Recover Precious Values from Low-Grade Canadian Ores

    By V. I. Lakshmanan, D. A. Mackie

    "1. INTRODUCTIONIn the past two decades, low-grade gold and silver ore bodies in the United States have been exploited by heap leaching, primarily with sodium cyanide solutions. This method has proven

    Jan 1, 1989

  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Oil-Shales

    By J. Chelsey Dawson

    In presenting a thesis on this subject it is advisable to explain a few of the reasons for its seeming incompleteness. World progress has brought us to a position where approximations are not only to

    Jan 1, 1925

  • CIM
    A New ERA Tool for State of the Art Metallurgical Balance Calculations

    By Frédéric Flament, Luc Lachance

    "The important task of metallurgical accounting that used to be done manually is being more and more automated. Currently available solutions can generate accounting reports without human intervention

    Jan 1, 2011

  • CIM
    Regional Issues Working Group

    By Bill Almdal

    Today?s presentation ? Role of the Regional Issues Working Group ? What does RIWG do? ? How can RIWG?s work benefit Stakeholders? ? Review of forecasts vs. reality ? How have past investment comp

    May 1, 2002

  • CIM
    Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information Technology

    By Gregory A. Johnson

    Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a

    Feb 1, 2008

  • CIM
    A Review of Flotation Columns Application in Rougher Circuits

    By M. Massinaei, M. R. Yarahmadi, S. Zeidabadi, M. Oliazadeh

    "Although the majority of new flotation column installations continue to be for cleaning or recleaning, an increasing number of flotation projects are specifying columns for roughing or scavenging dut

    Jan 1, 2011

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011

  • CIM
    Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface Layers

    By Martin Kesting

    The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco

    Oct 1, 2009