  • AUSIMM
    Power Generation Utilising Mines Gas

    By Callinan AN

    Broken Hill Proprietary Company Limited have recently commissioned a 14 Megawatt power station adjacent to its underground coal mining operation at Appin NSW. The power station is fuelled by metha

    Jan 1, 1987

  • AUSIMM
    Water Recovery From a Mine in the Atacama Desert

    By H Plewes, A Bur, L Murray, J Pottie

    Water recovery from tailings for reuse in mineral processing is essential to operation of mines in the Atacama Desert of Chile. With annual rainfall of 5 mm, the prudent and efficient use of available

    Jan 1, 2003

  • AUSIMM
    Robust flexibility – a methodology for agile systems engineering in mining

    By D Brown, Z Tabor

    Projects must be flexible to account for the rapid development of new technologies and changing stakeholder expectations. Coupled with calls for bleeding-edge solutions, customers, shareholders, and r

    Sep 1, 2024

  • AUSIMM
    Predicting Slope Stability in Open Pit Gold and Coal Mines

    By L Clarke, R N. Campbell, F Bourke, J Anderson

    Lithological units have been classified geotechnically with mechanical tests and discontinuity measurements from the GRD Macraes Limited, Macraes Gold Project and Rotowaro coal mine open pits, New Zea

    Jan 1, 2000

  • AUSIMM
    The Soft Ground Bored Tunnel Under Sydney Airport

    The New Southern Railway (NSR) involves the excavation of approximately 10 km of single bore tunnel from Tempe Reserve, Tempe, to Prince Alfred Park (PAP). PAP is located just south of Central Railway

    Jan 1, 1999

  • AUSIMM
    MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed Grades

    By R Wynn, T J. Akroyd, C Costa

    In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed

    Sep 1, 2014

  • AUSIMM
    The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging Conditions

    By V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard

    This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil

    Sep 18, 2012

  • AUSIMM
    Improving the Granulating and Sintering Performance by Pretreating Concentrates Using a Roller Press

    By D Q. Zhu

    In this paper, the pretreatment of concentrates by roller press was present to improve the granulation of blends comprising some 30 per cent iron ore concentrates and enhance the sintering performance

    Jul 11, 2011

  • AUSIMM
    Secondary Breakage Practice at the DOZ Block Cave Mine

    By A Sinuhaji, H Kalangi, T B. Setyoko

    Ore fragmentation at the DOZ block cave mine is highly variable, both as a function of rock type and column height of draw. Initially, the mine was constructed and equipped with limited capability to

    Jan 1, 2005

  • AUSIMM
    The Assessment of Rock Breakage and Damage in Crushing Machinery

    By Bearman R. A

    The majority of published material regarding the operation of crushing machinery is concerned with simulation of performance rather than design of equipment. The reason underlying the bias in publi

    Jan 1, 1995

  • AUSIMM
    Four-Pass Loading ù Must-Have or Myth?

    It is hypothesised that increasing the number of loading passes will produce a reduced range of truck payload outcomes compared with four-pass loading. The paper provides analysis to support this hypo

    Jan 1, 2003

  • AUSIMM
    Managing continuous improvement of Mine to Mill begins with measurement

    By J Loeb, R Ramanathan, H Ingham, P Cameron

    Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd

    Nov 8, 2021

  • AUSIMM
    Behavior of Minor Elements in the Roasting of Zinc Concentrate

    By Kato T, Eguchi M, Seino T, Itagaki K, Kimura T, Muto T, Shimizu T, Kobayashi T

    Behaviour of minor elements in the dust collecting system connected with fluidized bed roaster for zinc concentrate was investigated by use of the bench scale experimental appara- tus. The dust col

    Jan 1, 1980

  • AUSIMM
    Exploration of Porphyry Copper Lithocaps (7b4c8dbd-2256-4f4e-a1fc-af8b844fc435)

    Lithocaps are potentially voluminous zones of advanced argillic and associated argillic alteration located above the subvolcanic intrusive environment. They constitute exploration objectives for epit

    Jan 1, 1995

  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    Spoil Pile Erosion Prediction - How Far Have We Advanced?

    By Aspinall T. O, Loch R. J, Bell L. C

    Design of reshaped spoil surfaces is an important pan of rehabilitation of spoil piles resulting from open-cut coal mining. To achieve the optimum design, it is necessary to make accurate predictions

    Jan 1, 1992

  • AUSIMM
    Blast Monitoring : From Detonation to Impact

    The intention of this paper is to examine the practical and technical aspects associated with the measurement of blasting related phenomena. The emphasis is directed towards the acquisition of quan

    Jan 1, 1990

  • AUSIMM
    Application of enterprise optimisation considering ultra high intensity blasting

    By J Pan

    This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl

    Nov 21, 2018

  • AUSIMM
    Geology of the Enterprise Mine, Pine Creek, Northern Territory

    Gold mineralisation at the Enterprise Mine, 230 km south of Darwin, occurs within folded and metamorphosed sediments of the Lower Proterozoic Burrell Creek Formation adjacent to the Cullen Granite

    Jan 1, 1984

  • AUSIMM
    Mining for Water - Partnering for Sustainable Water Use in Semi-Arid Regions

    By N Lefebvre, M Jakeman, R Aseervatham

    Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr

    Jan 1, 2006