Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Computing from a Remote Mine SiteBy Giedl JG
Technical applications of computers within the coal industry are expanding rapidly with an increase in the number of users and user locations. Collinsville Coal Company Pty Ltd is an example of a
Jan 1, 1983
-
Methane-INFO - Graphical, Three-Dimensional Planning and Information System for the Simulation and Prediction of the Methane Emission of Mine DesignBy Ruschitzka C
The productivity and economic success of a German hard coal mine is attributed to the high productivity of a small number of operation points; however high rates of production are associated with in
Jan 1, 1995
-
Maximising the value of a drilling program – case study in a challenging environmentBy A A. Latscha, D O’Connor
Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO
May 24, 2023
-
The Thermodynamics of Zinc Oxide in Iron Silicate SlagsBy Lee H. G, Li H, Hayes P
Slag from the smelting of lead can contain up to 20 per cent zinc as an oxide. An understanding of the lead smelting process and of the subsequent fuming process for the recovery of zinc is enhanced
Jan 1, 1993
-
Metal Balance for Olympic Dam Using a Standard Industrial Software PackageBy R Gilbertson, N Freeman
Metallurgical accounting is key to the control and production planning process of any mining operation. This is even more crucial for complex operations involving mining, concentration, smelting, refi
Jan 1, 2002
-
Resources and Reserve Assurance Processes – a Framework for Improved GovernanceBy L J. de Lange
As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur
Jun 22, 2016
-
Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score
Jan 1, 2004
-
Inrushes and SubsidenceBy S Harvey
An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu
Jan 1, 1998
-
Reducing the Cost of Drill and Blast Tunnel Work by Use of Tunnel Operations AnalysersBy Maidl B
A tunnel operations analyser is a new high technol- ogy instrument for use in underground work. By remotely sensing the acoustic emissions from operating machines and processes in a tunnel or shaft
Jan 1, 1987
-
Integrated Automatization of Longwall Mining SystemBy Esaki M, Nishimura K
This paper describes the results of the field application tests at Miike Colliery on the integrated automatization of the longwall mining system for medium thick coal seam. The purpose of the rese
Jan 1, 1987
-
Screening Efficiency RevisitedAs partition curves are widely employed to characterize screening efficiency which, by definition, should include a time parameter, it is shown, perhaps for the first time, that time is already in
Jan 1, 1984
-
Linking safety factor to probability of failureBy S M. Gover
Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty
Jul 23, 2018
-
High-speed Video – An Essential Blasting ToolBy S Wellink, D Chalmers, D Adermann, C Martin
The practice of recording blasts for quality control purposes has been conducted for several decades. However, at the low frame rates of a standard video camera, essential data is frequently missed as
Aug 24, 2015
-
Australian Participation in the Ocean Drilling Program: an Economic Geology Perspective (Australian ODP Secretariat, Department ofEarth Sciences)By Rowena C. Duckworth
The Ocean Drilling Program (ODP) is the largest international geoscience project in the world, and the state-of-the-art drill ship, the JOIDES Resolution, is permanently at sea. Each year there are s
Jan 1, 1995
-
The Impact of Classification on the Energy Efficiency of Grinding Circuits - The Hidden OpportunityBy W Valery, A Jankovic
A growing demand within the minerals industry for sustainable development and the introduction of carbon taxes have resulted in a significant focus on improving the energy efficiency of comminution ci
Oct 29, 2012
-
Applications of Exhaust Steam Turbines to The Power Plants of Mines.The cost of power is an important matter to mining companies generally and this thought that the members of the Australasian Institute of Mining Engineers, as well as the engineering and mining profes
Jan 1, 1911
-
The PUTRA Light Rail Transit (LRT) System Two in Kuala Lumpur: Tunnelling a Case StudyOn 15 August 1998 the first section of the PUTRA LRT system was opened to the public as a free service prior to official commencement of revenue service on 1 September 1998. It is a remarkable achieve
Jan 1, 1999
-
Supervisory Control of Bass Strait Oil and Gas ProductionEsso-BHP have installed a Production Supervisory Control System that is presently controlling the offshore oil and gas facilities on the Barracouta and Marlin platforms from an onshore master station
Jan 1, 1970
-
Environmental Impact Assessment For A Silica Sand Quarry In A New South Wales Coastal Recreation ReserveBy Longworth C. R
Competing requirements for land usage sometimes make the correct all- ocation difficult. The decision can be complicated by many factors such as local resident pressure, previous government decisio
Jan 1, 1976
-
A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out TestsThis study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.
Dec 6, 2010