Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Study of Anomalous Copper-Lead-Zinc Values in Relation to Rock Types and Weathering Profiles in an Area North of Mount ISA

    In an area north of Mowit Ica chip sampling of limonitic outcrops on a regional scale led to the investigation of a number of areas considered to be geochemically anomalous for copper and zinc. Th

    Jan 1, 1973

  • AUSIMM
    Modelling of Froth Transportation in an Outokumpu 3 m<sup>3</sup> Tank Cell

    By J-P Franzidis, E V. Manlap

    Froth transportation characteristics have a significant impact on the flotation recovery especially in large flotation cells. The probability of an attached particle being recovered into the concentra

    Jan 1, 2005

  • AUSIMM
    Reserve Data for Project Planning

    Efficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v

    Jan 1, 1987

  • AUSIMM
    Setting Restoration Goals for Restoring Pit Lakes as Aquatic Ecosystems – A Case Study from Southwest Australia

    By E J. B van Etten

    Pit lakes may form when open cut mining leaves a pit void that then fills with ground and surface waters. This often replaces terrestrial ecosystems that existed prior to mining with an aquatic ecosys

    Oct 5, 2011

  • AUSIMM
    The Importance of Data Collection to the Blasting Process

    By J Hutchings

    An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat

    Nov 8, 2011

  • AUSIMM
    A Zinc-Lead Ore Mine Water Contamination by a Paper Factory Fluid Waste

    By Motyka J, Adamczyk AF, Witczak S

    A case study of migration of a paper factory fluid wastes, on the distance of 5 km from an underground disposal site to an ore mine is presented. The ore mine in question, situated in SW Poland is

    Jan 1, 1988

  • AUSIMM
    The Planning and Methods Used at Selby in the Design of High Productivity Systems

    British Coal&apos;s Selby Complex is the newest producing mine in the United Kingdom. The reasons behind its origins, planning and design are explained. Some detail is given of equipment used, with th

    Jan 1, 1991

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Methane-INFO - Graphical, Three-Dimensional Planning and Information System for the Simulation and Prediction of the Methane Emission of Mine Design

    By Ruschitzka C

    The productivity and economic success of a German hard coal mine is attributed to the high productivity of a small number of operation points; however high rates of production are associated with in

    Jan 1, 1995

  • AUSIMM
    The Engel Model-A Simulator for Optimizing Exploration Effort

    By Rowlands N. J, Zimmermann D. O

    The Engel Model search simulator is described with particular emphasis on preparation of input parameters. The computer has a "black box" role in the same way a telephone or radio is a "black box"

    Jan 1, 1974

  • AUSIMM
    Analysis of Twin Road Tunnels Using Numerical Modelling Techniques

    By D R. Wines

    The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi

    Mar 8, 2011

  • AUSIMM
    Computing from a Remote Mine Site

    By Giedl JG

    Technical applications of computers within the coal industry are expanding rapidly with an increase in the number of users and user locations. Collinsville Coal Company Pty Ltd is an example of a

    Jan 1, 1983

  • AUSIMM
    Metal Balance for Olympic Dam Using a Standard Industrial Software Package

    By R Gilbertson, N Freeman

    Metallurgical accounting is key to the control and production planning process of any mining operation. This is even more crucial for complex operations involving mining, concentration, smelting, refi

    Jan 1, 2002

  • AUSIMM
    Fire Modelling in Underground Mines using Ventsim Visual VentFIRE Software

    By D J. Brake

    The risk from fire remains one of the most serious of underground mine disaster scenarios. The impacts of mine fires on the underground ventilation system and the production of toxic gases have been d

    Jul 1, 2013

  • AUSIMM
    Building AsiaÆs Latest Hard Rock Mine

    By T J. V Duffy, L H. D Siahaan, P G. Albert

    G-ResourcesÆ Martabe Mine in North Sumatra, Indonesia, is a US$700 M world-class and world-scale operation in a country which, with a few notable smaller scale exceptions, has had no significant hard

    Nov 20, 2012

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    Practice and Prospects for Methane Predrainage to Prevent Outbursts in Coal Mines In the Congqing Area

    Most coal mines in Chongqing Area are highly gassy mines and liable to outburst of coal cnd methane. In order to harness mine environment and raise the Prodction capacity, methane predrainage is gener

    Jan 1, 1991

  • AUSIMM
    Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)

    Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score

    Jan 1, 2004

  • AUSIMM
    Challenges in Modelling Large Complex Orebodies at the George Fisher North Mine

    By M Haydon

    How do you portray a large structurally and stratigraphically complex deposit to return a meaningful resource estimation, and produce a geological model that is useable for planning on a daily basis?

    Jan 1, 2006

  • AUSIMM
    Australian Participation in the Ocean Drilling Program: an Economic Geology Perspective (Australian ODP Secretariat, Department ofEarth Sciences)

    By Rowena C. Duckworth

    The Ocean Drilling Program (ODP) is the largest international geoscience project in the world, and the state-of-the-art drill ship, the JOIDES Resolution, is permanently at sea. Each year there are s

    Jan 1, 1995