Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Test Work and Design of a Gravity Circuit for Iron Road’s Central Eyre Iron Project

    By G J. Showers, P Botman, A G. Hunt

    Iron Road Limited (Iron Road) is currently evaluating the feasibility of producing 21.5 Mt/a of high-grade (>66 per cent Fe) magnetite concentrate from a 3.7 Bt resource (JORC) located at Warramboo

    Jul 13, 2015

  • AUSIMM
    Structural Controls on Gold Mineralisation in the South-eastern Truong Son Fold-thrust Belt and its Significance in Regional Metallogeny

    By T X. Le, H T. Tran, K Zaw, T Manaka

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Truong Son fold-thrust belt (TSFTB) is a prominent tectonic component of mainland Indoc

    Mar 18, 2015

  • AUSIMM
    Olympic Dam open stope observations, tactics and characterisation

    By G Capes, L Morizzi, N Mitkas, E Jones, D Grant

    This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 yea

    Mar 15, 2021

  • AUSIMM
    Blasting Logistics at Rio Tinto Coal Australia's Hail Creek Mine

    In March 2003, Rio Tinto Coal AustraliaÆs (RTCA) new Hail Creek open cut coal mine commenced operations in the Bowen Basin. Hail Creek is a two-seam strip mining operation utilising two 90 m3 dragline

    Jan 1, 2007

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Coal Resource Planning in the Hunter Region

    By Short KC

    The Hunter Region, with a major part of the coal resources of New South Wales and a long history of coal mining, has experienced a rapid expansion of coal resource development in recent years. Whi

    Jan 1, 1987

  • AUSIMM
    Dynamic Simulation of Size Reduction Operations from Mine to Mill

    By Pate W. T

    This paper describes the development of a dynamic flowsheet simulator for comminution operations. Object oriented software design allows the handling of multiple ore types, blended into multicompone

    Jan 1, 1998

  • AUSIMM
    Effect of Flotation Feed Density on the Operation of a Flotation Cell

    By R Crosbie, K C. Runge, E Tabosa, J K. McMaster

    Flotation feed density is an operating parameter which is currently not well understood. Most models of flotation only incorporate its effect on particle residence time, but it is likely to have addit

    Oct 29, 2012

  • AUSIMM
    Automated, online measurement of bulk material size distribution on conveyor using 3D profile imaging at Boliden Mines

    By M J. Thurley, L Lindqvist, D Degerfeldt, J Nyström, R Nordenskjöld

    Rock breakage is a major component of all mining and mineral processing operations with the particle size distribution linked to productivity through the comminution chain. Optimisation and automatic

    Aug 29, 2018

  • AUSIMM
    Iran Mining Industry Based on the 20-Year Perspective 2025

    By F Rashidinejad

    Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many

    Nov 22, 2011

  • AUSIMM
    Development of a Low-cost Instrument for Barometric Pressure Surveys

    By A S. Derrington

    High-accuracy, solid-state digital reference barometers have proven to be well suited to conducting underground barometric pressure surveys. The only problem is their expense; at least A$4000 each. Fo

    Aug 31, 2015

  • AUSIMM
    Improvements in estimating strengths of loose tailings: results from the TAILLIQ research project

    By D Reid, J Vinod, M Rahman, A Fourie, T Vo, J Ayala, A Russell

    This paper reports on an industry and Australian Research Council funded research project, TAILLIQ, that is a joint initiative between four Australian Universities. The paper discusses the accuracy wi

    Jul 1, 2021

  • AUSIMM
    Selection of undrained shear strength parameters of residual soils and their application in stability analysis

    By Y Xu, T Rowles, B Dareeju, A Dissanayake

    Recent updates on tailings dam design guidelines require analysis of undrained (short-term) stability with the application of the SHANSEP model. The SHANSEP model, which was originally developed for a

    Jul 1, 2021

  • AUSIMM
    Work-Life Balance and Atypical Working Hours: Does FIFO Pass the Epicurean Test for Happiness?

    When I was first asked to give a paper on work-life balance in the mining industry I was both excited and aware of the incongruity of my position. I have never worked in mining operations nor have I h

    Jan 1, 2005

  • AUSIMM
    Financial Modelling with the Auditor in Mind

    By S G. Gemell

    "The financial model is an integral component of any project evaluation based on mineral resources, ore reserves and (at least internally) exploration targets. Given the unity of purpose for preparing

    Mar 8, 2016

  • AUSIMM
    Climate Alarm's Lessons for New Leaders - Overcoming Fear with Facts for Freedom

    People in economically developed societies demonstrate inherent human care for Earth and want to stop pollution. Yet efforts to clean Earth seem bogged in confusion from wildly contradictory and alarm

    Jan 1, 2009

  • AUSIMM
    Stratigraphy of the Marra Mamba Iron Formation within the Chichester Range and its Implications for Iron Ore Genesis at Roy Hill - Evidence from Deep Diamond Drill Holes within the East Fortescue Valley

    By P Hawke, J Hurst, B KrapeP

    Hancock Prospecting Pty Ltd (HPPL) drilled two deep diamond stratigraphic holes (ECD0001 and RHD0296) within the eastern Fortescue Valley in the Pilbara of Western Australia. Located south of the Roy

    Aug 12, 2013

  • AUSIMM
    Gold-Rich Porphyry Copper Deposits of the Circum-Pacific Region - an Update Overview

    Gold-rich porphyry copper deposits areimportant sources of gold in the circum-Pacific region: 26 major deposits contain >7000 tonnes of gold. The deposits occur in a variety of subduction-related sett

    Jan 1, 1990

  • AUSIMM
    Curved Pulp Lifters – Can They Save Energy?

    By R J. Soriano, S Ciutina

    The Masbate gold deposits are situated on the island of Masbate, 350 km south of Manila. A new plant was commissioned in April 2009. The grinding circuit consists of one semi-autogenous (SAG) mill Ø9.

    Sep 1, 2014

  • AUSIMM
    The Konongo Gold Project, Ghana – An Example of How Geology Makes All the Difference to a Resource Estimate

    By R Sterk, B Reid

    The Konongo Gold Project is located on the western margin of the 125 Moz Ashanti Gold Belt in Ghana, West Africa. It is situated 60 km along strike of the world-class mineral system at Obuasi and is i

    Aug 18, 2014