    The effect of vane shear rotation speed on the estimation of tailings undrained strength

    By B Wentzinger, Y Keulemans

    This paper presents the results of a field study designed to assess the impact of vane rotation speed on the estimated undrained strength for two Australian bauxite tailings storage facilities. The va

    Jul 1, 2021

  • AUSIMM
    Review of Australian Longwall Panel Ventilation Practices

    By S Gillies, H W. Wu

    A study has been undertaken into mine ventilation systems currently in use within Australian modern coal longwall (LW) extraction mines. It reviews systems and discusses evolving changes being adopted

    Jul 1, 2013

  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    Anglo American Research LaboratoriesÆ (AARL) Experiences with Flotation Plant Modelling

    By V Ser, R Crosbie

    To date, Anglo American Research Laboratories (AARL) has carried out several projects, based on the techniques developed in AMIRA International LimitedÆs (the mineral industries research association)

    Jan 1, 2005

  • AUSIMM
    Critical and Deleterious Metal Deportment in Sulfidic Waste Rocks, Baal Gammon, North Queensland

    By A Parbhakar-Fox, B G. Lottermoser, N Fox

    "Determining the deportment of economic and environmentally significant elements in sulfidic mine materials (eg ore, gangue and waste) requires the use of advanced microanalytical techniques, includin

    Jun 15, 2016

  • AUSIMM
    Regional Geology and Tectonic Evolution of Alaska and Adjacent Parts of the Northeast Pacific Ocean Margin

    The western Cordillera of North America, including more than 99% of Alaska, is made up of an agglomeration of litho-tectonic terranes, some of which have undergone large rotations and (or) translation

    Jan 1, 1990

  • AUSIMM
    The Application of Value Engineering Principles to Mining Studies

    By T Schrimpf, I Bryan

    The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the

    May 24, 2012

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Application of RISKGATE to Coal Mine Tailings Dams

    By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe

    RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan

    Jul 16, 2014

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AUSIMM
    Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG mill

    By N S. Weerasekara, S Town, E Lessing, J A. De Torres

    Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi

    Aug 29, 2018

  • AUSIMM
    Sampling for Grinding Pilot Plant Test - The Effect of Size Distribution Variability

    By S Brochot

    During the development of a mining project, samples are taken for metallurgical tests. The sample can be a composite sample made of material coming from a selection of various drilling products or a s

    Aug 21, 2012

  • AUSIMM
    Sampling and blending in geoenvironmental campaigns – current practice and future opportunities

    By A Parbhakar-Fox, S C. Dominy

    The prediction of acid and metalliferous drainage (AMD) from mine waste materials is critically important during all stages of the mine value chain. However, to determine such geoenvironmental charact

    May 9, 2017

  • AUSIMM
    Modelling multi-seam interactions for longwall mining

    By A Lines

    This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan

    Nov 30, 2018

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Advances in Particulates Aggregation-Flotation Separation

    By J Rubio

    This work presents design features of an innovative in-line mixing helical (coiled) reactor for flocculation and flotation as a solid-liquid separation process for suspended particles (including liqui

    Jan 1, 2005

  • AUSIMM
    Enhance Fine Particle Flotation by Hydrodynamic Cavitation

    Enhance Fine Particle Flotation by Hydrodynamic Cavitation Difficulties in fine particle flotation are well documented. Microbubble flotation has been found to greatly improve the recovery of fine pa