Admixture use in cemented rock fillBy B Roache, J O’Brien, M Gray
Admixture use in cement products is commonplace in the construction and mining industries. Many Australian mines have an operational concrete batch plant and stock hydration control and water reducing
Nov 29, 2022
-
Pre-concentration by screening – a cost-effective approach to testing and evaluationBy N Clarke, A Barros
Preconcentration of run-of-mine subgrade and marginal ore by screening has the potential to substantially improve the economics of mining, particularly for large, low-grade orebodies, and to reduce en
Aug 24, 2022
-
Determination of Bulk Density in Anglo American plc, Methods and Impacts, with a Case Study from Los Bronces MineBy R M. Arellano, D M. W Harney, M Makhuvha
Mineral resource and ore reserve estimates are founded on two sources of data: tonnage and grade. The tonnage is a product of volume and density; both of which are estimates. Density impacts numerous
Aug 18, 2014
-
Developing a best practice framework for inrush risk managementBy L Manca, P B. Hills, D Tyler, N Pollington
This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in
Mar 15, 2021
-
A review of risk management for tailings dams; learnings from other high hazard industriesBy M Erskine, R Mills
This paper approaches tailings dam risk management from the perspective of how other high hazard industries approach the management of their catastrophic event risks, with the aim to provide recommend
Jul 1, 2021
-
The McArthur Lead-Zinc-Silver Deposit (6bbc0ffa-ed17-44c3-ba3c-758c85cd106f)By Jephcott S
The McArthur lead-zinc-silver deposit is of the stratiform type. It consists of a mineralized bituminous shale sequence containing some tuffites, numerous graded beds and isolated slump breccia horizo
Jan 1, 1980
-
George Fisher Mine - Feasibility and ConstructionBy G S. B Karunatillake
Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million
Jan 1, 2000
-
Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite ConcentratesBy D R. Seaman, B Adamson, F Burns, B A. Seaman, P Manton
The Telfer concentrator, located in the Great Sandy Desert of Western Australia, consists of a dual train gold/copper operation processing ore from one underground and, currently, two open pit mines w
Oct 29, 2012
-
The Marvel Loch Crusher Product Sampling SystemThe Marvel Loch Operations (MLO) plant was treating ores from up to six MLO sources and in addition needed to blend externally sourced ores with its own ores. This presented a metallurgical accounting
Mar 1, 2010
-
An Evaluation of Pricing and Allocation Methods Under the Crown Minerals Act 1991The Crown Minerals Act provides a new+framework for the management of Crown owned minerals and requires that regard be had for the principles of the Treaty of Waitangi. The Act requires the preparatio
Jan 1, 1992
-
Commissioning of the Kanmantoo Copper ConcentratorBy J Seppelt
The Kanmantoo Copper Project is owned and operated by Hillgrove Resources Limited and is situated in the Adelaide Hills region in South Australia. Mining in the area has taken place off and on over th
Oct 29, 2012
-
Using Best Practice Operations as a Strategy for Attracting and Retaining Professional PeopleBy T Trott, G Lumley
"The mining industry suffers from a shortage of professional and other workers. Research and analysis has demonstrated a close correlation between high performance in productivity, maintenance and saf
Nov 20, 2012
-
Effect of Carbon Type on Adsorption of Cu, Zn, Ag and Au from Mixed Cyanide SolutionBy S Lakemond, L I. Ku, J Vaughan
Conventional processing of poly-metallic gold containing flotation concentrates are challenging for a number of reasons. One reason is that substantial copper and zinc in the cyanide leach solution co
Sep 26, 2013
-
The application of secondary crushing at the Jundee gold mineBy S Tyrrell, B Jackson, K Matson
Northern Star Resources Limited Jundee Gold Mine in Western Australia operates a comminution circuit that consists of a primary crusher, 3.85 MW semi-autogenous grinding (SAG) mill, 1.8 MW ball mill a
Aug 29, 2018
-
An investigation of gyratory crusher liner wear at the Telfer Operation using non-operational streamlined modellingBy J Harding, S Munro, R A. Bearman
Despite the importance of the primary crushing stage, performance optimisation is not well analysed with sufficient focus to give improvement opportunities. At the Newcrest owned Telfer operation, lin
Aug 24, 2022
-
Pillar Recovery at Cracow Gold Mine using Grouted Consolidated MullockBy V Mutton, L Potts, D Joyce
This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially su
Mar 26, 2012
-
Instrumented column testing of salt uptake from compacted red mud into a coverBy Y Zhu, D J. Williams, M O’Neill, C Zhang, X Lei
A cover of inert material overlain by topsoil is required over compacted, seawater-neutralised red mud, a waste product from the refining of bauxite to produce alumina. The cover is to be revegetated,
Jul 23, 2018
-
Wall Control BlastingBy D P. Blair
There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential
Aug 24, 2015
-
Development of a Sustainability Roadmap for the Kwinana Industrial Area, Western AustraliaBy M John
The Kwinana Industrial Area (KIA) is by far the largest and most diverse industrial processing region (with supporting industries) in Western Australia. As with elsewhere in Australia (and globally),
Jan 1, 2009
-
Development in Cut and Fill Mining at ISA MineBy Jansen N
Production from the narrow, high grade silver-lead-zinc orebodies below 15 level commenced in mid 1985.Geological, mining research and recent mining experience determined that a mechanised drill, fire