Search Documents

  • NIOSH
    OFR-134-83 Mine Waste Location By Satellite Imagery

    By Michael A. Anuta

    This report describes the potential for utilization of satellite observations for remote sensing of mine waste disposal areas. Four study sites consisting of metal and nonmetal mining areas in differe

    Jan 1, 1982

  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.

    By M Lipalile, A B. Tunono, A W. Naismith

    Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • NIOSH
    RI 8547 A Mixed Kinetics Dump Leaching Model for Ores Containing a Variety of Copper Sulfide Minerals

    By B. W. Madsen

    To help maintain an adequate supply of minerals to meet national economic and strategic needs, the Bureau of Mines developed a mathematical model that describes acidic ferric sulfate leaching of coppe

    Jan 1, 1981

  • AUSIMM
    Life of Coal Pillars and Design Considerations

    Following the Coalbrook Colliery disaster in 1960, Salamon and Munro (1967) established the well known empirical coal pillar strength formula in South Africa. This formula has prevented further violen

    Nov 25, 2010

  • IOM3
    Metallogenic evolution of the Scandinavian Caledonides

    By F. M. Vokes, P. M. Ihlen

    Paper presented at Mineralisation in the Caledonides, the Mike Gallagher memorial meeting held in Edinburgh, 27-28 June 1996. Ore deposition was related to three major stages: continental rifting and

    Jun 19, 1905

  • NIOSH
    RI 9335 - Production of Lead Metal by Molten-Salt Electrolysis With Energy-Efficient Electrodes

    By J. E. Murphy

    The u.s. Bureau of Mines investigated electrode designs for electrowinning lead metal from a LiCl-KCl-PbCI2 electrolyte at 4500 C. The major objective of this investigation was to decrease the energy

    Jan 1, 1991

  • AIME
    Institute of Metals Division - Discussion: Investigation of Room-Temperature Slip in Zone-Melted Tungsten Single Crystals

    By J. Richter, D. Schulze

    J. Richter and D. Schulze (Deutschen Akademie der Wissenschafte zu Berlin)—Introduction. In a recent paper R. G. Garlick and H. B. Probst reported on experimental results of investigations of room-tem

    Jan 1, 1965

  • AIME
    Preliminary Production Report From the Bureau of Mines

    A record $18.7 billion worth of metals, non- metals and fuels was produced in the U.S. during 1962, according to a year-end estimate from the USBM. The 1962 total value, based on preliminary statistic

    Jan 2, 1963

  • NIOSH
    IC 8056 Yieldable Steel Arches And Yieldable Steel Ring Supports In Metal Mines ? Introduction And Summary

    By N. A. Eilertsen

    This paper presents the results of intermittent study begun in 1956 by the Federal Bureau of Mines of yieldable steel arches and yieldable steel ring sets installed for support of development openings

    Jan 1, 1962

  • AUSIMM
    Rock fill consolidation for the extraction of sill pillar stopes at Toguraci gold mine

    By A Proudman, J Isles, R Lawolo, G Forster

    PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates two underground

    Oct 16, 2017

  • CIM
    The Midas Pond Gold Prospect, Victoria Lake Group, Central Newfoundland: A Mesothermal Quartz Vein System with Epithermal Characteristics

    By Derek H. C. Wilton, David T. W. Evans

    "Abstract - The Midas Pond gold prospect, central Newfoundland, is hosted by sheared and altered felsic and mafic pyroclastic rocks of the Tulks Hill volcanics, Victoria Lake Group, and has been trenc

    Jan 1, 2000

  • CIM
    Improved flow-through share rules

    By Robert B. Parsons

    "Canada's mining industry has reason to celebrate the federal government's budget which was tabled on February 26, 1986. The budget contains an important proposal to improve the flowthrough

    Jan 1, 1986

  • AUSIMM
    Government Coodrination and Liaison: The Lihir Project

    By Van Dusen M

    The involvement of concerned parties in all aspects of the Lihir Project from an early stage has promoted good relations between all groups. Activities involving landowners, the Lihir community, t

    Jan 1, 1991

  • SME
    Creation Of An Underground Mine Development Sequencing Optimizer

    By M. J. Blattman

    Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret

    Jan 1, 2003

  • CIM
    Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

    By B. Krysa, J. Qiu

    The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes pe

    Jan 1, 2008

  • IMMS
    The Resource Potential of the Slow-Spreading TAG Segment at 26°N, Mid-Atlantic Ridge: Evidence from AUV-Based Exploration

    By Isobel Yeo, Florent Szitkar, Sven Petersen, Sebastian Graber, Nico Augustin, Marcel Rothenbeck, John Jamieson

    "INTRODUCTIONSeafloor massive sulfides (SMS) along mid-ocean ridges are often seen as a possible future contribution to a secure metal supply for global human needs. A growing interest over the past f

    Jan 1, 2017

  • SAIMM
    Technical skills?a major strategic issue - Synopsis (fe76e3c8-f6c3-411a-a6dd-39c52c339bd0)

    A shortage of technical skills in all areas of the mining industry is being experienced worldwide. This has significant consequences for design, operations, productivity and safety and, therefore, nee

    Jan 1, 2008

  • AUSIMM
    Shaft construction at the Gold Fields Wallaby mine

    By J Graaf, R A. Murrell

    Gold Fields Australia is constructing two major ventilation shafts at the Wallaby gold mine in Western Australia. The new ventilation shafts are required to facilitate the long term ventilation strate

    Oct 16, 2017

  • IOM3
    Development of seismic risk assessment method for application to rockburst-prone sites in deep-level South African gold mines

    By R. D. Stewart

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 18pp., 5 refs. A seismic

    Aug 1, 1995

  • AUSIMM
    Coal seam gas predrainage optimisation through an enhanced knowledge of coal seam permeability

    By M Blanch

    Gas management practices across the Australian underground coal industry have evolved significantly since the early nineties with the introduction of hazard management plans, directional drilling tech

    Aug 28, 2017