Search Documents

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SAIMM
    The Influence of Niobium Content on Austenite Grain Growth in Microalloyed Steels

    By C. W. Siyasiya, K. A. Annan, W. E. Stumpf

    "SynopsisThe relationship between niobium content and austenite grain growth has been investigated through hot rolling simulation on a Bähr dilatometer. The effect of delay time between passes during

    Jan 1, 2015

  • CIM
    Suivi non-destructif de l?évolution de la résistance mécanique des remblais cimentés en pâte: application de la résistivité et de la micro-sismique en laboratoire

    By Serge Ouellet

    Résumé Six modèles métriques de remblai cimenté en pâte (RCP) ont été suivis durant 120 jours par l?utilisation de deux méthodes géophysiques non-destructives : la résistivité et la micro-sismique.

    Feb 1, 2008

  • AUSIMM
    Plant-Based Trials of Monitoring of Coal Flotation Systems Using Electrical Impedance Spectrum Technique

    Plant-Based Trials of Monitoring of Coal Flotation Systems Using Electrical Impedance Spectrum Technique

    Sep 13, 2010

  • CIM
    Novel Processes for Treatment of Syncrude Fine Transition and Marine Ore Tailings

    By X. S. Yuan

    With the production increase of Oil Sand in Fort McMurray Alberta, more efficient tailings disposal has become a priority for Syncrude Canada Ltd. A lot of work on tailings research and development ha

    Jan 1, 2006

  • SME
    Leaching Practices At Smoky Valley Mine

    By C. Arthur Lefler

    The hydrometallurgical processes for recovery of gold and silver in use at Round Mountain, Nevada and the practical aspects of the operation are discussed. Included are heap leaching by cyanidation, u

    Jan 1, 1981

  • CIM
    Developing Operation, Maintenance and Surveillance Manuals for Tailings and Water Management Facilities

    By Ian Bruce

    Tailings and water management facilities are essential and integral components of mine and mill operations. They must be managed for the long term in order to ensure that safe and environmentally resp

    May 1, 2002

  • AUSIMM
    The Effect of Copper on Fire Assaying Processes for the Determination of Silver

    If lead buttons are cupelled under closely controlled conditions in a suitable design of furnace, silver losses during cupellation are given by a simple equation. The effect of copper on these silver

    Jan 1, 1957

  • DFI
    Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA

    By Jerry F. Parola

    In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi

    Jan 1, 1986

  • AUSIMM
    The Beginnings of Mineral Processing Research in Canada - A Short Account

    The Beginnings of Mineral Processing Research in Canada - A Short Account

    Sep 13, 2010

  • ISEE
    Lightning Detection Technology and Early Warning Systems for Thunderstorms, Including Applications

    By William C. Geitz

    "Lightning has always posed a serious threat to blasting operations, especially wkhin the mining and construction industries and operations involving the manufacture, transport, storage and handling o

    Jan 1, 1991

  • AUSIMM
    The Macraes Gold Mine Development of a Major Resource

    The Macraes Mining Company Limited was listed on the New Zealand and Australian stock exchanges in January 1990, and the proceeds of the float were used to purchase a 70 per cent interest in the Macra

    Jan 1, 1991

  • TMS
    Synthesis Of Al2O3-SiCw Ceramic Matrix Composite By Carbothermal Reduction Of Kaolin

    By Sutham Niyomwas

    Keywords: Al2O3-SiCW, Ceramic Matrix Composite, Carbothermal Reduction, Kaolin The formations of Al2O3-SiCw composite have been obtained in situ by carbothermal reduction of a mixture of kaolin a

    Jan 1, 2005

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2007

  • AUSIMM
    Robustness of Geostatistical Calculations: A Case Study

    A study of drilling data at various stages of development of an orebody show that the semi-variogram, used for calculating the accuracy of block estimates can be ill-defined if too few data are availa

    Jan 1, 1977

  • DFI
    Innovations In Scandinavia

    By Carl-John Grävare

    This paper deals with some of the systems and equipment that are being developed and/or are in use in Scandinavia. The main subject is the development of loading tests on the piles using monitoring eq

    Jan 1, 2000

  • SME
    Keys To Selecting An Expert Electric Motor Shop

    By Fredrick Fränding

    In mining and quarrying operations, electric motors can fail for a variety of reasons. Some failures are directly linked to demanding production requirements and contaminant-laden environments and, co

    Jan 1, 2009

  • AIME
    Institute of Metals Division - On Coincidence Sites (TN)

    By H. P. Stüwe

    HE recent papers of Aust and Rutter112 have again brought to mind the importance of certain "special" orientation relationships between the lattices of two fcc crystals on the mobility of the grain bo

    Jan 1, 1962

  • CIM
    A New Tool for Sag Hardness Testing

    By Glenn Kosick, John Starkey, Glenn Dobby

    "A practical new test has been developed for SAG hardness determination. Using two kilogram samples of minus one inch diamond drill core or crushed muck samples, the Starkey SAG Test has been shown to

    Jan 1, 1994

  • DFI
    Value Engineering – Design Risk and Reward at Major Sport Arena Projects

    By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli

    Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw

    Jan 1, 2018