Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mining and Ore-Treatment at the Talisman Mine, Karangahake, NZTHE Talisman mine is situated on the Waitawheta (pronounced Wytaffetta) river just above its junction with the Chinemuri (pronounced Chinnemurre) river near Karangahake, NZ. The explored reef-bearing
Jan 1, 1912
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation ProjectBy Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Time to take advantage of SME’s newest member benefitBy None None
Use this month wisely — go online and take advantage of your new member benefit. As an SME member, you can read and download for free all of the full-text papers of the Mining, Metallurgy & Exploratio
-
A Magnetic HydrocycloneThe concept of a magnetic hydro-cyclone is undeveloped, possibly because studies by Bragard (1965) and the Royal School of Mines in London (Robinson, 1965) were not encouraging. Its role for the conce
Jan 1, 1984
-
An Evaluation Framework for Virtual Reality Safety Training Systems in the South African Mining IndustryBy E. A. van Wyk, M. R. de Villiers
"Mining companies strive to increase and maintain production, while simultaneously remaining competitive in the global economy. Furthermore, they must ensure workers’ safety and maintain good safety r
May 1, 2019
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, OhioBy Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Development described for fluidized bed combustion at TVA’s 20-MW pilot plantBy James W. Bass
Introduction Atmospheric fluidized bed combustion (AFBC) is an improvement over coal-fired boiler design. It offers several advantages over conventional boilers. AFBC can meet sulfur and nitrogen oxi
Jan 4, 1986
-
Methods to Characterize Very Thin Passive Film Formed in SCW Corrosion TestsBy Jian Li
Developing the Generation IV nuclear reactor is an international collaborative effort. One of the most promising Gen IV nuclear reactor designs is the supercritical water (SCW) concept, in which the w
Jan 1, 2010
-
Achieving the Benefits of Information Technology in Surface and Underground Mining ProcessesBy Sean Dessureault
Information technology (IT) initiatives in the past have tended to be sold on their ability to maximize resource output and return on capital by using assets more effectively and efficiently. Many IT
May 1, 2002
-
All-Flotation at North Broken Hill LimitedAuthor's Note: Since the paper on "All-Flotation at North Broken Hill Limited" was read and discussed, the metallurgical results obtained have conclusively justified the adoption of the
Jan 1, 1931
-
Stope deformation measurements as a diagnostic measure of rock behaviour: a decade of research - SynopsisBy D. F. Malan
This paper presents an overview of work conducted over several years to investigate the continuous stope closure profiles recorded in tabular excavations and the use of this data as a hazard indicator
Jan 1, 2007
-
New York Paper - Comparison of Grain-size Measurements and Brinell Hardness of Cartridge Brass (with Discussion)By W. H. Bassett, C. H. Davis
In the commercial annealing of cartridge brass there are four points regarding which definite data are essential. They have to do with the correct interpretation of grain count in its relation to anne
Jan 1, 1919
-
The Petroleum Industry - Oil Production Greatest in History, With Good Profits, But Some Economic Problems RemainBy S. A. Swensrud
NINETEEN Thirty-Six was the biggest year in volume in the history of the oil industry, and unquestionably the best since 1929 in respect to profits. The quota of new and difficult problems to face see
Jan 1, 1937
-
Geotechnical Mapping By Seismic Imaging In Underground MinesBy W. J. Mcgaughey
A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me
Jan 1, 1989
-
The Role Of Geotechnical Block Models In Mineral Resource Management - 1 IntroductionBy Alan Bye, Megan Little
Geology, and the detailed understanding of its properties, are fundamental to the optimal design and successful operation of any mine. To that end extensive fieldwork has been conducted at Anglo Plati
Jan 1, 2007
-
IC 7278 Some Suggestions on Care in the Use and Handling of Explosives in Coal MinesBy Lloyd G. Fitzgerald
"The dangerous nature of explosives makes them a potential hazard wherever they are used, but they are likely to exercise their greatest harmfulness under conditions inherent in coal mining. The ease
Aug 1, 1944
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and CasinoBy Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
Continuous Improvement - How Changes in Metallurgy can have a Substantive Impact on Environmental Impact and Closure - Lessons Learnt from Environmental AuditingBy G McMillan, P Mulvey
"Geochemical characterisation is done based upon the geology and metallurgical batch testing prior to commencement of the operation of the plant. Tailings repository design is based upon geochem
Jul 15, 2013
-
Record Performance Of TBM In The 13.5 Km Amlach Tunnel, AustriaBy Hans Janzon, Ernst Buechi
INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,
Jan 1, 1987
-
Stochastic Mine Planning Optimization: New Concepts, Applications and Monetary Value in an ever Uncertain MarketBy Roussos Dimitrakopoulos
Conventional approaches to estimating reserves and optimizing mine planning and production forecasting result in single, often biased forecasts. This is largely due to the non-linear propagation of er
Oct 1, 2009