Search Documents

  • SME
    An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern Ontario

    By Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey

    Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter

    Jan 1, 2007

  • AUSIMM
    The Cementation of Metals form Dilute Aqueous Solution

    A rotating disc geometry was used to provide a uniformly accessible surface for a kinetic study of the cementation of cadmium, lead, and silver from dilute aqueous solutions. This work is an extension

    Jan 1, 1971

  • CIM
    Engineered Membrane Separation® (EMS®) Systems for Hydrometallurgical Applications

    By Larry A. Lien

    "A brief summary of the different membrane separation options currently available to the mining industry will be presented and discussed. The processes described involve operating membrane plants on t

    Jan 1, 2010

  • SME
    Reproducibility Of Bond Work Index With Different Standard Ball Mills

    By P. C. Fletcher, E. Kaya

    The Bond grindability testing procedure has been standardized to measure the same grindability values, i.e. Bond work index (BWi), for the same ore when tests are performed in different laboratories o

    Jan 1, 2002

  • CIM
    Parallel Surface Fan Operation At Hoyle Pond Mine

    By M. Desjardins

    The Hoyle Pond underground mine, located in the Porcupine Gold Camp, east of the city of Timmins, Ontario, Canada, is the cornerstone of Goldcorp Canada Ltd?s Porcupine Gold Mines. Cut and fill, shrin

    Aug 1, 2013

  • DFI
  • NIOSH
    OFR-34-84 Evaluation Of Branch And Horizontal Boreholes For In Situ Leach Mining

    By D. W. Dareing

    Multiple branch wellbores and horizontal holes, when applied to deep lying ore bodies, have the potential of significantly reducing well costs by reducing total footage drilled per acre of well patter

    Jan 1, 1980

  • SAIMM
    Determination Of Optimal Cut-Off Grade Policy To Optimize NPV Using A New Approach With Optimization Factor

    By A. Bascetin

    One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off g

    Jan 1, 2007

  • AUSIMM
    Rwanda and the Africa Mining Vision

    By I H. Wilson

    After decades of turmoil, Rwanda launched its Vision 2020 in 2000 aimed at reconstructing government and addressing poverty. Implementation focused on the agricultural sector, infrastructure and educa

    Jul 16, 2014

  • TMS
    Thermodynamic Modeling Of Desilversing Of Lead Bullion By Zinc During Lead Refining

    By Pengfu Tan

    A thermodynamic model has been developed to model the desilverising process of lead by the addition of zinc during lead refining, whereby silver-zinc solid solutions are formed, and floats out of the

    Jan 1, 2005

  • SME
    Pneumatic Backfilling - A Method For Controlling Abandoned Mine Subsidence

    By Steve Jones

    Minor subsidence damage to the Burgettstown Junior-Senior High School building and grounds near Burgettstown, Washington County, Pennsylvania, prompted an investigation of the site in early 1985 by th

    Jan 1, 1986

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • AUSIMM
    Setting Best Practice: FIFO at the Mount Keith Concentrator

    By S O. Hille

    Modern remote mining operations in Australia are more commonly trending towards fly-in/fly-out (FIFO) sites. This trend is driven by numerous factors including increased business centralisation, reduc

    Jan 1, 2002

  • CIM
    The Caustic Crack Route for Processing Concentrate from the Avalon Nechalacho Deposit

    By Dave Marsh, John Goode, Niels Verbaan, Kevin Bradley, Henrie Notzl

    The mineralogy of the Avalon Nechalacho deposit is complex with significant fractions of HREEs, Zr, and Nb found in refractory minerals such as zircon and fergusonite. Sulphuric acid baking followed b

    Jan 1, 2014

  • AUSIMM
    Chemical Treatment of Monazite Sand

    Alkaline leaching with sodium carbonate solution adjusted to pH 9·5 to 10·0 preferentially dissolves thorium from a mixture of rare earth and thorium hydroxides. Rare earth sodium carbonates

    Jan 1, 1963

  • DFI
    "Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."

    By Alexander J. Verstraeten

    Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de

    Jan 1, 1987

  • SME
    Weinbach Soft Ground Tunnel: Lessons Learned

    By Raymond W. Henn, Kent A. Pease, Glen J. Rorison

    The paper focuses on construction of a 2.55-km (8,365-ft) long, 2.4-m (8-ft)diameter storm drain tunnel in Evansville, Indiana. The tunnel was driven through saturated soft ground varying from clay to

    Jan 1, 2001

  • NIOSH
    IC 8849 Room And Pillar Retreat Mining - A Manual For The Coal Industry

    By Peter W. Kauffman

    This Bureau of Mines publication is designed primarily to provide mine engineers and production-level mine managers with the following: 1. Information to assist them in making the decision to retr

    Jan 1, 1981

  • AUSIMM
    McKee Memorial Address - Investment in Mining People

    Mr. Chairman, distinguished guests, ladies and gentlemen. Thank you for asking me to your conference, with its most fundamental and appropriate topic of 'Investment in Mining'. I must conf

    Jan 1, 1988

  • SAIMM
    Utilization of the Brazilian test for estimating the uniaxial compressive strength and shear strength parameters

    By F. Cihangir, A. Kesimal, K. Karaman, B. Ercikdi

    Uniaxial compressive strength (UCS) and shear strength parameters(cohesion and angle of internal friction, Cand F) of rocks are important parameters needed for various engineering projects such as tun

    Jan 1, 2015