Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Coal Rib Response during Bench Mining: A Case Study

    By Morgan M. Sears, Mark Van Dyke, Gamal Rashed, John Rusnak, Khaled Mohamed

    "In 2016, room-and-pillar mining provided nearly 40% of underground coal production in the United States. Over the past decade, rib falls have resulted in 12 fatalities, representing 28% of the ground

    Jan 1, 2017

  • SME-ICGCM
    Development of An Online User’s and Training Manual for LaModel

    By Keith A. Heasley, Christopher R. Newman

    "Originally developed in 1993, LaModel has aided mining engineers and researchers alike in improving the design and safety of underground single- and multiple-seam mining operations (Heasley, 1998). T

    Jan 1, 2015

  • SME-ICGCM
    Selection of Tunnel Support System by Using Multi Criteria Decision Making Tools

    By Kazem Orace, Navid Hosseini, Mehran Gholinejad

    "Selection of the optimum support system for underground openings such as tunnels is a complex process. In this paper a new approach, based on a combination of the Analytical Hierarchy Process (AHP) t

    Jan 1, 2010

  • SME-ICGCM
    The Influence of the Protection Pillar Width on the Stability of the Gateroad

    By Wojciech Masny, Andrzej Walentek

    "The most common extraction method in Polish coal mines utilize pillars between adjacent longwall panels. This is mainly due to the significant depth and difficulties in maintaining stability of the g

    Jan 1, 2010

  • SME-ICGCM
    Ground Pressure Control With Use Of Freezing Rocks On The Ore Deposits Of Yakutia

    By G. P. Neobutov

    The near surface inclined gold ore deposit is mined out at freezing temperature. The replacement of ore pillars by artificial freezing rocks during the rock pressures control in this conditions presen

    Jan 1, 1996

  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Pillars, Gob and Overburden Response

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The design of underground coal mines requires a clear understanding of the overburden response, the loading of pillars, the loading of the gob, the pillar failure process, and the ultimate load carri

    Jan 1, 2010

  • SME-ICGCM
    Significant Weighting Events on the Longwalls in the Phalen Colliery

    By Bob J. MacDonald

    The Cape Breton Development Corporation is a federally owned Crown corporation in Canada that operates two coal mines the Prince and Phalen Colliery in the Province of Nova Scotia. Retreat longwall mi

    Jan 1, 1997

  • SME-ICGCM
    A Comprehensive Analysis of Cable Bolt Anchorage Characteristics

    By Dakota D. Faulkner

    Cable bolts anchored with traditional two component polyester resin cartridges have successfully supported difficult roof conditions in underground mines. Resin cartridges provide a costeffective cabl

    Jan 1, 2013

  • SME-ICGCM
    Roadway Roof Support Design in Critical Areas at Anglo American Metallurgical Coal's Underground Operations

    By Ismet Canbulat

    "In order to ensure the stability of roadways, Anglo American Metallurgical Coal (AAMC) has developed a roof support design methodology that integrates analytical, numerical and empirical modelling. T

    Jan 1, 2010

  • SME-ICGCM
    Evaluation of Rock Excavation Technologies for Seismically Active Mines

    By S. Paul Singh

    "The long-term viability of seismically active and/or deep mining operations hinges upon the industry's ability to maintain profitability in a climate of increasingly difficult conditions, escalating

    Jan 1, 2010

  • SME-ICGCM
    Highwall Augering In Ultra-Thick Western Coal Reserves: Unique Geotechnical And Operational Challenges

    By Timothy Ross

    The Pittsburg & Midway Coal Mining Co.'s Kemmerer Mine is one of the deepest surface coal operations in the world, with the highwall extending to approximately 1,000 ft above the pit floor. To in

    Jan 1, 1999

  • SME-ICGCM
    Field Measurements of Chain Pillar Response to Longwall Abutment Loads

    By Christopher Mark

    Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess

    Jan 1, 1986

  • SME-ICGCM
    UK Experience and Numerical Modelling for Planning and Supporting Deep Longwall Over-Mining Operations

    By Bowler Jonathan, Lorraine Kent, Tereza Crisu, Stuart Walker, Nicholas Lightfoot

    "It has been the practice in Europe to extract the most economic seams first: taking the seams sequentially, top down, to avoid operating within the fractured strata formed by the subsidence trough ab

    Jan 1, 2016

  • SME-ICGCM
    CBM Extraction Engineering Challenges and the Technology of Mining the Upper Protective Seam in the Daxing Mine, China

    By Yuanping Cheng, Jingyu Jiang, Qiang Zhang

    "With the increase of mining depths, deep-seated coal seams face threats from high ground stresses, high gas pressures, high gas content, and low seam permeability, which significantly increase the li

    Jan 1, 2017

  • SME-ICGCM
    On Research Needs in Coal Mine Ground Control

    By Syd Peng

    "As the International Conference on Ground Control in Mining (ICGCM) enters its 35th year in 2015, it is time to look back and identify the areas that need to be emphasized and to look forward to see

    Jan 1, 2015

  • SME-ICGCM
    Study on Appropriate Support System and Control Criteria for Main Roadway under Weak Geological Conditions in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Akihiro Hamanaka, Pongpanya Phnthoudeth, Hideki Shimada, Jiro Oya

    "Indonesia is the second largest coal exporter to Japan, accounting for about 30 Mt annually. They produced over 400 Mt in 2015, over 99% of which is from open-cut mines. However, the conditions of su

    Jan 1, 2017

  • SME-ICGCM
    Quantification of Ventilation Enhancement Using the Eye Can Roof Support

    By Mark F. Sindelar, Yi Luo, Hua Jiang, Michael T. Shook

    "Convergence of roof and floor in underground mine openings is a common occurrence. This convergence not only adversely affects the ability of workers, equipment and supplies to travel through the min

    Jan 1, 2016

  • SME-ICGCM
    International Practice in High Performance Underground Thick Coal Seam Extraction and Related Ground Control Challenges

    By Bruce K. Hebblewhite

    This paper provides an overview of the international ?state of the art? with respect to underground coal mining methods used in seams of thickness greater than 4.5 m, through a review of a selection o

    Jan 1, 2013

  • SME-ICGCM
    SDPS For Windows: An Integrated Approach To Ground Deformation Prediction

    By David Newman

    The latest version of the Surface Deformation Prediction Software (SDPS) package is presented through its application to a number of case studies. The package now exploits all the benefits of the Micr

    Jan 1, 2001

  • SME-ICGCM
    Critical Appraisal Of Pillar Design As Required By Coal Mines Regulations Of India VIS-VIS Latest Rock Mechanics Formulae

    By S. K. Sharma

    The present study attempts to critically review the pillar-design as required by Coal Mines Regulations of India vis-a-vis latest rockmechanics formulae, Equivalent material modelling was the approach

    Jan 1, 1992