Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Analysis Of Entry Roof Failure And Falls At Springvale Colliery

    By Wm. Mark Hart

    High horizontal stresses and shear failure have been considered the major reasons that cause entry roof failure and falls for underground mining. Therefore, reorientation of the current mining systems

    Jan 1, 1996

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • SME-ICGCM
    Improved Intersection Design And Monitoring In The Sydney Coalfield

    By G. R. Corbett

    The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year

    Jan 1, 1995

  • SME-ICGCM
    A Retrospective on LaModel (Or Dr. Heasley?s Wild Ride)

    By Keith Heasley

    This paper is a retrospective on the development, application, and enhancement of the LaModel program from a personal perspective. The narrative starts with an explanation of the objectives behind the

    Jan 1, 2011

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    Effects of Specimen Age on the Uniaxial Compressive Strength and Moisture Content of Weak Coal Measure Rocks

    By Timothy Barton

    The uniaxial compressive strength (UCS) is the most fundamental measurement used in geotechnical rock characterization for mine design. While there are standardized procedures for how to conduct UCS

    Jan 1, 2008

  • SME-ICGCM
    Weightings And Water Inflows During Longwall Working

    By I. W. Farmer

    Weightings and water inflows into longwall workings often occur together, giving rise to discussions on their relative genesis. Case histories are introduced which indicate that most water inflows are

    Jan 1, 1996

  • SME-ICGCM
    Performance Evaluation Of A Cable Bolted Yield-Abutment Gate Road System At The Crandall Canyon No. 1 Mine, Genwal Resources, Inc., Huntington, Utah

    By J. R. Koehler

    Although two-entry yield pillar-based gate roads supported by wooden cribs have been commonly used throughout longwalling in the Wasatch PlateadRoan Cliffs coalfield of central Utah, a three-entry yie

    Jan 1, 1996

  • SME-ICGCM
    Analysis Of Multiple-Seam Interaction In A Bump-Prone Western Coal Mine Using MULSIM/PC

    By D. A. Donato

    It is often necessary for a mining company to extract coal from a seam underlying a previously mined coal seam. The impact of the overlying mine workings on the stress distribution within the underlyi

    Jan 1, 1996

  • SME-ICGCM
    Prevention Of Time-Dependent Subsidence By Elimination Of Ground Movement Over An Abandoned Mine

    By V. V. Nazimko

    Abandoned coal mines cause subsidence and structural damages. Shallow abandoned mines induce the most severe and harmful damages. In addition, they produce time-dependent subsidence which is difficult

    Jan 1, 1999

  • SME-ICGCM
    Pillar Design Considering the Plastic Behavior of the Coal Seam

    By Andre Zingano

    The variation in pillar behavior at underground coal mines working in the Bonito coal seam is observed in both research and mining company case studies. There is no consistency in pillar behavior, as

    Jan 1, 2012

  • SME-ICGCM
    Analysis of Coal Pillar Stability (ACPS): A New Generation of Pillar Design Software

    By Zach Agioutantis, Christopher Mark

    "Thirty years ago, the Analysis of Longwall Pillar Stability (ALPS) inaugurated a new era in coal pillar design. ALPS was the first empirical pillar design technique to consider the abutment loads tha

    Jan 1, 2018

  • SME-ICGCM
    Roof Stability Issues in Underground Limestone Mines in the United States (c7025d3b-53e9-40eb-abd5-d6a28b7f51f3)

    By Gabriel Esterhuizen

    The room-and-pillar mining method is used extensively in underground limestone mines in the Eastern and Midwestern U.S. The rock mass is typically a near-horizontal, bedded deposit at relatively shal

    Jan 1, 2007

  • SME-ICGCM
    Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)

    By Mike Amick

    As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti

    Jan 1, 2009

  • SME-ICGCM
    Computer Modeling Of Rock Mass Geomechanic State In Longwall Design

    By V. D. Jalevsky

    A new methodology of an experimental-analytical approach has been developed. It is used in building an information geomechanic monitoring system for the modeling of geomechanic processes during coal s

    Jan 1, 1996

  • SME-ICGCM
    Improvements in Coal-Waste Disposal Since Buffalo Creek

    By Kelvin K. Wu

    A coal waste disposal dam failed on Buffalo Creek near Saunders, West Virginia, on February 26, 1972. This accident resulted in the loss of 125 lives, left over 4000 people homeless, and resulted in m

    Jan 1, 2006

  • SME-ICGCM
    Seismic Events In German Hard Coal Mining (927aed19-540f-49d6-8a7e-8eb1cd5cfc71)

    By Axel Preusse

    Underground coal mining can cause seismic events. There is currently no way to predict such phenomena reliably, in particular stronger events. That is why, according to the current state of the art, e

    Jan 1, 2009

  • SME-ICGCM
    Improvements in Long Tendon Support with Pumpable Resin

    By Tom Meikle

    Long tendon support systems provide several challenges when used in-cycle as part of the secondary or primary support cycle. A two-component pumpable resin, Carbothix, has been in development for use

    Jan 1, 2012

  • SME-ICGCM
    Mine Stability Mapping

    By Collin L. Stewart

    The high cost and limited flexibility of modern longwall systems has resulted in the need for mine engineers and geologists to predict possible adverse mining areas ahead of mining and to then design

    Jan 1, 2006

  • SME-ICGCM
    Ground Control for Muliple Seam Mining in German Coal Mines

    By Holger Witthaus

    There is more than a century of experience in multiple seam mining in Germany. In several mines up to 20 seams had been excavated within the last decades. Due to the nature of the deposit and the hist

    Jan 1, 2007