Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Industrial Minerals Review – Zeolites: A Look at 2001 Activities

    By T. H. Eyde

    Worldwide production of natural zeolites during 2001 was estimated to be about 3.5 Mt (3.85million st). Construction and agriculture continued to be the major consumers. Estimated production in Nort

    Jan 1, 2002

  • SME
    Overview of Current Us Longwall Gateroad Support Practices

    By I. B. Tulu, M. M. Sears

    "In 2015, 40 longwall mines provided nearly 60% of the US coal production from underground mining methods. This represents a substantial, yet gradual increase from just under 50% over the last 5 years

    Jan 1, 2017

  • SME
    The role of pre-conditioning in mitigating seismic hazards – an innovative method for future caving operations.

    By James Lett

    The role of pre-conditioning in a caving operation has multiple benefits, ranging from assisting with improved caveability, normalising fragmentation and improving draw point hang-up frequency. At New

    Apr 26, 2022

  • SME
    Selective Flotation Of Automotive Shredder Residue Plastics

    By M. A. D. Azevedo, J. D. Miller, R. Kobler, E. Mutkowska

    Up to 3 million tons of automotive shredder residue (ASR) is generated annually in United States. Plastics are the most valuable component of the ASR material making up approximately 25% of the total

    Jan 1, 2001

  • SME
    Industrial Minerals 2004 - Sulfur

    By G. E. d’Aquin

    Sources of sulfur have varied based on technology and societal needs. It has been mined in its elemental form for centuries. Twentieth century technology brought thermal mining (Frasch, 1894) to the

    Jan 1, 2005

  • SME
    Talking Trash? – The RCRA Cleanup Reforms

    By M. N. Semenoff

    On July 8, 1999, EPA announced the RCRA Cleanup Reforms, a set of administrative reforms designed to achieve faster, more efficient cleanups. This paper will discuss the Reforms, the status of their

    Jan 1, 2001

  • SME
    The Technology of Automated Guidance for TBM’s and Road Headers

    By W. L. Hollinshead, Alwin Poltinger

    GENERAL Tunneling by hand digging is as old as the history of humans. Mechanized tunneling did not begin to replace manual methods until around the beginning of the 19th century(Brunel patent, 1818

    Jan 1, 1997

  • SME
    Recovery Of Oxidized Coal Fines In Tailing Inpoundments By Alkyolamide - Oil Flotation ? Introduction

    By Felicia F. Peng

    One of the serious environmental problems related with the extraction of coal for carbon and energy resources is that upon preparation of coal a large quantity of fine coal has been discarded and/or l

    Jan 1, 1982

  • SME
    Bacterial Pretreatment To Enhance Silver Recovery From Artvin-Kafkasör Ore By Cyanidation

    By Ü. Atalay, G. Alaeddinoglu, G. Özcengiz, G. Özbayoglu, Z. Özdemir

    In this study, bacterial pre-treatment was applied before cyanidation in order to enhance the solubilization of silver from Artvin-Kafkasör ore Direct cyanidation process was found inefficient to reco

    Jan 1, 2001

  • SME
    Mineralogical Characteristics And Applications Of Vermiculite From Seven Major Mines In China

    By P. Tong-jiang

    We studied mineralogical characteristics of the vermiculite samples from seven mines in China. We found three types of interstratified structures in the investigated samples: 1:1 regular interstratifi

    Feb 27, 2013

  • SME
    Preservation Of Mining Heritage In The Middle Sudetes 1. Introduction

    By A. Kosiór

    Many remnants of gold exploitation in the Middle Ages were found in the Lower Silesia region. The oldest evidence of such activity was found in the neighborhood of Zloty Stok and comes from the 7th ce

    Jan 1, 2006

  • SME
    Factors Affecting Solution Balance During In Situ Leaching Of An Unsaturated Copper Ore Body (6dec3392-5dc6-41ba-8b28-57254f57d550)

    By Perry M. Jones

    An important operational and environ-mental concern associated with in situ leaching activity is the balance between solution injection and recovery. Solution balance is an important indicator of the

    Jan 1, 1991

  • SME
    Pilot Scale Dewatering Studies Of Ultra Fine Clean Coal Slurries (a4d4eeba-bae6-4acc-9f95-4ae265f50a63)

    By B. K. Parekh

    Economical dewatering of ultra-fine (minus 74 m) clean coal slurry produced in column flotation to a 20 percent or lower moisture level will be an important step in successful implementation of the ad

    Jan 1, 1999

  • SME
    What Is The Value Of This Industrial Mineral Property?

    By S. M. Pickering, L. T. Gregg

    Appraisal of industrial minerals beneath privately owned land requires a different approach and mindset from valuation of base and precious metals or energy minerals, and from valuation of government-

    Jan 1, 2000

  • SME
    Underground Mining: A Challenge to Established Open-Pit Operations

    By Timothy D. Arnold

    Barrick Gold’s Bullfrog underground mine, near Beatty, NV, was established as an after-thought to the main open pit. As open pit ore dwindles, the underground mining became increasingly more importan

    Jan 1, 1996

  • SME
    Mini Symposium ? In Pit Crushing And Grinding I - Mobile In-Pit Crushing - Mobile In-Pit Crushing--Product Of Evolutionary Change

    By E. M. Frizzell

    Development of mobile crusher systems for surface mining, allowing extension of continuous conveyor haulage systems into the pit, is traced from its introduction to the present. Variations in configur

    Jan 1, 1983

  • SME
    A Review Of Rock Support And Falls In Us Coal Mine Intersections - Preprint 09-132

    The support of the roof in coal mines remains a critical safety issue with 3 fatalities from roof falls in 2007 and 430 injuries from roof falls in 2006. A snapshot survey by the authors of room desig

    Jan 1, 2009

  • SME
    Tonnage Factor – A Matter of Some Gravity

    By I. S. Parrish

    One of the most common errors uncovered while performing a reserve, or resource, audit is not in the geological modeling or grade problems due to poor sampling, prepartion or assaying. The error most

    Jan 1, 1993

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001

  • SME
    Industrial Minerals 2004 - Perlite

    By K. N. Santini, J. M. Barker

    The perlite industry in the United States continued to undergo rapid change and increased competition last year as it did in 2002. U.S. production in 2004 was 510 kt (562,000 st),an increase followin

    Jan 1, 2005