Mould Fluxes In Continuous Casting Of Steel - Characterization And Performance Tuning
By M. Görnerup, M. Hayashi, S. Seetharaman, C. -Å Däcker
The mould flux plays a crucial role in the continuous casting operation of steel due to its multi-functional assignment as lubricator and heat flux controller. In reality, the commercial fluxes can fa
Jan 1, 2004
-
Viscous behaviour of CaO-SiO2-A12O3-MgO-FeO slag
By S. H. Yi, J. R. Kim, Y. S. Lee
The viscosities of CaO-SiO2-Al2O3-MgO-FeO slags were measured under conditions ofCaO/SiO2=1.15–1.6, 10–13 percent Al2O3, 5–10 percent MgO and 5–20 percent FeO. Slag viscosity decreased with increasing
Jan 1, 2004
-
Design Rules For Avoiding Draw Horizon Damage In Deep Level Block Caves
Deep level block caving as a mining method is becoming more popular due to the fact that it is the lowest cost per ton underground extraction system. However, many block caves do not achieve their ful
Jan 1, 1999
-
Process Mechanisms In Ilmenite Smelting
By J. H. Zietsman
It has previously been observed that industrial high-titania slags display a compositional invariance, remaining close to stoichio-metric M3O5. The present study focuses on this invariance and the phe
Jan 1, 2004
-
Interpretation and modelling of a hydromechanical in situexperiment within a fractured calcareous rock mass
By Y. Guglielmi, V. Merrien-Soukatchoff, I. Kadiri
ABSTRACT: Hydraulic experiments have been conducted since 1997 within a small fractured calcareous rock mass in southeastern France, at a site called Coaraze. On this reduced-scale site closing a floo
Jan 1, 2003
-
A Real Options Application To Manage Risk Related To Intrinsic Variables Of A Mine Plan: A Case Study On Chuquicamata Underground Mine Project
By J. Botin
Traditional risk quantification methods provide little information on the sources of risk, and tend to produce static over-conservative evaluations, which do not account for changes in the performance
Jul 1, 2013
-
Evaluation of a Versatic 10 Acid/Nicksyn? Synergistic System for the Recovery of Nickel and Cobalt From a Typical Lateritic Leach Liquor
By A. C. du Preez
Mintek has been involved in extensive test work since the early 1990s on the recovery of nickel and cobalt from leach liquors saturated in calcium, using synergistic solvent extraction systems. During
Jan 1, 2014
-
The Application Of Numerical Modelling To The Design Of Electric Furnaces
By T. Plikas, L. H. Gunnewiek, L. Oshinowo
Electric furnace smelting is one of the principal unit operations for ferroalloy production, and increased process intensity, improved availability, minimal maintenance and a lon
Jan 1, 2004
-
Measurement Systems For Gravity Circuit Performance: A New Approach.
By R L. Langak, R A. Heins
The use of differences in specific gravity between minerals to separate them has long been utilized in the extractive industries. The environmental and cost benefits of the commercialized forms of the
Jan 1, 2006
-
Engineering application of thrust block analysis in slope stability problems in open pit mines - Synopsis
By K. N. Karparov
The classical limit equilibrium methods are suspected to be ineffective in predicting the potential for highwall failure in many instances in coal mines around the world. Slope engineers have for many
Jan 1, 2009
-
The Evolution Of Strategic Long-Term Planning At Anglo Platinum
By D. C. Andersen, G. L. Smith, J. Pearson-Taylor
Following a restructuring of Anglo Platinum Limited in 2004 the strategic long-term planning function has been centralized. This paper describes the revised strategic long-term planning process coveri
Jan 1, 2006
-
Process design of the Phola coal preparation plant - Synopsis
By G. M. Cresswell
The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing
Jan 1, 2010
-
Optimization of mill performance by using online ball and pulp measurements - Synopsis
By B. Clermont
Ball mills are usually the largest consumers of energy within a mineral concentrator. Comminution is responsible for 50% of the total mineral processing cost. In today?s global markets, expanding min
Jan 1, 2010
-
Wear Analysis of Tap-Holes at Two Ferrochromium Production Furnaces
By J. D. Steenkamp
"In July of 2016 and June 2017, major tap-hole repairs were carried out during the annual shutdown of two 63 MVA submerged arc furnaces producing ferrochromium in South Africa. The hot excavations of
Jun 1, 2019
-
Optimizing Value on a Copper Mine by Adopting a Geometallurgical Solution
By A. S. Macfarlane
This paper describes how knowledge of the orebody morphology and ore morphology can be used to optimize the planning, mining, and metallurgical output from an open pit copper mining operation, such as
Jan 1, 2014
-
Focal Depths of South African Earthquakes and Mine Events
By M. B. C. Brandt
Focal depths of 15 tectonic earthquakes and 9 mine-related events were determined for South Africa using data recorded by the South African National Seismograph Network. These earthquakes and events w
Jan 1, 2014
-
Wet Shotcrete Trial
By A. D. Storrie
An underground wet shotcrete trial was completed last year to determine the effectiveness of wet shotcrete as an alternative support mechanism to dry shotcrete in the kimberlite environment. The wet s
Jan 1, 2001
-
Critical investigation into the problems surrounding pillar holing operations
By L. Mpolokeng, J. P. Labuschagne, H. Yilmaz
"An investigation into pillar cutting was carried out at a platinum mine on the western limb of the Bushveld Complex. The focus was on crush pillar design and implementation in order to ultimately imp
Jan 1, 2015
-
Establishing A New Metric For Mineral Resource Management
By A. S. Macfarlane
Mineral resource management (MRM) practice has developed in South Africa over the course of the last ten years, with the purpose of integrating previously isolated technical functions into a value cha
Jan 1, 2006
-
Solutions to common design and operating problems in spiral circuits
By R. Abela
In over ninety per cent of mineral sand plants, the most commonly used equipment is the spiral concentrator. The tonnage treated over typical spiral plants can range from as low as 200 ton per hour up
Jan 1, 2003