Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    The evaluation of five flowsheets for the recovery of uranium from Witwatersrand leach pulps

    By D. W. Boydell, E. B. Viljoen

    A flowsheet incorporating rotary-drum filtration for the solid-liquid separation step, followed by solvent extraction for uranium purification, is used as a standard against which four flowsheets are

    Jan 1, 1978

  • SAIMM
    Studies Of The Dynamic Characteristics Of Plant Circuits For The Development Of Control Strategies

    By R. M. G. Machunter

    The dynamic behaviour of plant circuits and the available instrumentation determine the control strategies that are appropriate for the duty of the mineral separation plant. Although steady state mode

    Jan 1, 2007

  • SAIMM
    Fundamental Studies of the Flotation Process: The Work of the National Institute for Metallurgy

    By V. M. Lovell, N. P. Finkelstein

    The concepts involved in flotation research are discussed and aims are presented. Three different methods of investigation can be used, all of which are applied at the National Institute for Metallurg

  • SAIMM
    Wet Heavy Mineral Pilot Plant Design, Assembly, Commissioning And Operation For A Remote Location

    By P. A. P. Fouché

    Processing confidence for a bankable feasibility study on a green field heavy mineral deposit is inmost cases achieved only through bulk sample processing. Bulk sample is classified as a large enough

    Jan 1, 2007

  • SAIMM
    A borehole-dislocation sensor for the continuous monitoring of fracture displacement in deep mines

    By P. J. How, T. O. Hagan, M. F. Handley

    Inelastic deformation of highly stressed rock in deep mines needs to be quantified in both time and space. Since most deformation occurs by shear, continuous monitoring of discontinuities in the rock

    Jan 1, 1988

  • SAIMM
    Comparative study on the stability analysis methods for underground pumped powerhouse caverns in Korea

    By H. -U. Lim, C. -H. Kim

    The sixth underground pumped powerhouse cavern is under construction now in Korea. For the stability analysis of the five underground powerhouses, finite element method was used. For this analysis, in

    Jan 1, 2003

  • SAIMM
    The modelling and simulation of processes for the absorption of gold by activated charcoal

    By D. F. Williams

    The modelling, simulation, and design of processes for the recovery of gold from solution by absorption on carbon require the combination of a suitable rate expression with a description of the flow c

    Jan 1, 1985

  • SAIMM
    Green Pages - Book Review: Green Markets For Minerals * Proceedings Of The IM Open Forum

    The rising tide of environmentalism has adversely affected many mineral producers, but it has also provided them with a number of opportunities for mineral applications. These markets are as diverse a

    Jan 1, 1995

  • SAIMM
    Modelling financial risk in open pit mine projects: implications for strategic decision-making - Synopsis

    By S. A. Abdel Sabour

    Strategic decisions in the mining industry are made under multiple technical and market uncertainties. Therefore, to reach the best possible decision, based on information available, it is necessary t

    Jan 1, 2009

  • SAIMM
    A three-dimensional tessellation boundary element method for simulation of fracture zone around openings

    By K. -J. Shou

    A special three-dimensional boundary element method has been developed for the simulation of the development of fracture zone in rock mass. This approach comprises a boundary element method and a thre

    Jan 1, 2003

  • SAIMM
    Slag-metal equilibrium in the production of Iow-carbon ferromanganese

    By N. A. Barcza

    An investigation was conducted into the reactions between the slag system MnO-CaO-MgO-SiO2(AI2O3) and the alloy system Mn-Fe-Si-(C). Synthetic slags representative of plant melts and a plant alloy wer

    Jan 1, 1979

  • SAIMM
    Development of a viable process for the recovery of zinc from oxide ores - Synopsis

    By J. R. de Wet

    The Skorpion Zinc Project demonstrated the viability of the production of zinc from non-sulphide (commonly called ?zinc-oxide?) ores, using the leach/solvent extraction/electrowinning process route. T

    Jan 1, 2008

  • SAIMM
    Discussion - Review Of Evaluation Models For The Representative Sampling Of Ore - Lotter, N. O.

    Contribution by W. Assibey-Bonsu I congratulate Mr N.O. Lotter on his paper. There are two main aspects of the paper on which I would like to comment. One aspect is his review of P. Gy's sam

    Jan 1, 1996

  • SAIMM
    Surface and underground drilling techniques used in exploration drilling

    By B. A. Dukas

    The diamond-drilling machine has for many years been the most important exploration tool In the search for and subsequent evaluation of Witwatersrand-type ore deposits. With a view to increasing the r

    Jan 1, 1983

  • SAIMM
    Green Topics - The Green Face Of Mining

    With a number of new mines at the feasibility stage and beyond and with several pellet capacity expansions well underway to reduce sintering activity, Alex Broad looks at the impact of worldwide envir

    Jan 1, 1996

  • SAIMM
    Mining practice in the Kimberley Division of De Beers Consolidated Mines Limited

    By M. T. G. Davis, J. V. Cleasby, H. J. Wright

    Mining practice in the Kimberley Division of De Beers Consolidated Mines Limited by J. V. CLEASBY. B.Sc.. A.R.S.M. (Fellow). H. J. WRIGHT. B.Se.. M.Sc.. (Fellow). And M. T. G. DAVIES. B.Sc. (Visitor)

    Jan 12, 1975

  • SAIMM
    A note on predicting the performance of large flotation machines

    By B. K. Loveday

    The use of large flotation machines is well established, resulting in substantial savings in both capital and operating costs. Therefore, when a new plant is designed, laboratory and pilot-plant tests

    Jan 1, 1983

  • SAIMM
    Control of air pollution at Rand Carbide Limited, Witbank

    By J. Meintjes

    The measures taken by Rand Carbide Limited from the 1950s to 1976 to control dust emission from the electric furnaces at its Witbank factory are described. A new design of furnace for calcium carbide

    Jan 1, 1978

  • SAIMM
    Surface effects of total coal-seam extraction by underground mining methods

    By E. H. R. Schümann, H. Wagner

    SYNOPSIS The paper gives a detailed overview of the history of subsidence engineering on South African collieries. Surface displacements resulting from total-seam extraction are discussed, and the im

    Jan 1, 1991

  • SAIMM
    Evaluation Of Processing Options For The Treatment Of Zinc Sulphide Concentrates At Skorpion Zinc - Synopsis

    By H. F. Fuls

    Skorpion Zinc, an integrated zinc mine and refinery located in the south of Namibia, has a production capacity of 150 000 t/a of special high grade (SHG) zinc. The Skorpion zinc oxide resource will be

    Jan 1, 2013