Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Stability Problems And Rock Support At The Tellnes Open Pit Mine, Norway

    By Bjørn Nilsen, Brian J. Ballou

    The Tellnes open pit mine in Southwestern Norway has been operating since 1960. The maximum height of pit walls is currently about 150 meters with the current mine plan extending this distance to 400

    Jan 1, 2006

  • SAIMM
    Treatment Of Cr(VI)-Containing Wastes In The South African Ferrochrome Industry?A Review Of Currently Applied Methods ? Synopsis (933090fa-3304-4e89-881a-931c00a156b6)

    By J. P. Beukes

    South Africa holds approximately three-quarters of the world?s viable chromite ore resources and dominates the global production of ferrochrome. Albeit completely unintended, small amounts of Cr(VI) a

    Jan 1, 2012

  • SAIMM
    Liner Optimisation To Improve Availability Of The Ridgeway SAG Mill (ce87862d-0ddc-4fb1-a4ed-b071f2daa7ac)

    Mill relining is a major contributor to overall plant downtime. Reducing the number of mill liner pieces removed from and replaced in the mill has a direct impact on the overall reline time and in tur

    Jan 1, 2007

  • SAIMM
    Skorpion Zinc: optimization and innovation - Synopsis

    The Skorpion process comprises three processing steps-atmospheric leaching in sulfuric acid, zinc solvent extraction and electrowinning to produce special high grade zinc. The major mode of impurity t

    Jan 1, 2007

  • SAIMM
    Contribution to the above paper (2033aae2-51fc-4fa5-a23c-ffef8ff636dc)

    By R. T. Muller

    Contribution to the above paper by R. T. Muller (Visitor) Demands are being made and pressure is being brought to bear on employers in South Africa to narrow or eliminate the wage gap between their Wh

    Jan 7, 1974

  • SAIMM
    The Development and Application of a Computer System to Aid in the Planning of Production in Mines

    By F. H. Deist, H. D. Small, J. D. Austin, L. F. Duvel

    The development and application of a Computer System to aid in the planning of production in mines By F. H. Deist, L. F. Duvel, J. D. Austin, H. D. Small A computer system to aid in the planning of pr

  • SAIMM
    Coal Mine Ventilation Systems in the United States of America

    By R. V. Ramani, R. Stefanko

    "The favorable mining conditions in the United States of America that resulted in the development of the highly productive room and pillar systems are largely disappearing. Increasing mechanization, p

    Jan 1, 2014

  • SAIMM
    Fully dynamic stability analysis of jointed rock slopes

    By Y. H. Hatzor

    ABSTRACT: A fully dynamic, two dimensional, stability analysis of a highly discontinuous rock slope is demonstrated in this paper. The studied rock slope is the upper terrace of King Herod’s Palace in

    Jan 1, 2003

  • SAIMM
    Operations Planning and Control

    "Chairman: Dr N. G. W. Cook Rapporteur: Mr M. P. RobertsPapers:Planning open pit mining operations using simulation by A. Bauer and P. N. Calder Simulation for control of underground liquid flow by G.

    Jan 1, 2014

  • SAIMM
    Evaluation of dynamic grouting effect for Low-permeable rock

    By S. Wakita, K. Aoki, Y. Mito, K. Date

    It is of great importance to prevent a leakage of hazardous substances from underground storage plants, because this certainly leads to a fatal disaster for human societies. Therefore, effective grout

    Jan 1, 2003

  • SAIMM
    Comparison of continuous and discontinuous modelling for computational rock mechanics

    By T. Scheldt, M. Lu, A. Myrvang

    Abstract: In this paper both continuous and discontinuous modelling are utilised in order to analyze the stability of the Gjøvik Olympic Mountain Hall. The large span cavern (62 m) was built for the 1

    Jan 1, 2003

  • SAIMM
    Evaluation of the sampling strategy for a copper ore

    By P. Gonzalez

    Minera La Parreña, S.A. de C.V., Milpillas operation is an underground mine designed to process 8 352 tons of ore per day for the recovery of copper through crushing, heap leaching, solvent extraction

    Jan 1, 2009

  • SAIMM
    Alternative Models for the Calculation of CAPEX and OPEX for a Hydrometallurgical Plant

    By Jürgen Antrekowitsch, Harald Osthof, Stefan Steinlechner

    "In the case of feasibility assessments or feasibility studies, an important point of discussion is often how to calculate the capital (CAPEX) and operating expenditure (OPEX) of a plant. Generally, t

    Jan 1, 2015

  • SAIMM
    Sampling, sample preparation and analytical practices for power station-type coals

    By V. Moodley

    Strict implementation of International Standards for representative sampling of coal is difficult for routine monitoring, due to time, technical, and economic constraints. A large percentage of the to

    Jan 1, 2009

  • SAIMM
    SEREF: An Interactive Seismic Refraction Data Interpretation Program for the IBM PC

    By G. R. J. Cooper

    In recent years attempts have been made to develop software packages for shallow seismic refraction data analysis. In most cases, mainframe computers were used which were generally non-interactive, di

    Jan 1, 1987

  • SAIMM
    Notices (90b71352-df30-4f59-86e5-04c7b26ff260)

    ERRATA-AUTHOR'S REPLY IN SEPTEMBER, 1970, JOURNAL: PAGE 52 I. Left half of the page, 4th paragraph, fifth line from the bottom: for 22 / 5 1/2 %, read 22 / 5 1/2 %. 2. Right half of the page

  • SAIMM
    Hydraulic Fracturing Technology For Improving Permeability In Gas-Bearing Coal Seams In Underground Coal Mines ? Synopsis

    By B. X. Huang

    Hydraulic fracturing technology is presented as a solution to improve permeability and thus solve the extraction problem of coal seam gas in low-permeability gas-bearing coal seams. Given an existing

    Jan 1, 2012

  • SAIMM
    Equipment alternatives for stoping in gold mines

    By D. G. Wymer, A. G. du Plessis, N. C. Joughin

    The use of a dense hangingwal-support configuration extending right up to the face would enable greater levels of safety and productivity to be achieved in stopes, and becomes a practical proposition

    Jan 1, 1989

  • SAIMM
    Valuation Of A Mineral Resource That Has A Compound Metal Content Distribution: An Example Based On The Merensky Reef At Wesizwe Platinum Limited?s Pilanesberg Project

    By D. R. Young

    Drilling exploration over the Wesizwe Platinum Limited?s Pilanesberg Project has identified the Merensky Reef at depths varying from 594 m to 1 552 m depth. Merensky Reef thickness varies from 0.05 m

    Jan 1, 2006

  • SAIMM
    A comparison between the duplicate series method and the heterogeneity test as methods for calculating Gy?s sampling constants, K and alpha

    The compilation of the sampling nomogram is an essential tool in the optimization of a sampling protocol and allows the operator to track the change in relative variance of the sampling error (the Fun

    Jan 1, 2009