Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    A Study of the Use Signature Holes for Smaller & Faster Moving Construction Blasting Operations

    By Dale Bartholomae, David Harrison, Edward J. Walter

    Methods that involve the use of signature blast holes in order to identify the particular frequency characteristics of a geographical area are widely available. Information acquired can be used to det

    Jan 1, 2005

  • ISEE
    Effects of Aggregate Production Blasting on an Adjacent 42” (1.067m) Pipeline

    By John Babcock, Bryan C. Smith

    In a partnership between Luck Stone Corporation and Loudoun Water, a 42” (1.067m) steel pipeline was constructed along the perimeter of an extensive permitted reserve of diabase rock Luck Stone was ab

    Jan 1, 2019

  • ISEE
    Reliability of Timing Sequence Network for Multiple Blast Holes

    By Lifeng Li, Jhon Silva-Castro

    In a previous work, the authors analyzed the overlapping probability of two adjacent charges in a single hole for pyrotechnic and electronic detonators. This document extends such work to a complete m

    Jan 1, 2016

  • ISEE
    Environmental Hazards & Other Difficulties Associated, with Blasting Operations in India and Their Remedies

    In all the industries that require blasting operations using explosives, there exists numerous unwanted side effects of the blast which may pose as environmental hazards. These hazards face prominence

    Jan 1, 1995

  • ISEE
    Quake, Quarry, or Quack

    By Dominic Orf, Gregory Poole

    On December 12, 2018 at 4:14 AM EST, an earthquake registering a 4.4 magnitude on the Richter Scale occurred in central Tennessee. According to a survey posted on the USGS website, this earthquake was

  • ISEE
    Using Internet Resources to Improve Claim Reports

    By Gregory Poole

    With access to the World Wide Web, many resources are readily available for improving claim reports. With a little time spent on line, a more thorough report can be created. Claimants will accept the

    Jan 1, 2006

  • ISEE
    Computer Modelling of Cast Blasting

    By G K. Jorkenson

    Blast designs to cast a percentage of overlying waste rock off coal seams differ greatly from conventional blast designs for surface coal mines. Today, blasting engineers can benefit from computer si

    Jan 1, 1989

  • ISEE
    Journal: Near Field Vibration Monitoring for Rock Mass Damage Control Tala Hydroelectric Project, Bhutan India

    By H. Venkatesh, Balachander R.

    This article discusses the method that was adopted for controlling damage to rock mass while excavating an underground powerhouse cavern at Tala Hydroelectric Project. It discusses in detail the near

    Jan 1, 2006

  • ISEE
    Evolution of Single Shot Drawbell Blasting at New Afton Mine

    By Mike Lovitt

    New Gold Inc. had commissioned Orica to assist with the design of the drawbell blasting at New Afton Underground copper/gold block cave at Kamloops, British Columbia, Canada. Orica have had much succe

    Jan 1, 2013

  • ISEE
    Use of High Density Ammonium Nitrate in Blasting

    By Lex L. Udy

    Properties of an explosive which itiuence its performance on rock breakage are analyzed in relation to the rock: hardness and a discussion on the interaction of an explosive with the rock during the b

    Jan 1, 1995

  • ISEE
    Understanding Ground Vibrations and the Effects of Delay Intervals on Amplitude and Frequency

    By Randall M. Wheeler

    The measurement and analysis of blast-induced ground vibrations are more complex than ever before. This is primarily due to the advancements made in microchip technology, mass storage utilities and th

    Jan 1, 1992

  • ISEE
    Explosives Control Legislation in the New Congress

    By Reynold N. Hoover

    The bombing of the Murrah Federal Building in Oklahoma City, Oklahoma, on April 19, 1995, has once again renewed public debate surrounding the availability and use of explosives in the United States.

    Jan 1, 1996

  • ISEE
    Surface Instabilities from Buried Explosions

    By Daniel P. Lathrop, Leslie C. Taylor, William L. Fourney

    Except when the target is on the surface, e.g. a tank track, the most important loading mechanism from a buried charge on a target above it is the impact of soil propelled at the target by the expandi

    Jan 1, 2009

  • ISEE
    Alternative Velocity Loading Techniques and Detonations in a Production Environment

    A simple and cost effective technique to increase fragmentation and burden velocities without making major modification to the overall blast design is with ALTERNATE VELOCITY LOADING OR BOOSTERING OF

    Jan 1, 1989

  • ISEE
    Influence of Distance in the Effective Use of Electronic Detonators to Control Blast Induced Ground Vibrations

    By W. J. Birch, R. Farnfield

    The use of electronic detonators to control blast vibrations has been previously established by many authors. This is performed by determining the optimum delay period between the blast holes for a pa

    Jan 1, 2009

  • ISEE
    Pre-Splitting With The New AIRDEK Technique

    By David G. Borg, John Bussey

    The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application

    Jan 1, 1988

  • ISEE
    Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.

    By Grigor Mishev, Georgi Petrov, Benjamin Cebrian

    Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra

    Jan 1, 2016

  • ISEE
    Crystal Falls Dam Demolition and Protection Techniques Using an Air Curtain

    By Alex Chapman, Cam Thomas, Bryan Karney

    "During the early summer of 1989, Ontario Hydro removed a concrete portion of the North Channel Dam at Crystal Falls Generating Station by blasting and excavating in marine conditions. Because of the

    Jan 1, 1992

  • ISEE
    Borehole Geophone Method for Estimating Tunnel Blast Vibration Propagation

    By Kyle Ott, Bernard Daly, Syed Haq, Douglas Anderson, Parsons Brinckerhoff

    Drill and blast was determined to be the most cost-effective means of excavating the Raw Water Tunnel (RWT) for the Croton Water Treatment Plant in the Bronx, New York City. One of the major issues co

    Jan 1, 2012

  • ISEE
    A Numerical Study of Bench Blast Row Delay Timing and Its Influence on Percent-Cast

    By Dale S. Preece

    The computer program. DMC Qistinct Motion &de), which w&s developed for simulating the rock motion associated with blasting, has been used to study the intluence of row delay timing On rock mOtiOn. Th

    Jan 1, 1994