Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Minimising Coal Damage and Loss Due to Cast Blasting

    By Tapan Goswami

    This paper discusses the importance of coal mapping, the rock properties of the roof and floor interface of the coal seam, and the significance of loading and initiating designs in minimising coal dam

    Feb 1, 2020

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • ISEE
    Using An Anfo/coal Blended Blasting Mixture For Commercial Blasting Applications

    By Dennis Wilzbacher, John Wiegand

    In an effort to reduce the cost of bulk explosives, Vigo Coal Company found that the addition of coal mined at their Friendsville Mine, not only reduced explosive costs, but also appeared to actually

    Jan 1, 2007

  • ISEE
    Perimeter Control Utilising Electronic Detonators

    By John Wall

    The use of electronic detonators in civil tunnelling applications, to reduce vibration is small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen

    Jan 1, 2012

  • ISEE
    Blasting Near a Crusher

    By Scott G. Giltner, Alex Schwenk

    Blasting within 250 ft of a crusher was successfully executed through the application of electronic detonators, 3-D imagery, signature hole analysis, custom loading of blast holes. The blast was well

    Feb 1, 2020

  • ISEE
    Electronic Accuracy Achieved with Non-Electric Initiation (7a8110cb-addf-409b-b1cc-4a8ccdd15ad7)

    By Sandy Tavelli, Thomas L. Barkley

    This discussion will present a case study in developing solutions to a metropolitan quarry’s public relations, legal, environmental, and productivity problems. It details an extensive and detailed pro

    Jan 1, 2004

  • ISEE
    Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions

    By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill

    This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an

    Jan 1, 2017

  • ISEE
    Deep Water Blasting on the River Nile in Southern Egypt

    By Rob Grant, Manuel Lopez Cano, Mike Briggs, Ken Fletcher

    The scorched desert sands and life giving waters of the River Nile in Egypt have been the back drop to awe inspiring engineering feats for over 4,700 years. The latest engineering marvel to grace the

    Jan 1, 2004

  • ISEE
    Pneumatic Stemming of Horizontal Holes with Particulate Material

    By Clay McNail, Paul N. Worsey, John Schillie

    "This paper is the result of undergraduate student research over the period of 2 semesters at UMR, which was focussed on developing a practical way to pneumatically stem horizontal boreholes, mostcomm

    Jan 1, 1999

  • ISEE
    Fewer Surprises When You Measure the Sizes

    By Tom C. Palangio

    Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co

    Jan 1, 2016

  • ISEE
    Blasting Next to an Unsupported Road using Electronic Detonators

    By Tony Rorke, Sydney Thabethe

    A large overburden blast was carried out at Douglas Colliery, Middelburg Mine Services, close to a national road in South Africa. The road is a busy route between Witbank and Bethal and damage to the

    Jan 1, 2004

  • ISEE
    Blasting Works Quality Management in Accordance with Environmental Conditions

    By Rolf R. Schillinger

    It is established to an increased extent that the basic questions about raw material extractions deal with water, dust, noise and vibrations. If it has not been definitely proven that these points won

    Jan 1, 2002

  • ISEE
    Drilling and Blasting Optimization

    By Jorge Flores, Benjamin Cebrian

    Blast Optimization at a high altitude mine operation involves not only the selection of the right drilling designs and explosives but also the circumstances of operators working at low oxygen levels a

    Jan 1, 2015

  • ISEE
    Application of the NIOSH-Modified Holmberg-Persson Approach to Perimeter Blast Design

    By Chick Kerkering, Stephen Iverson

    Perimeter control blasting is common in civil construction projects but not as common in mining. A poorly designed and executed underground mine development blast design can result in unwanted wall ro

    Jan 1, 2008

  • ISEE
    Journal: Summary of Amendments of ADR concerning the Transport of Explosive Materials in the EU

    By Rolf Schillinger

    Transport of Small Quantities of Explosives Material on Public Roads The transport of dangerous goods on public roads is extensively regulated by EU and national law. The transport of explosive materi

    Jan 1, 2010

  • ISEE
    Demolition of Churchill House in Belfast, Ireland

    By Dick Green

    During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of

    Jan 1, 2006

  • ISEE
    Impact of Open-pit Blasting on the Stability of Adjoining Multiseam Workings of Underground Coal Mine

    By Ajoy Singh

    A study was conducted to investigate the damage potential to underground multi-seam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal ex

    Jan 1, 2012

  • ISEE
    Using Machine Learning and Novel Algorithms to Predict Muckpile Shape and Throw to Engineer a Perfect Blast

    By Ravi Sahu, Brad Gyngell, Oktai Radzhabov

    Design machine learning approach to simulate the process of muckpile throw distribution before blasting.

    Feb 1, 2020

  • ISEE
    Rock Slope Remediation on the Pennsylvania Turnpike

    By Ron Woolf, Corry Goumans

    With increasing traffic volumes experienced thro u g hout North America, a common goal for Highway officials is to keep traffic flowing as much as possible and to keep disruptions to the flow to a min

    Jan 1, 2003

  • ISEE
    Comparison of International Vibration Standards for Quarry Blasting Close-in to a Residential Structure

    By Johan Gjødvad, Catherine Aimone-Martin, Charles Dowding, Mathias Jern

    A residential structure adjacent to a quarry in Ohio was instrumented to record structure motions, resulting wall strains and existing crack displacements in response to close-in blasting within 82 m

    Jan 21, 2025