Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin
An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting
Feb 6, 2023
-
The Explosives Industry and Governmental NexusBy Rhys Baker, Tim O’Brien, Joshua M. Hoffman
This paper discusses this division of power as it relates to the explosives industry. Each branch is responsive to the public and the processes through which each promulgates regulation and legislatio
Feb 1, 2020
-
The Electronic Option, Future Aspects in BlastingBy Winfried Rosenstock, Carlos Orlandi
Along the Pacific West coast of Latin America there are several large operations of metal mining activities. To mention only a few: Chuquicamata in Northern Chile moving daily approximately one millio
Jan 1, 2000
-
Journal: Vibration Control Through Better PredictionsBy Keith Best
It has been said that when a person does something right no one remembers but when they do something wrong no one forgets. This statement, when applied to the explosives industry, has never been truer
Jan 1, 2008
-
EUExcert a European Initiative for Improved Explosive CompetenceBy Roberto Folchi, Hans Wallin, Mara Battocchio
An understanding of explosives science and technology, and the competence to harness it is central to maintaining Explosives capability, national security, and in sustaining a competitive industry. A
Jan 1, 2013
-
Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TNBy William Gates, Gabe McClain, Thomas Pallua, Joe Schrank
The Tennessee Capitol Corridor connects the Cordell Hull Building (CHB) to the State Capitol, which isa 232-foot-by-124-foot (71 x 38 m) structure in Nashville that includes porticoes built from local
-
Design Software for Electronic DetonatorsBy Kia Riihioja, Mike Higgins
A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh
Jan 1, 2004
-
Controlled Hard Rock Trench Blasting Close to a Buried Gas Pipeline under PressureBy M. Ganster
Austria’s biggest supplier of oil and gas, transports gas through the West Austria Gasline for domestic consumption. In addition, the OMV also works as gas carrier and ensures the transit into neighbo
Jan 1, 2010
-
Application of GEM (Geologic Element Motion) to Heave Modeling of Cast Blasting, Mineral and Iron Ore BlastingBy Stewart A. Silling, D. Lynn Gordon, C. Mick Lownds, Dale S. Preece, Ali Bhuiyan, Patrick R. Bowden
Blast heave modeling and prediction utilizing the new discrete element model, GEM, that treats rock as elements with alternating arcs and line. Explosive loading of GEM elements is accomplished by uti
Feb 1, 2020
-
Fines Reduction and Its Impact on the Economics of Aggregate OperationsBy J. Eloranta
"Previous work indicated that the annual per-capita consumption of raw aggregate material averages about 10 tons; half of which is produced by blasting. Given a population of approximately 320 million
Jan 1, 2017
-
O'Shaughnessy Dam Hydroelectric ProjectBy Alan Hooper, James E. Mischler
Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27
Jan 1, 1986
-
EU Type Certification of Non-Standard Electronic Initiations Systems used in Blasting at Mines and QuarriesBy Matthew Clay, Colin Chambers, Susan Hookham
Opencast (quarries) and underground mines around the world use blasting methods to mine valuable ore. Traditional blasting systems use technologies such as electric delay detonator systems (developed
Jan 1, 2017
-
"Fast Rock Segmentation Using Artificial Intelligence to Approach Human-LevelAccuracy"By Ian Bell, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Mahdi Ramezani
"Image-based rock fragmentation sensing in mining and quarry applications includes an important rock boundary delineation step, which is commonly referred to as rock segmentation. This paper presents
Jan 1, 2017
-
Fueling Station and Tank Farm Expansion on Taboguilla IslandBy Abraham Lindo
Taboguilla is a small island located 10 miles outside the Panama Canal Pacific Entrance. In 2002 a fuel distribution facility was installed in order to supply fuel to vessels passing thru the canal. T
Jan 1, 2011
-
Application of Rudimentary Signature Hole AnalysisBy Michael Laing
Blasting regulation and restrictions are tougher today than ever before. When blasting in population centers, strict limitations are often placed on the environmental effects caused by blasting, more
Jan 1, 2017
-
Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TNBy Gabe McClain, Thomas Pallua, Joe Schrank, William C. Gates
Because of restrictions on blasting in urban areas and, more importantly, the proximity of this construction to national historic landmarks, blasting operations were extensively monitored to measure a
Feb 1, 2020
-
Vibration Data Analysis to Optimize the Blast Design and Improve Shovel ProductivityBy Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira
The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a
-
Journal: 16th Annual Photo and Art Contest / Best of Show Power Line Pass Kemano, British Columbia, CanadaBy Corry Goumans
Description of Project: Drilling, Blasting and Installation of Catenary Cables. Project Owner: Rio Tinto Alcan
Jan 1, 2010
-
Inco Limited Upper Blind Slot Raise 8M (25') to 12M (40') Longhole Carbide Drilling (L.C.D.) MethodBy Steven Richardson, E A. Cameron, Reza "Ray" Jambakhsh
This paper outlines the design and implementation of a method to use Long hole Carbide drilling to blast an "Upper Blind Slot Raise" in the range of 12m (40 ft).
Jan 1, 1992
-
Impact of Blasting Sequence on Dilution and Benefit Through Ore Displacement Control Using Three-Dimensional ModelingBy Paulo C. Fernández A, Sergio Matamala V, Claudio C. Gajardo, Christian A. Rees P
In fragmentation processes in open-pit mining, it has been observed that there are many opportunities for improvement if greater control of ore displacement in blasting is achieved, reducing the perce
Jan 26, 2026