Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Prediction of Fines in Mining and Quarrying Applications Using the Fracture Density Model (FDM)

    By C. Mick Lownds, Dale S. Preece, Ali Bhuiyan

    FDM (Fracture Density Model) is a three-dimensional mechanistic model of blast induced rock fragmentation. FDM uses several computational mechanics algorithms to simulate the effect of blasting in dif

    Feb 6, 2023

  • ISEE
    Review of Equations of Motion of Linear Shaped Charges Liner

    By Seokbin Lim

    According to published literature, the equation of motion of linear shaped charges (LSCs) has been investigated as early as the 1960s in a few research organizations. However, due to the comparatively

    Jan 1, 2014

  • ISEE
    Run of Mine Fragmentation Optimization Utilizing Blasting

    By Tristan Worsey, John Rathbun, Andres Malone

    A run of mine, low grade gold heap leaching operation is currently looking to increase ounce recovery by decreasing run of mine fragmentation size. Current blasting practices have resulted in an avera

    Jan 1, 2015

  • ISEE
    The Impact of Stochastic Variables on the Rock Blasting Results

    By Carlos Agreda

    "It is widely accepted that the rock blasting results are a function of several stochastic variables given by: -The natural geological structure of the rock mass (joint spacings, discontinuities lengt

    Jan 1, 1996

  • ISEE
    Controlling Backbreak with Proper Borehole Timing

    By Calvin J. Konya

    Backbreak behind the last row of boreholes can be a significant problem for blasting operations. Backbreak will interfere with the proper drilling and execution of the subsequent shot and can produce

    Jan 1, 1987

  • ISEE
    Bingham Canyon Mine-Blasting Through and Next to Active Underground

    By Robert Jacob Cefalo

    In 2019, the Bingham Canyon Mine, owned by Rio Tinto Kennecott Utah Copper Company, mined through the active underground that dewaters the pit. The active underground required the limitation of vibrat

    Feb 1, 2020

  • ISEE
    The Hercudet System of Initiation

    By Robert B. Hopler

    Hercules Incorporated has designed, developed, and begun introducing a new non-electric delay blasting cap system which is radically different from anything presently available. This system, called He

    Jan 1, 1975

  • ISEE
    Rock-to-Sensor Transmissibility of Vibrations

    By L. M. Lopez, J. A. Sanchidrian

    This work investigates the performance of some of the measurement techniques used in vibrations from blasting monitoring. Two tri-axial geophones with cases of different size, shape and mass were test

    Jan 1, 2014

  • ISEE
    Pump Protection Systems on Mobile Equipment

    By Tom Watts

    This paper will focus on the design, manufacture and use of pump safety systems on MMUs (Mobile Manufacturing Units – Bulk Trucks) with progressive cavity pumps. The practice of pumping bulk blasting

    Jan 1, 2009

  • ISEE
    Study of the Detonation Process of Novel Hydrogen Peroxide-based Explosives Using High Speed Video

    By Italo Onederra, Miguel Araos

    "In order to characterize non-ideal explosives, the explosives industry rely on unconfined velocity ofdetonation tests and where possible underwater pond tests. The information obtained from such test

    Jan 1, 2017

  • ISEE
    Measurement of the In-Hole Density of Gassed Explosives at Peruvian Mines

    By Romel Villanueva, Juan Vasquez

    We present the results of our field research on the variation of the density of the gassed explosives and their influence on the blasting results in the Peruvian mines: Yanacocha, Toquepala and Antami

  • ISEE
    How Genetic Algorithms and Cloud Processing Optimise

    By Mark Roberts

    Automation, data analytics and optimisation are key trends in the mining industry. Doing more, and better, while expending less resources targets KPIs around efficiency and productivity. With the expl

    Feb 6, 2023

  • ISEE
    Geomechanical differentiation of cratering mechanisms with two degrees of freedom and burden dependency investigated through single hole blast tests.

    By J. D. Aubertin

    Rock blasting is a complex engineering process that requires in-depth knowledge of operations and geomechanical conditions. Acknowledged design precepts are based on cratering behavior associated with

    Jan 1, 2024

  • ISEE
    Sequential Blasting Initiation System With Rf Control (Sbis–rf)

    By Lazar Kricak, Zoran Teodorovis, Dragan Bogunovic

    Scattering of delay interval around nominal value is an important issue in blasting practice. The scatter interval, as becomes wider, increases a probability of time delay overlapping adjacent blastho

    Jan 1, 2008

  • ISEE
    Seismic Modelling Control Of Blasts In A Nuclear Power Plant

    By Alain Blanchier, Pascal Bernasconi

    Blasting operations took place on Channel coast NW of France to extend Flamanville Nuclear Power Plant (EPR new generation). The closest operating reactor building was monitored by a 24 remote vibrati

    Jan 1, 2008

  • ISEE
    Improving open-pit blast design through rock hardness estimation and prediction based on Measurement-While-Drilling data: Applications in large copper mines in Chile.

    By Sebastián Seria, Jorge Álvarez, Diego Cáceres

    The capacity to break the rock into adequate size fragments and in a cost-effective way is one of the main challenges in large open pit copper mines in Chile. That capacity is often compromised by the

    Jan 26, 2026

  • ISEE
    Journal: 100 Years / DRIVING HEADINGS IN ROCK TUNNELS Transactions of the American Institute of Mining Engineers New York 1910

    By W. L. Saunders

    RBH Note: In the early days of drill & blast tunneling the jobs utilized large crews of drillers and muckers. Advance per round was limited (typically around four feet) but two rounds per 8-hour shift

    Jan 1, 2011

  • ISEE
    The Waiting Time Recovery Test

    By John T. Aler

    The U.S. Bureau of Mines has been studying the problem of why explosives detonate weakly or misfire during blasting in underground coal mines. Cross-borehole shock wave interaction has been identified

    Jan 1, 1991

  • ISEE
    Summer Internship Project at an Underground Gold Mine

    By Tristan Worsey

    This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo

    Jan 1, 2010

  • ISEE
    A New Integrated Workflow to Increase Drilling Accuracy using Post Process Kinematics(PPK) Drones and Smart Drills

    By Ravi Sahu, Kris Jeremiah

    This paper aims to study the benefits of using Post Processed Kinematics(PPK) surveying methodology combined with Drone photogrammetry to achieve highly precise positioning (X, Y, Z) of drill holes b

    Feb 1, 2020