Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley SiteBy Gyimah Kasali
Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)
Jan 1, 2002
-
Approach To Reliability Based Design On Deep Mixing Improved GroundBy Masaki Kitazume
Deep mixing method, in-situ admixture stabilization technique, has been developed and adopted for on land and marine construction works in Japan. The geotechnical design procedure of the method has be
Jan 1, 2004
-
Design Of Sheet Piling For The Prague Metro Line CBy Jan Pru?ka
This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat
Jan 1, 2011
-
Estimation Of Settlements Of Piles In GroupBy Kazimierz Gwizdala
In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles
Jan 1, 2002
-
Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In DrivingBy Hodjat] [Shiri
A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in
Jan 1, 2006
-
1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papersBy J. Hartikainen
19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an
Jan 1, 1994
-
Urban Legends: Two Case Studies That Redefine "Impossible"By Grant R. J. Bearss
Due to environmental concerns in urban construction, many typically simple projects become very complex or feasibly impossible. The introduction of relatively new concepts has redefined "impossible",
Jan 1, 2002
-
New Technologies For Quality Control Of Augered Cast-In-Place PilesBy Tracy Brettmann
In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r
Jan 1, 2000
-
The Use Of Stone Columns On Settlement And Liquefaction Susceptible SoilsBy Ivan Jackson Madura
The new Paradisus Coco Beach Resort in Rio Grande (PR) is located on an old swamp area, which has been filled with relatively clean to silty sands. The swampy deposits consists of organic silts, peat
Jan 1, 2002
-
Preserving The Foundations Of Some Of Boston?s Oldest BuildingsBy Michael J. Atwood
Many buildings in Boston are founded on untreated wood piles, which can deteriorate and lose their structural capacity if groundwater levels are lowered below the tops of the piles, exposing the wood
Jan 1, 2011
-
Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk ZoneBy M. Reza Saberi, T. Ted Miyake
Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical
Jan 1, 2018
-
High Capacity And Fully Removable Soil AnchorsBy Anthony D. Barley
Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit
Jan 1, 2002
-
Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation GroutingBy David Preece
The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem
Jan 1, 2011
-
Seattle Shored Excavation - Design, Construction, MonitoringBy David Winter
The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of
Jan 1, 1987
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014
-
Lateral Load Testing Micropiles To Evaluate The Impact Of Threaded Joints And Casing Embedment On Short Micropiles In Shallow RockBy J. Brian Anderson
Jointed micropiles were investigated to support bridge foundations where shallow rock was present. In this application, micropiles would have some amount of unsupported length, and would be subject t
Jan 1, 2011
-
New Possibilities for Quality Assurance of Diaphragm Wall JointsBy Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
Driven PilesBy S. Merjan
Three papers were presented for discussion at the conference: 1) Instrumented driven steel tube piles at Canary Wharf; author: A. R. Gaba, United Kingdom. The author described the Canary Wharf
Jan 1, 1991
-
Construction And Instrumentation Of A Deep Foundation ? SynopsisBy Y. K. Wong
This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment
Jan 1, 2010
-
Non-Destructive Testing Methods For Drilled Shaft And Acip PilesBy George Piscsalko
There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me
Jan 1, 2011