Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dynamic Analysis Of Follower Driven Piles For The Venice Flood Gate ProjectBy Frank Rausche
Without doubt, driven piles are the most economical deep foundation element for a nearshore environment, providing for high bearing capacities and stiffness, quick installation times, assured quality
Jan 1, 2006
-
An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The ProblemBy M. Zanotto
[ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole
Jan 1, 1992
-
Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:By Alun J. Davies
This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co
Jan 1, 2000
-
Crane Boom Loadings From Pile DrivingBy Alan G. MacKinnon
Loads and stresses from pile driving are increasing from heavier piles and more powerful hammers. Stresses can be dangerous to equipment stability. Equipment developer MacKinnon tells how to compute s
Jan 1, 1986
-
Arbitration - The Tender TrapBy James Green
It has often been said that the best contracts written are by people who are suspicious of each other. The Spanish philosopher, Ortega y Gasset, said: "Every contract is an Act of Distrust." T
Jan 1, 1987
-
Effect Of Transverse Stresses On The Strength Of Steel Sheet Piling And Recommended Changes In Design ProcedureBy Richard J. Hartman
Current design practice is to select steel sheet piling sections using sufficient section modulus and yield strength to resist the calculated bending moment. Thus, section modulus is the only property
Jan 1, 2006
-
Vessel Collision Design - Risk Analysis And Deep Foundation Issues For Bridges Over Navigable WaterwaysBy Michael A. Knott
Large lateral forces on bridge foundations due to extreme events such as vessel collisions, earthquakes, and wave forces on storm surges during hurricane events are often the controlling design condit
Jan 1, 2013
-
Construction And Design Of Drilled Shafts In Hard Pinnacle LimestonesBy Dan A. Brown
The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos
Jan 1, 1991
-
A Critical Appraisal Of Is-Code Provisions For Pile Design ? SynopsisBy N. Som
The pile capacity in cohesive and granular soils depends on a number of parameters. The values of these parameters as recommended by Indian Standard Code of Practice vary over wide ranges. A designer
Jan 1, 1996
-
Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway BridgesBy Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006
-
Application Of Bu-Type Steel Sheet Pile On Construction Of Ports ? PrefaceBy Zhou Lu-Jian
The Port of Shekou is situated at Shenzhen Bay on the east bank of Lingding Ocean. Its coastline is about 6 km long and the water depth near the shore is Favourable. Across the bay is the ' New T
Jan 1, 1991
-
Single Pile Settlement Prediction And Analysis For Driven PilesBy David R. Beadman
The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid
Jan 1, 2006
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas
-
Use of Menard Pressuremeter Test Results to Predict a Bearing Capacity and Settlement of Bored PilesBy Ramdane Bahar
"Abstract The design foundations can be performed using Menard pressuremeter rules that require a limit pressure and a pressuremeter modulus. In recent years, another trend of interpretation of this t
Jan 1, 2014
-
What Has Been Learned About Drilled Shafts From The Osterberg Load Test - SummaryBy Jorj O. Osterberg
The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc
Jan 1, 1999
-
Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup EffectsBy Mohammadreza Khanmohammadi, Kazem Fakharian
"AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise
Jan 1, 2014
-
Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)By Tracy Brettmann
Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2004
-
History Of Chicago Foundation Systems & Underground Construction ? SummaryBy Theodore R. Maynard
The history of foundation engineering in Chicago is a tale of innovation, made necessary in order to keep pace with structural technology which allowed taller buildings with heavier bearing loads, to
Jan 1, 1991
-
The Construction And Performance Of Prestressed Ground Anchors In Soils And Weak Rocks: A Personal Overview - SummaryBy Donald A. Bruce
The paper reviews aspects of the construction and performance of prestressed ground anchors installed in soils and weak rocks. Attention is focused on good practice for drilling, tendon fabrication an
Jan 1, 1991
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999