Experimental Investigation Into The Stress And Strain Development Around A Displacement PileBy Jelke Dijkstra
This paper presents the results of model pile load tests in a photoelastic material. The soil in this test is represented by an assembly of photoelastically sensitive glass particles, which allows for
Jan 1, 2006
-
Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 IntroductionBy Timothy L. Roberts
For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary
Jan 1, 1998
-
Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge ConsortiumBy Jacob Chacko
The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten
Jan 1, 2011
-
Effect Analysis On Static And Dynamic Tests Of Pile FoundationsBy Hou Shitao
With the development of Wuhan's city planning in China, new buildings of moderate and high store have been increasing day by day. Precast concrete piles or cast-in-site piles were used in the maj
Jan 1, 1991
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation RemediationBy Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
I - 280 / San Francisco Pile Load Test Results And Seismic Design Guidelines - 1. Earthquake Loading Of Structures - A Brief Overview - 1.1 The 1989 Loma Prieta Earthquake - 1.1.1. CSMIP Records - Recorded Time-History DataBy James A. Mason
The State of California has instrumented numerous buildings, bridges, and dams throughout the state with earthquake recording devices. These accelerometers are strategically placed to measure the resp
Jan 1, 1993
-
Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37By Gordon Chen
The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the
Jan 1, 2009
-
Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? IntroductionBy Thomas A. Printz
The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac
Jan 1, 2013
-
Single Axis Tooling Methods - A. IntroductionBy George K. Burke
Single axis soil mixing is a mechanical method of blending soil in situ with a reagent binder to achieve improved character. Generally this achieves a design compressive strength or shear strength and
Jan 1, 2001
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Deep Soil Stabilization Using Lime Cement Columns - Synopsis:By Melvin I. Esrig
Lime Cement column stabilization of soft clay and sand in Salt Lake City, Utah and in San Francisco California is described and discussed. Stabilization permitted the construction, in a single stage,
Jan 1, 2000
-
Construction Of Pile Foundation For Railway ViaductsBy M. D. Khattar
The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc
Jan 1, 1989
-
Bore Pile Stabilization Issues in Offshore Marine WorksBy Nuno Cruz, Saúl Rodríguez
"When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work
Jan 1, 2017
-
Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? BackgroundBy Colin C. West
On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p
Jan 1, 1987
-
Dynamic And Static Loading Tests Of Piles For Bridges In Surinam - IntroductionBy W. J. van Niekerk
Ballast Nedam is in Surinam constructing two bridges that will improve communications in the coastal region. The bridges will cross the Coppenam and Surinam rivers and will be founded on open-ended st
Jan 1, 2000
-
Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, TennesseeBy James L. Vinson
Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to
Jan 1, 2006
-
Recent Experiences With Bi-Directional Static Load TestingBy M. England
Keywords: Bi-directional tests, Osterberg cell, O-cell®, static load tests, Timeset® Static load testing, where loads are applied vertically to the top of the pile and often referred to as 'to
Jan 1, 2006
-
Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure SitesBy John P. Davis
The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s
Jan 1, 2006
-
Friction Piles In Boston Blue Clay, Suffolk County House Of Corrections, Massachusetts ? SummaryBy Harry K. Weatherbee
The paper presents a design case study for a four-story correction facility addition in south Boston, Massachusetts, supported on friction piles driven into the Boston Blue Clay. 356 mm (14-in.) squar
Jan 1, 2003
-
Challenges Associated with the Construction of a Cofferdam – A Case StudyBy Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017