Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? Synopsis

    By A. K. C. Chan

    Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460

    Jan 1, 2010

  • DFI
    Recent Advances In Soil Nailed Earth Retention

    By Tom A. Armour

    Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&

    Jan 1, 2003

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2000

  • DFI
    Building Response To Construction Activities

    By Marco D. Boscardin

    Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have

    Jan 1, 2003

  • DFI
    LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) Test

    By Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles

    "This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te

    Jan 1, 2017

  • DFI
    The Analysis And Computation Of Soil-Pile (Wall) Interaction For Deep Excavation Of High-Rise Building

    By Lu Peiyan

    A computation model of soil-pile (wall) interaction under lateral loading is presented in this paper. The model has been applied to some engineering projects, and the comparison between computation re

    Jan 1, 1991

  • DFI
    Mini-Pile Design And Construction Methods Change To Mitigate Soil Loss Through Glacial Till

    By Cassandra A. Wetzel

    Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between

  • DFI
    Rapid Lateral Load Testing Of Deep Foundations

    By Dan A. Brown

    This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of

    Jan 1, 2007

  • DFI
    Once Again, Engineering And Contractor Tenacity Overcome Tough Geology

    By John E. Lens

    How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran

    Jan 1, 2006

  • DFI
    Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield Terminal

    By Randy R. Huberty

    Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result

    Jan 1, 2001

  • DFI
    Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - Synopsis

    By Yvone Franco Crosato

    The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat

    Jan 1, 2000

  • DFI
    Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DC

    By Joseph C. Gillen

    This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d

    Jan 1, 2006

  • DFI
    New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End Bearing

    By J. Osterberg

    A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward

    Jan 1, 1989

  • DFI
    Predicting The End Bearing Capacity Of Rock Socketed Shafts

    By Lianyang Zhang

    For optimal design of rock socketed shafts used to support axial loading, it is important to predict the end bearing capacity. The existing empirical methods for determining the end bearing capacity o

    Jan 1, 2008

  • DFI
    Selection & Design Of Augered Cast-In-Place (ACIP) Piles

    By Dan A. Brown

    Outline ? Basic Concept of ACIP Piles ? Factors Affecting ACIP Pile Performance ? Applications: - Favorable Conditions - Unfavorable Conditions ? Design for Axial Loading ? Lateral Loa

    Jan 1, 2004

  • DFI
    Quality Control Of Piling And Deep Foundations In Belgium, From The Design To The Execution. ? Synopsis

    By D. Goossens

    Quality control is a system which should guarantee that quality is achieved. It is the execution and verification of a project in an organised way, in order to obtain the maximum of certainty that the

    Jan 1, 1996

  • DFI
    Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring System

    By Stephan Großwig, Karolina Nycz, Arne Kindler

    "Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu

    Jan 1, 2017

  • DFI
    Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls

    By B. Sivarama Sarma, Biswabikash Rout

    "Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes

    Jan 1, 2017

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • DFI
    Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - Summary

    By Basem Sh. Hazzan

    In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on

    Jan 1, 1999