Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
Partnering for Cutoff Wall Project SuccessBy Osvaldo Valdez, Matteo Bertoni, Aem Ragy
The East St. Louis Deep Cutoff Wall project is located in the area of East St. Louis, Illinois, across the Mississippi River from the city of St. Louis, Missouri, along the left descending bank of the
Sep 1, 2023
-
The FHWA Geotechnical Program for 2017"Every year during the Transportation Research Board (TRB) Annual Meeting in Washington D.C., the Federal Highway Administration (FHWA) National Geotechnical Team (NGT) takes time to talk about what w
Jan 1, 2017
-
Session 29 "Grouting for Tunnels 1"By Lynn Crayne
We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the
Feb 10, 2003
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement ProjectBy Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang
During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati
Jan 1, 2019
-
Foundation Construction Challenges At 100 11th Avenue In Manhattan - Secant Pile WallBy Andrew Cushing
This paper presents the design and construction of the foundation for a major high-rise real estate development on the west side of Manhattan. Arup was retained by Underpinning and Foundation Skanska
Jan 1, 2008
-
Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, MumbaiBy Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu
"Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran
Jan 1, 2015
-
Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil MixingBy James Coull, Brian Wilson, David Siddle
"In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica
Jan 1, 2017
-
Deep Soil Mixing Trials at Porto Alegre Airport, BrazilBy A. Ortigão, M. Felix, E. Falk, T. Koehler
"Ground improvement techniques such as vibro-replacement or deep soil mixing are fairly young products in the Brazilian geotechnical market. Soft soils in this country are deep, very soft, have low se
Jan 1, 2015
-
3D FEM Modelling of a Ground Improvement SolutionBy Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim
A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo
Sep 8, 2021
-
Trouble In Paradise: Micropiles As A Solution To Challenging Geotech And Steep, Rugged Terrain On The Island Of OahuBy Steve Davidow, Scott Tunison
As the demand for electric power grows and generation facilities are constructed in more remote areas, the industry faces an increasing number of foundation construction challenges. The importance of
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley MineBy Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality ControlBy Franz-Werner Gerressen
New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su
Jan 1, 2019
-
State of the Art Ground Improvement Technique for a Residential Complex: Case StudyBy Madan Kumar Annam, Hari Krishna Y, I. V. Anirudhan
"For completion of projects in time with positive results, improvements of productivity and effective project management procedures have become extremely important. This paper discusses a milestone pr
Jan 1, 2015
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Proposed Micropile Section for the 2006 IBCBy Lawrence F. Johnsen, Marc J. Gallagher
"Micropiles are small diameter, bored, grouted-in-place piles incorporating steel casing and/or reinforcements. The omission of micropiles from most United States building codes has resulted in the ap
Jan 1, 2005
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s PerspectiveBy A. David Miller, Chika Oya
"Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi
Jan 1, 2017
-
Helical Pile Foundation Solution for Landfill RedevelopmentBy Kevin Baumgartner, Steven Babcock
A landfill in Phoenix, AZ reached capacity and was graded over in the 1970s. The property was subdivided into lots in 2007 to create a business park. However, the challenging site conditions caused by
Sep 8, 2021