Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Practical Considerations in the Operation of Gold Gravity Circuits

    By A. Putz, F. Vincent, A. R. Laplante

    "This paper briefly reviews some of the gravity research done at McGill University and current Canadian operating practices, with emphasis on results of interest for operators. The following topics ar

    Jan 1, 1994

  • CIM
    Recent electric furnace developments at Falconbridge (Sudbury Operations)

    By J. Chao, C. Tan, N. Stubina

    "Since J978, Falconbridge Limited has operated two electric furnaces at its nickel-copper smelter in Sudbury. As part of its S02 Abatement Program, the smelter has undergone many changes over the last

    Jan 1, 1994

  • CIM
    McArthur River Project - the future of Key Lake

    By J. Spross

    "The Key Lake mill has operated since the fall of 1983. The ore from both Key Lake open pits will be depleted by 1997. It is planned to use this mill, located about 60 km southwest of McArthur, to pro

    Jan 1, 1994

  • CIM
    Comparison of surface and underground disposal of tailings waste

    By D. Bois, F. P. Hassani, M. Hossein

    "A growing environmental awareness hos prompted the mineral industry to seek innovations in waste management and technology. It is estimated that over 500 million metric tonnes of solid waste each yea

    Jan 1, 1994

  • CIM
    Study on Acoustic Wave Propagation in Fractured Rock Mass under High In-Situ Stress of Model Test and Damage Constitutive Relation (da00ca07-9cc1-45ad-9211-b9f1f4c94af2)

    By Hang Zhao, Xinping Li, Pingan Wu, Yi Luo

    The deep-buried rock surrounding the Jinping II Hydro-power Station was taken as the engineering background. Using model specimens of classified rock materials to simulate fractured rock mass under hi

    Jan 1, 2015

  • CIM
    Valuing copper-gold projects with flexible Monte Carlo

    By Michael Samis

    NOFLEX valuation results ? CF deviations and net CF risk discount factors ??Cash flow deviations indicate average cash flow variability. ??Net cash flow riskdiscount factors (NCFRDFs) indicate the

    May 1, 2006

  • CIM
    Continuous minicell test of collectorless flotation at Mattabi Mines Ltd.

    By M. Leroux, S. R. Rao, J. Kim, J. A. Finch

    "Continuous in-plant testing of collectorless Cu/Pb bulk flotation on Lyon Lake ore at Matlabi Mines Ltd. Was conducted using a portable circuit based on 5 L mini flotation cells. It is concluded that

    Jan 1, 1994

  • CIM
    Effect of Mechanical Activation of Fly Ash on Geopolymer Properties

    By I. Osvath, I. Gombköto, G. Mucsi, Z. Molnár

    "In the present research, a deposited brown coal fly ash was used as raw material for geopolymer. The reactivity of the fly ash was altered using mechanical activation, which is one of the promising m

    Jan 1, 2016

  • CIM
    Depression of Pyrite by Metabisulfite and Sulfite Ions in Seawater and Fresh Water

    By Leopoldo Gutierrez, Sergio Castro, Lina M. Uribe, Janusz S. Laskowski

    "The effect of sulfite and metabisulfite ions on the amyl xanthate flotation of copper-activated pyrite, in distilled water and seawater, has been studied by micro-flotation tests and redox potential

    Jan 1, 2016

  • CIM
    Generation of sulphur dioxide in blasting at Fox Mine

    By E. N. Durussel

    "The Fox Mine has been producing copper/ zinc ore since 1970 at a rate of approximately one million tons per year, and until 1978all production was derived from longhole open stopes. In June 1978, a t

    Jan 1, 1981

  • CIM
    Power factor regulation and peak load regulation

    By Jean-Luc Beaudoin

    "In addition to the actual energy consumed, billing is dependent on the peak load and the power factor. The lower the power factor goes, the higher will be the penalty the consumer pays. The principle

    Jan 1, 1982

  • CIM
    Visual Mine Planning

    By Peter N. Calder

    Long range mine planning involves developing a mining sequence that schedules the extraction of the ore and waste materials within a final pit limit. The objective is to define a sequence that best me

    May 1, 2003

  • CIM
    Advanced characterization of a stress corrosion crack from an in-field serviced X-52 steel line pipe

    By Jian Li, V. Y. Gertsman, David C. Katz, M. Elboujdaini

    Analysis of stress corrosion cracking (SCC) usually involves high-end analytical tools including scanning electron microscope (SEM) and analytical transmission electron microscope (TEM). In recent yea

    Jan 1, 2004

  • CIM
    Young-Davidson Mine

    By C. C. Allen, H. H. North

    "The Young-Davidson mine is in the southeastern part of Powell township, in the district of Matachewan. It is 32 miles southwest of Kirkland Lake, 48 miles southeast of Timmins, and 25 miles by road N

    Jan 1, 1954

  • CIM
    The Effects of High Antimony in Electrolyte

    By Bradford C. Wesstrom

    An overview of the challenges encountered at the Freeport McMoRan El Paso Copper Refinery with higher concentrations of antimony electrolyte will be shared. The observations will cover the detrimental

    Jan 1, 2014

  • CIM
    The Engineering, Procurement and Construction of the Éléonore Project

    By A. Fortin, C. Fréchette, M. Kreuh

    Éléonore project is a gold ore processing plant at a mine site located near James Bay, Quebec, Canada. SNC-Lavalin was mandated by Goldcorp to perform EPCM services on the ore processing plant and per

    Jan 1, 2015

  • CIM
    Leveraging Advanced Machine Data Systems to Drive Continuous Improvement in Mining Operations.

    CI, Data and Data Systems Road Analysis Control Quick and simple manual Analysis Case study Visual relation of analysis

    May 1, 2013

  • CIM
    Operation and Maintenance of Grinding Circuits at Sidbec-Normines

    By Michael Jerome Wallace

    "This paper refers to the wet open circuit ball mil ls in operation at Sidbec-Normines'5 pelletizing plant at Port-Cartier, Quebec, which commenced operations in late November· 1977. Prior to detailin

    Jan 1, 1979

  • CIM
    Tonnage Uncertainty Assessment of Vein-Type Deposits Using Distance Functions and Location-Dependent Correlograms

    By David F. Machuca-Mory

    Modelling the geometry of a vein is a crucial step in resources estimation. The resulting models are used as mineralization domain boundaries and have a direct impact on the tonnage of estimated resou

    Oct 1, 2009

  • CIM
    From Buttons to Bits - Achieving Level 3 Integration

    By Christopher McElman

    Real-time mine management solutions have evolved over time from closed, proprietary solutions, to a "system of systems" that may include a wide variety of off-the-shelf components and technologies. Mo

    Oct 1, 2009