Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Black Island silica quarry

    By F. E. P. PEARSON

    Sandstone quarried from an island in Lake Winnipeg is barged 130 km to a processing plant at Selkirk on the Red River. The stone is white, poorly consolidated, and consists of rounded quartz grains of

    Jan 1, 1984

  • CIM
    Research and Practice of the Strengthening Treatment of Geological Defects in Foundation of 305 Meters High Arch Dam in Jinping I Hydropower Station on the Yalong River

    By Shengwu Song, Xuemin Feng

    Jinping I hydropower station is located in Sichuan Province in Southwest China. It is built on the Yalong River as a controlling cascade hydropower station in the middle and lower reaches, with power

    Jan 1, 2015

  • CIM
    The James Bay Pyrochlore Deposit

    By H. R. Stockford

    "A pyroxenite-carbonatite complex containing extensive pyrochlore mineralization was discovered during January, 1966, within an exploratory license area held by Consolidated Morrison Explorations Limi

    Jan 1, 1972

  • CIM
    Lender?s Perspective on Financing: Back to the Future!

    By Jeff Stufsky

    Debt Financing ?Broad Market Overview ? Recovering due to factors including: ? Increased trust in the system ? Enhanced capitalization of financial institutions ? The need to deploy capital for

    May 1, 2010

  • CIM
    Red Lake Gold Shore Mine

    By J. B. Mawdsley

    "The Red Lake Gold Shore mine is 4/5 mile west of the town of Red Lake, Ontario, and a mile northwest of the Howey mine. It came into production in August 1936, and in a little over 2 years produced 2

    Jan 1, 1954

  • CIM
    Strategies to Eliminate Grain Coarsening in Aerospace Alloys

    By K. Regl, J. Berneder

    "AMAG investigated different aspects to improve the resistance against grain coarsening in aerospace alloys during recrystallization and was successful in finding several opportunities to minimize thi

    Jan 1, 2018

  • CIM
    Experimental Electric Smelting of To Produce High-Titania Slag and Ilmenite Pig Iron

    By G. E. Veins

    This paper summarizes an investigation in which beneficiated ilmenite ore was smelted in a continuous, three-phase, 250 kv.a., open-top electric furnace. Minus %. inch ore was smelted, using the stand

    Jan 1, 1957

  • CIM
    Processing of Natural Gas

    By J. M. Hollicky

    The economical processing of wet and sour natural gas presents a problem due to the seasonal demand for natural gas. The plants must be sized to handle the peak loads but may only operate at half capa

    Jan 1, 1958

  • CIM
    The Design of Advanced Clean Coal Technologies: Where are we and Where are we Heading?

    By Nancy C. Mohn

    ?Even though the age of many existing coal units exceeds 30 years, these units continue to perform with excellent reliability and at a competitive cost with other fossil fuel units. ?NERC data shows

    May 1, 2001

  • CIM
    An Integrated Quality Management System for Piping Fabrication Using 3D Laser Scanning and Photogrammetry

    By M Safa

    Addressing deficiencies and defects that occur during construction projects is costly and time consuming. The manual quality assurance programs currently used in the industry have certain limitations,

    Aug 1, 2013

  • CIM
    Smelting Iron Oxide Pellets in the Shaft-Electric Furnace

    By G. V. Sirianni, G. E. Viens, R. A. Campbell, G. N. Banks

    A combination shaft-electric furnace for the smelting of ores and the melting of metallized feed is being developed at the Mines Branch. When iron oxide pellets are smelted in this unit, they are preh

    Jan 1, 1971

  • CIM
    Nitrate Stress Corrosion Cracking of Carbon Steel in the Heat Recovery-Steam Generators of a Co-Generation Plant

    By F. N. Smith

    The carbon steel casings of Heat Recovery Steam Generators (HRSGs) in a co¬generation plant were found to have developed cracks that originated on the inside surfaces. The HRSGs receive hot exhaust ga

    Jan 1, 2005

  • CIM
    Constraint Model: A Continuous Improvement Tool to Debottleneck Vertically Integrated Mining and Metallurgical Operations

    By A. Khan

    The purpose of this paper is to demonstrate the value of identifying and optimizing throughput constraints by utilizing a Constraint Model. This will be achieved by first understanding the overall con

    Aug 1, 2013

  • CIM
    Radioisotope Gauging ? the 1n Mining Industry

    By Bruce W. Smith

    Non-contacting, radioisotope density and level gauges are discussed. The characteristics of the more commonly used isotopes, the techniques of detection and the methods of presenting information are r

    Jan 1, 1964

  • CIM
    Notes On Explosives

    By E. Godfrey

    The average man one meets on the street thinks of an explosive as a medium of death and destruction, something unstable which should be given a wide berth, because he knows little or nothing about its

    Jan 1, 1926

  • CIM
    Recovery of Nickel from Lime Treatment Sludge by Leaching and Ozonation

    By F. Barriga-Ordonez, J. A. Finch, L. Calzado, S. R. (Ram) Rao

    Sludge, formed by lime treatment of acidic drainage and stored in tailing ponds of the Sudbury region, contains 5-7% Ni, mostly in a mix of hydroxides with Fe (~ 10%), Mg (~ 10%) and Cu (-0.5%), and C

    Jan 1, 2005

  • CIM
    Mac porphyry molybdenum prospect, north-central British Columbia

    By G. R. Cope, C. D. Spence

    "The Mac porphyry molybdenum prospect is located 100 km east of Smithers in central British Columbia. The identification of anomalous levels of molybdenum, copper, and silver in three adjacent lakes,

    Jan 1, 1995

  • CIM
    The Occurrence of Uranium in the Lake Athabasca Region

    By S. C. Robinson

    "IntroductionALTHOUGH most uranium deposits of the Canadian Shield lie along its western and southern margins, those of the Lake Athabasca region extend easterly along the north shore of the lake and

    Jan 1, 1952

  • CIM
    Thickened Tailings and Red Mud Disposal

    By V. L. Mitsopoulos

    This paper provides a summary of tailings disposal techniques and the improvements that have been made through the introduction of thickened tailings disposal. The general properties and characteristi

    Jan 1, 2006

  • CIM
    Argumentation of Geomechanics Applications Ultimate Solution

    By I. A. Kovalevska

    Considered problems: elaboration and implementation of resource-saving technologies, low-cost support systems improvement, openings security and support, based on wallrock condition control with supre

    Aug 1, 2013