Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stratigraphic and structural setting of stratabound lead-zinc deposits in southeastern B.C.

    By Trygve Høy

    "Important stratabound lead-zinc deposits in southeastern B. C. occur in rocks that range in age from Proterozoic Helikian to Middle Cambrian. The Sullivan deposit, and similar but smaller deposits in

    Jan 1, 1982

  • CIM
    Modeling stress relaxation at high temperatures involving delayed elasticity

    By Shoma Sinha, Nirmal K. Sinha

    Deformation in a material at any temperature is known to consist of two major components - a reversible (elastic) part and an irreversible part (often called plastic). What is not universally known is

    Jan 1, 2004

  • CIM
    Excavation Damage, and Water and Gas Migration in an Inherently Anisotropic Argillaceous Rock Formation

    By D. A. Le, T. S. Nguyen

    "In Canada and other countries, several types of rock formations are being considered for the geological disposal of radioactive wastes. In order to better understand the ability of these rocks to con

    Jan 1, 2015

  • CIM
    Changes in Physical Properties and Microstructure of Metals Due to Rapid Straining

    By J. Duby

    "A description is given of a series of tests performed to determine the comparative effects which dynamic and static straining, in compression, have on the physical strength properties of mild steel a

    Jan 1, 1960

  • CIM
    Texada Island limestone quarry

    By P. M. STILES

    Acquired in 1957, the limestone quarry of Ideal Basic Industries on Texada Island north of Vancouver has become a major supplier of high purity limestone and construction stone. Crushed limestone prod

    Jan 1, 1984

  • CIM
    Precipitation of Iron Fluoride Trihydrate from Mixed Acid Pickle Liquors

    By K. Östcrdahl

    We are developing a cost-saving and environmentally friendly process with low energy consumption to recover the metal content and recycle the acid from spent pickle baths. The metals are precipitated

    Jan 1, 2006

  • CIM
    Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

    By D. Kong, A. Klyashtorin, L. McGilp, I. Wilson

    This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at t

    Jan 1, 2020

  • CIM
    Uranium extraction process alternatives

    By C. R. Edwards

    "Since the first commercial extraction of uranium in the early 1940s, the range of feasible process alternatives has greatly increased. This paper reviews process options to reduce extraction costs, i

    Jan 1, 1992

  • CIM
    Chapter III- Continued - Part 10.-Rouyn-Chibougamau Area (Eastern Part) Major Faults, Abitibi Region

    By G. W. H. Norman

    "During the past few years emphasis has been placed on the importance of major faults, fault zones, and associated structures in localizing ore deposition. This interest has developed partly through e

    Jan 1, 1954

  • CIM
    Construction and Manufacture of Steel Wire Rope

    By G. C. Hodgson

    Specification and Tests of Rope Wire Chemical Analysis: The range in composition of steel used in the manufacture of wire rope is as follows: Carbon 0 4 to 0.9 per cent Manganese 0 4 to 0.8 Su

    Jan 1, 1931

  • CIM
    Plutons of the Chibougamau-Desmaraisville Belt - A Preliminary Survey

    By D. Racicot, T. Hanel, E. H. Chown

    Over thirty plutons in the Chibougamau-Desmaraisville belt were examined briefly in the field and sampled, in addition to the few masses that have been studied in detail. The survey indicates that the

    Jan 1, 1984

  • CIM
    The Mount Polley alkalic porphyry copper-gold deposit, south-central British Columbia

    By D. Gorc, T. M. Fraser, Z. T. Nikic, R. Pesalj

    "Mount Polley is an alkalic porphyry copper-gold deposit of Lower Jurassic age within the Quesnel terrane in south-central British Columbia. The silica-saturated Mount Polley intmsive complex is assum

    Jan 1, 1995

  • CIM
    Structure of the Yellowknife Greenstone Belt, Northwest Territories

    By I. C. Brown, J. F. Henderson

    "IntroductionThe Yellowknife greenstone belt lies along the west side of Yellowknife bay on the north shore of Great Slave lake, some 600 miles north of Edmonton, Alberta. The producing gold mines alo

    Jan 1, 1950

  • CIM
    The Design Aspects of Centrifugal Pumps for Abrasive Slurries

    By G. Wilson

    "Satisfactory hydraulic performance of a centrifugal slurry pump is not the only design criterion. If abrasive wear exists the severity of any damage can be reduced and the life of the wearing parts p

    Jan 1, 1973

  • CIM
    Predicting Patterns of Slurry Flow within and Discharge from a 3D Pilot SAG Mill

    Slurry flow, including flow through the charge, through the discharge grates, along the pulp lifters and its discharge from the mill is an important contributor to the efficiency of the grinding proce

    Jan 1, 2012

  • CIM
    The Caland Dredging Project

    By Nathaniel S. Scott

    Caland Ore Company Limited, a subsidiary of Inland Steel Company of Chicago, Illinois, leased an iron ore deposit from Steep Rock Iron Mines Limited on January 1, 1953.. This deposit lay underneath a

    Jan 1, 1961

  • CIM
    Hot metal desulphurising: Redesigning the hot metal ladle lining at Corus Ijmuiden

    By G. Dörsam, M. Spreij, S. J. Van der Wal, A. P. Schmidt

    The transfer of hot metal desulphurising from the torpedo cars to the hot metal ladles at the IJmuiden BOS plant no.2 caused a decrease in ladle lining life from 680 to 470 heats. Changing the desulph

    Jan 1, 2004

  • CIM
    Cu Extraction from Naturally-Sourced CuFeS2 Coupled to Zn Electrowinning in a Battery-Like System

    By K. M. Deen, E. Asselin

    Hydrometallurgical processes, i.e., Cu extraction from a mineral concentrate and Zn electrowinning, are coupled in a battery-like system. A naturally-sourced CuFeS2 concentrate mixed with activated ca

    Jan 1, 2019

  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - VOLCANIC ISLAND ARCS - Hydrothermal Fluid Evolution and Ore-forming Processes of Submarine Hydrothermal Systems in the Okinawa Trough

    By Qiling Zhang, Zengqian Hou, Xiaoming Qu

    Abstract - The Okinawa trough is an active back-arc-spreading center in which submarine hydrothermal exhalation (black chimneys) and sulfide mineralization are forming. Fluid inclusion composition in

    Jan 1, 1999

  • CIM
    Une mine à Madagascar: Les défis de la biodiversité.

    By Benoit Taillon

    Contenu de la presentation 1. Le projet QMM et son contexte 2. Gérer la biodiversité 3. Résultats obtenus QMM QIT Madagascar Minerals S.A. ? JV: Rio Tinto (80%) et Madagascar (20%) ? Trois gise

    May 1, 2011