Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • CIM
    Innovative Digital Instrumentation for Geotechnical Monitoring Systems

    By A. J. Hyett

    Due to the ongoing revolution in electronics and communications more cost-effective geotechnical instruments can be manufactured using digital technology. This new generation of digital instruments ha

    Oct 1, 2004

  • CIM
    Gold Ore Processing at the Musselwhite Mine - Feasibility, design and Operation

    By Donald Strickland, Peter Kresin, Dave Hall

    "Have your parents or grandparents ever tried to share with you their wisdom and you ignored it because it did not relate to you‘? I have been ignorant and inevitably grew older and wished I had liste

    Jan 1, 1999

  • CIM
    Clean and Efficient Roasting Solutions with Outotec’s Cutting-Edge Technology

    By K. Hasselwander, K. Knabel

    "A significant area of Outotec’s business involves fluidized bed roasting. With several decades of experience, more than 300 reference plants and strong R&D capabilities, the company provides several

    Jan 1, 2012

  • CIM
    Model Predictive Control as a Tool For Production Ramp-Up and Optimization at the Nkomati Nickel Mine

    By D. G. Almond

    Nkomati Nickel Mine in South Africa processes one of the world?s hardest ores in a 375k TPM autogenous grinding circuit. The plant employs an unconventional processing circuit, comprising a primary au

    Jan 1, 2012

  • CIM
    The CIMVAL Code for the Valuation of Mineral Properties

    By CIMVAL

    This Code for the Valuation of Mineral Properties (the “CIMVAL Code”) is the result of a review more than a decade after the release in 2003 of the “Standards and Guidelines for Valuation of Mineral P

    Nov 29, 2019

  • CIM
    Natural Gas in Canada and Its Uses

    By R. T. Elworthy

    Canada ranks second in the list of world consumers of natural gas. In 1923 our production was nearly fifteen million thousand cubic feet valued at $5,800,000. Our output, however, appears very small c

    Jan 1, 1925

  • CIM
    Metamorphism of Witwatersrand Gold

    By H. E. Frimmel

    Abstract - Most of the gold in the Late Archean Witwatersrand Basin is of detrital origin but, in its present form, it is metamorphosed. The only relict detrital features preserved are the morpho­logi

    Jan 1, 1994

  • CIM
    Better Flowsheeting with Modern Process Mineralogy

    By Norman O. Lotter

    The problem of quantifying the full performance potential of an ore body in a concentrator, and how to configure a flowsheet to achieve that potential, either for a new operation or an existing one, i

    Jan 1, 2011

  • CIM
    Sampling density and grade control

    By P. Groleau, O. Tavchandjian, D. Marcotte

    In open pit mining, each small mining unit (SMU) is selected for mill processing based on an estimate of its true grade. The estimation is usually done using analyses of cuttings from blast holes with

    Jan 1, 1998

  • CIM
    Engaging Local Communities and Sustainable Social Development

    By Dina M. Aloi

    In today?s evolving and globalized world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to ?engag

    May 1, 2007

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013

  • CIM
    Knelson-Deswik Milling Technology: Bridging the Gap between Low and High Speed Stirred Mills

    By David Rahal, Des Erasmus, Ken Major

    "Over the past twenty years there has been an increased emphasis on fine grinding in the minerals industry. This spurred the development of a range of new fine grinding equipment in the 1990s. At that

    Jan 1, 2011

  • CIM
    Upgrading Molybdenite Ores between Mine and Mill Using Microwave/Infrared (MW/IR) Sorting Technology

    By Eugen Gluck, Gus Van Weert, Peter Kondos

    "Microwaves have the capability to heat up sulphides, especially clusters of particles of approx. 1 mm. Some sulphides absorb microwaves more readily than others. Molybdenite is especially effective i

    Jan 1, 2009

  • CIM
    Enrichment of Low Grade Iron Ore for Better Resource Utilisation

    By L. Parthasarathy, S. K. Pan, M. P. Srivastava

    "Total iron ore reserves in India, as reported by the Indian Bureau of mines, are 23.6 billion tons. Hematite iron ore reserves constitute about 45 % of the total reserve. If we go by the National Ste

    Jan 1, 2008

  • CIM
    The Classification of Canadian Chrysotile-Asbestos

    By A. O. Dufresne

    A Step which, it is believed, will prove extremely beneficial to the Quebec asbestos-mining industry was taken during 1931, when the asbestos mine operators of the Province assembled to work out a uni

    Jan 1, 1932

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    Developments in at-Face/in-Pit Processing Technologies

    By Martin Stoklossa

    Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho

    May 1, 2008

  • CIM
    Comparative Costs of In bye Power in a Mine as Derived from Compressed Air or Electric Sources

    By Mark W. Booth

    THIS paper deals with the subject of inbye power as the mechanical . engineer sees it, and invites discussion, particularly from the electrical engineer. At the outset, it will be necessary to clear

    Jan 1, 1936

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003