Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Financial Issues in the Australian Gold Industry

    The purpose of this paper is to outline the current status of financing in the Australian Gold Mining industry and to discuss a number of developments that have occurred during 1983/84.Recognising the

    Jan 1, 1984

  • AUSIMM
    Rehabilitation At Stawell Joint Venture

    It was once considered sufficient to revegetate old mine sites using grass or trees. At the commencement of the Stawell JV (SJV) operation in 1981, management determined that pre-existing vegetation w

    Jan 1, 1992

  • AUSIMM
    Museum Station Conceptual Planning and Preliminary Works

    By Terry G. A B

    Before detailed design of Museum Station could commence, a number of factors had to be considered to determine its exact location within the city street pattern, the depth and the dimensions of th

    Jan 1, 1981

  • AUSIMM
    The Water Efficient Plant of the Future - Towards a Holistic Process Chain Approach

    By J Lim, M Powell, P J. Scales

    The current philosophy employed in the design of mineral processing plants effectively involves bolting together segmented unit operations both chosen and optimised from a product-centric perspective.

    Jan 1, 2009

  • AUSIMM
    The Influence of Hydrogeological Condition of Tunnel Construction

    An extensive railway construction prog- ram in the People's Republic of China has required the excavation of many tunnels in difficult ground, particularly in mountainous regions. Conclusions

    Jan 1, 1987

  • AUSIMM
    Demonstration of Rock Joint Reinforcement

    By Croggon R

    Passing a direct current through a jointed fine grained soft rock mass auses the movement of water by the process of electric-osmosis. There are other processes such as electrolysis which transport

    Jan 1, 1997

  • AUSIMM
    Restoring the Site - L&M Mining Limited - Waikaka Alluvial Gold Mining Project, Southland

    By D Manhire, G Hogan, M Ryan, S Whiteley

    Site restoration at the L&M Mining Limited alluvial gold mining project at Waikaka near Gore, Southland is described. In 2000 mining operations started to recover alluvial gold beneath historical

    Jan 1, 2003

  • AUSIMM
    Gold Mill Expansion at Kambalda

    The design, construction and operation of a 500,000 tonne per year Carbon-In-Pulp (C.I.P.) plant at Kambalda embracing the period from 1980 to 1982 has been previously discussed (Sceresini, 1982).Sinc

    Jan 1, 1984

  • AUSIMM
    Deephole Drilling at the Rosebery Mine, Tas

    "DEEPHOLE " or "Longhole" drilling is the name given to the drilling of prospecting holes with the pneumatic hammer drill. The drilling bit is of the same form, and is prepared in

    Jan 1, 1930

  • AUSIMM
    Development Of, And Experience With, Underground Electric Loaders

    By Sillet R, Corin P. J, Wilson G

    Zinc Corporation of Broken Hi11 had some long hole stopes coming into use which could not be mined using diesel loaders, because of ventilation restrictions. In preference to use of pneumatic load

    Jan 1, 1977

  • AUSIMM
    Seismic Stability of the Mt Frederick Sidecast

    By S J. Woods

    As a part of Solid Energy's progressive rehabilitation of the Stockton Mine, it was determined that significant rehabilitation of the existing Mt Frederick Sidecast would be required to ensure th

    Jan 1, 2003

  • AUSIMM
    Lead-Zinc Flotation Circuits Tested at Mount Isa Mines 1959-1963

    By Harraway DH, Tanner AC

    The various circuits tried!at Mount.Isa Mines during the period 1959-1963 to improve the differential%f lotation of galena and sphalerite are reported. The benefits and disadvantages of 'the vari

    Jan 1, 1963

  • AUSIMM
    Commissioning of the Olympic Dam Smelter

    The production of copper by the Outokumpu direct blister process commenced in July 1988. The problems and incidents encountered in commissioning the main smelter equipment are outlined. Early diffi

    Jan 1, 1989

  • AUSIMM
    Metallurgical Development of the Hellyer Ore

    By Lai KF

    The Hellyer orebody is a fine grained, massive sulphide Pb-Zn-Ag- Cu-Au deposit located in western Tasmania. Initial testwork showed that the orebody would be difficult but not impossible to treat by

    Jan 1, 1988

  • AUSIMM
    Mine Stability Evaluation from Microseismic Activity

    By Harris R. W

    Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE).

    Jan 1, 1992

  • AUSIMM
    Hydraulic Fill at Osborne Mine

    By J A. Brown

    Osborne Mine commenced hydraulic filling of three stopes in April 1999. Two of these stopes experienced barricade failures in July 1999 and January 2000. As a result, a review of hydraulic filling was

    Jan 1, 2002

  • AUSIMM
    Mine Planning and Grade Control - Goldsworthy

    By Newman H. A

    Goldsworthy Mining Limited is currently mining iron ore at an annual rate of 7 million tons from several small orebodies, each of which exhibit wide variations in iron, phosphorus, silica and alumi

    Jan 1, 1973

  • AUSIMM
    A Comparison through Observation and Simulation of the Power Utilisation and Performance of Two Dissimilar Comminution Plants

    By Johnston G, Revy T

    Dominion Mining Ltd. and the JKMRC have conducted a detailed investigation of the performance of two of Dominion Mining's gold treatment plants (Haveluck and Paddy's Flat). In terms of des

    Jan 1, 1991

  • AUSIMM
    Men and Materials Handling In 1100 Orebody Of Mount Isa Mines Limited

    By Kennedy B. J

    The 1100 Orebody is the main copper production area of Isa Mine with an output of 390 000 tonnes per four week period and a work force of approximately 260 men per shift. Currently a total of 56 ni

    Jan 1, 1977

  • AUSIMM
    The Ilmenite Deposits of Geographe Bay

    The southern portion of the Swan Coastal Plain, a geomor-: phological element formed since late'Tertiary times, contains commercially exploitable accumulations of ilmenite, zircon, rutile'

    Jan 1, 1964