Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Ferro Gully North Mine, Hamersley Province, Western Australia

    Portman Mining Pty Ltd very successfully operated the Ferro GullyNorth Mine in the Hamersley Province of Western Australia to satisfy a contract for the delivery of six million tonnes of iron ore in l

    Jan 1, 2001

  • AUSIMM
    Blast Design System

    ICI Australia has been developing PC-based software to assist the blast engineer to design and monitor open pit blasts. The scope of this software differs significantly from commercially available min

    Jan 1, 1992

  • AUSIMM
    Reducing the Risk - Application of Three-Dimensional Modelling Methods to Evaluate of Underground Mining Scenarios

    The availability of three-dimensional computer hardware and software makes the solid modelling of geological entities a realistic and logical alternative to previous sectional and plan 'models&ap

    Jan 1, 1993

  • AUSIMM
    The Technology of Flotation

    There are two mechanisms in the flo- tation process by which particles are transported from the pulp to the con- centrate: bubble-mineral aggregation and entrainment. It is the chemical processes w

    Jan 1, 1984

  • AUSIMM
    A Geomechanical Assessment Of Thick Seam Mining Methods With Regard To Their Application To Australian Black Coals

    By Rawlings C. D

    An assessment is made of the potential for thick seam underground mining of black coal in Australia. A brief summary is given of the geomechanical environment and previous mining history existing

    Jan 1, 1980

  • AUSIMM
    Development of Drilling and Blasting Practices at The Vickery Coal Mine

    By Conley R, Payne I

    The Vickery Coal Mine commenced open cut mining operations in May 1991. All overburden and interburden is drilled and blasted for excavation by dragline or hydraulic excavator. The mode of operation a

    Jan 1, 1992

  • AUSIMM
    The Effect of Clearance Angle on Wear of Rotary-Drag Bits

    By testing rotary-drag bits in granodiorite it was found that an increase in bit clearance angle from 241 0 to 33° decreased insert wear. Severe wear has precluded economic application of rotary-

    Jan 1, 1969

  • AUSIMM
    Wear Rate Evaluation of Mill Lining and Grinding Media Materials

    By Wingham DW

    Based upon the previous work of Norman and Loeb, a method, was used, to assess-the comparative wearing properties of ten different alloys being used, or being considered for use, as mill liners and g

    Jan 1, 1963

  • AUSIMM
    Remediation of a Severe Acid Sulfate Soil Disturbance Near Cairns, Australia

    By A E. McElnea, M A. Martens

    An 18-month project was undertaken to test the effectiveness of controlled daily tidal exchange augmented with hydrated lime treatment of surface waters as an approach for remediating a severe acid su

    Jan 1, 2003

  • AUSIMM
    Prediction of Ground Vibration Use due to Blasting

    In engineering applications of explosives for rock breaking, the released energy is expended mainly into heat, rock crushing and fracturing, seismic waves, air blast, and noise. Those parts of ene

    Jan 1, 1986

  • AUSIMM
    Continuous Assaying in a Copper/Lead/Zinc Mineral Flotation Pilot Plant Using In-Stream Analysis Instrumentation

    By Lovett EP, Johnson CR, Dunlop GA

    Seven streams of a low tonnage pilot plant operation on Cu/Pb/Zn ore from the Golden Grove Project were continuously assayed using an AMDEL In-Stream Analysis (ISA) system. The ISA instrumentation

    Jan 1, 1986

  • AUSIMM
    An Evaluation of Blast Performance at the Kidston Gold Mine

    By Paine G

    Kidston Gold Mines commenced mining in 1984 and currently mine approximately 10 million tonnes per annum of ore and waste using a conventional truck and shovel open pit method. The overall mine grade

    Jan 1, 1986

  • AUSIMM
    The Drilling and Evaluation of an Exploratory Oil Well

    By Hammett PHJ

    Oil Exploration Companies are primarily interested in how much oil or gas is present in the rocks in an area in which an exploratory well is drilled. The solution of this problem requires a combined

    Jan 1, 1964

  • AUSIMM
    Solvent Extraction at Rum Jungle

    Consideration was given to the.applicab on of a solvent extraction circuit to be'included in the process'for the-recovery of a high grade product from.:-the Rum Jungle Creek.South uranium or

    Jan 1, 1963

  • AUSIMM
    In-Situ Measurement of Thermal Diffusivity of Rock and Prediction Calculation of Transient Underground Climate

    By Biao Q, Mizuta Y

    Thermal constants such as thermal con- ductivity and thermal diffusivity of rock and coefficient of heat transfer of airway wall are the most important characteristic values which decide accuracy o

    Jan 1, 1988

  • AUSIMM
    Commissioning of the Bindura Pressure Leach Plant

    By Channon W, Dube M, Makwana M, Kerfoot D. G

    In early-1995, the Bindura Nickel Corporation commissioned a pressure leach plant at its Smelter and Refinery complex located in Bindura, Zimbabwe. The novel pressure leach process was developed by

    Jan 1, 1996

  • AUSIMM
    Environmental Assessment Of Derelict Mined Land, Emmaville, N.S.W.

    A survey of derelict and active alluvial tin and sapphire mines in the Emmaville area of northern N.S.W. as the first step in a pro- gramme of similar surveys to be undertaken throughout the State

    Jan 1, 1976

  • AUSIMM
    Small Pilot Plant Trials of Sirosmelt Copper Smelting

    By Grace NC, Lightfoot BW

    Small scale trials of the smelting of a copper concentrate in the Sirosmelt submerged lance reactor are described. Pellets of concentrate were dropped into the reactor while injecting air-rich mixt

    Jan 1, 1980

  • AUSIMM
    Fluid Flow in a Nickel Flash Smelter - A Simulations Study

    By Hall T. P, Taylor R. N

    Fluid flow in a 1:14 scale water model of the shaft and settler of the Kalgoorlie Nickel flash smelter has been investigated by flow visualisation and numerical modelling. Detailed flow fields throu

    Jan 1, 1992

  • AUSIMM
    The Team Approach to Client-Consultant Relations

    By Thompson IR

    This paper describes a Client Consultant Relationship and shows how an engineering team created an environ- ment which fosters the development of good, economical and sometimes unique solutions. A

    Jan 1, 1975