Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ensuring an Effective Principal Hazard Management Plan

    By A J. Clough

    There has been an unprecedented rise in the fatality rate in the Australian mining industry over the last few years. The factors behind this rise are not clear; however, it is noted that the increase

    Aug 31, 2015

  • AUSIMM
    Numerical Modelling of an Outokumpu Flotation Cell

    By K Koskinen, S Ronkainen

    The flow field induced in an Outokumpu TankCell and by an OK rotor-stator mixing device in a laboratory and a process size flotation cell was modelled numerically using computational fluid dynamics (C

    Jan 1, 2005

  • AUSIMM
    Investigation of the internal mechanical structure of Mars based on geometrical patterns of faults

    By Y Tsukurimichi, D Asahina, T Endo, T Takemura

    Scientific knowledge of Mars’ surface morphology and internal geological structure has been accumulated through satellite imagery and numerical topographic data using remote sensing technology, as wel

    Nov 29, 2022

  • AUSIMM
    Disposal of Run-Off Water by Land Application at Ranger Uranium Mine, Northern Territory: Geochemical and Radiological Considerations

    By Watters R

    Modem open cut and underground mining in the tropics inevitably expose partially weathered and unweathered rocks to oxygen and water, leading to weathering and the release of solutes and often acidi

    Jan 1, 1994

  • AUSIMM
    Physical modelling of tailings dam breach: exploring overtopping following shear failure

    By W A. Take, M McKellar, A Walsh, S McDougall, S G. Evans

    Recent tailings dam failures have heightened public awareness of the hazard posed by storage facilities for mining waste, illustrating the need for a more critical examination of tailings dam breach m

    Jul 1, 2021

  • AUSIMM
    Explosives in Underground Mining - The Light at the End of the Tunnel

    By MJ SMITH

    For the past 150 years, drilling and blasting has been an integral part of the underground mining industry in Australia. Ever since Busby's Bore was developed using black powder to supply Sydne

    Jan 1, 1992

  • AUSIMM
    Modelling Dynamic Fracture and Flow in Jointed Rock by Blasting

    By Y Wei, H-B Mnhlhaus

    Particles are by far the easiest objects to simulate, because their dynamics is simple. Determining the motion of particles and their interaction, a wide variety of deformable structures can be constr

    Jan 1, 1999

  • AUSIMM
    On the stability of CaS in liquid steel containing alumina or spinel inclusions

    By N N. Viswanathan, D Kumar, S Kumar

    In secondary steelmaking, calcium treatment is practised to modify the solid alumina or spinel inclusions into liquid or partially liquid calcium aluminates. It has been seen that the dissolved calciu

    Jun 19, 2024

  • AUSIMM
    Gold, Research and Development, and Exploration Success

    The link between exploration success and new ideas from research and development (R&D), although often assumed, is rarely well explained or well illustrated. One issue is understanding the role of inn

    Jan 1, 2007

  • AUSIMM
    Accurate Underground Wireless Ranging and Tracking

    By M Hedley

    Tracking plant and personnel in underground environments provides multiple potential benefits for a mine including increasing safety, better monitoring of production, traffic control, and in the futur

    Mar 21, 2011

  • AUSIMM
    Gas Discharge Modelling of a Bottom Blown Slag Melt

    By Das A. K

    Investigations were carried out to understand the effect of liquid viscosity (u = 1 x 10-3 - 5 x 10-' Ns/m2) on the size of primary bubbles formed at high gas injection rates (Q = 100 - 1000 c

    Jan 1, 1987

  • AUSIMM
    Exploration and Coal Resources of the Moreton Basin, Queensland

    The Jurassic Walloon Coal Measures crop out over much of the Moreton Basin and contain numerous thin, banded coal seams which have been mined at various locations since the 1870s. Historically most

    Jan 1, 1991

  • AUSIMM
    Geology of the Tavua Goldfield, Viti Levu, Fiji

    CONTENTSSummaryIntroductionGeographical and Geological Outline of the RegionGrowth of the Mining IndustryTable 1: Production StatisticsGeneral GeologyRecent Alluvium and River GravelsSambeto SeriesMud

    Jan 1, 1953

  • AUSIMM
    Quality Control Systems at BHP's Mount Whaleback Iron Ore Mine, Newman, Western Australia

    The Mount Whaleback iron ore deposit at Newman, Western Australia comprises the largest known continuous iron ore deposit in Australia, originally with a Measured Resource in excess of 1700 Mt of h

    Jan 1, 1997

  • AUSIMM
    The Kidston Gold Mine: A Development Challenge of a Low Grade Deposit

    The Kidston Gold Mine i s located in northern Queensland some 2 Ukm northwest of Townsville. I t is the largest gold mine in Australia and produces approximately 25 percent of Australia's gold an

    Jan 1, 1985

  • AUSIMM
    PGM and Nickel-Copper Mineralisation in the Hartley Complex Zimbabwe

    The Hartley layered mafic igneous complex within the Great Dyke of Zimbabwe contains economically-recoverable quantities of platinum group metals and gold, nickel, copper and cobalt. The recoverable

    Jan 1, 1996

  • AUSIMM
    Condition Monitoring at ERA - Ranger Mine

    By J A Evans

    A well-maintained and low cost mining operation today requires the use of condition monitoring techniques. At ERA - Ranger Mine oil analysis, vibration monitoring, infra-red themtography, and perfor

    Jan 1, 1994

  • AUSIMM
    Reconciliation at KCGM Fimiston Operation

    By T Berryman

    The Fimiston reserve is being depleted at the rate of one million ounces per year; most of which is processed by the Fimiston plant, with the remainder being stockpiled. As for most other large open c

    Jan 1, 2006

  • AUSIMM
    What Drilling Density is Optimal? ù A Case Study From the Golden Pig Mine

    By D Whitworth

    The Golden Pig mine has embarked on a diamond drill program design philosophy that increases flexibility of the program by greatly increased drill pattern densities. The use of standard broad pattern

    Jan 1, 2002

  • AUSIMM
    Challenges of Sampling Extreme Nugget-Effect Gold-Quartz Reefs at the New Bendigo Project, Central Victoria, Australia

    By M D. Raine, J K. Bartlett, S C. Dominy

    The Bendigo Goldfield is located in the state of Victoria, Australia, and is one of a number of fields that make up the Central Victorian Goldfield. Since 1993, Bendigo Mining NL has been carrying out

    Jan 1, 2003