Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    "Development of a Real-Time Fleet Cost Tool as Part of an Integrated Remote Mine Control Centre of an Integrated Remote Mine Control Centre"

    By S D. Dessureault

    In large coal strip mines, there are many different processes at work: stripping, overburden removal using trucks/shovels, cast blasting, slot dozer pushing, more fragmentation and further truck/shove

    Sep 26, 2011

  • AUSIMM
    Ore Selection to Maximise Value

    By J E. Everett

    Ore selection is generally a highly subjective task, with emphasis on producing product with a consistent target grade matching a perceived market requirement. A composite selection criterion ‘Comp’ (

    Jul 13, 2015

  • AUSIMM
    Production of Water-Soluble Phosphate Fertilizer from Christmas Island "C"-Grade Phosphate

    Christmas Island "C"-grade phosphate consists essentially of the minerals crandallite and millisite. Although containing over 25% P205, this material is not suitable for the manufacture of water-sol

    Jan 1, 1971

  • AUSIMM
    Parameter Determination of an Ignition and Growth Model from Emulsion Explosive Tests

    By D Johansson, C Yi, U Nyberg

    Emulsion explosives are a common industrial explosive and have a non-ideal detonation behaviour. The detonation performance for a given product changes with the charge diameter, ground conditions, con

    Aug 24, 2015

  • AUSIMM
    Solution and Precipitate Equilibria in Oleate-Alkaline Earth Cation Mineral Systems

    By R O. James

    The usual focus of papers on fatty acid collector action in non-sulfide flotation is on the adsorption of the carboxylate and/or neutral molecule species at the mineral-solution interface. Little atte

    Jan 1, 2005

  • AUSIMM
    The Trekelano Group of Mines - A Brief History

    The old Trekelano mining area is situated in the Cloncurry Gold and Mineral Field 14 km east-south-east of Duchess. It connected with the main Cloncurry-Dajarra railway line by a private line from Jue

    Jan 1, 1998

  • AUSIMM
    The Identification of Contaminants in Mine Site Waste Waters by ICP-MS

    By Mine F. J, Woods P. H

    Waste waters from mine sites may be screened for all constituents of significance as a first step in establishing water quality criteria for protection of aquatic ecosystems. Inductively-coupled pla

    Jan 1, 1994

  • AUSIMM
    Blasting a Cavern Using Bulk Emulsion Explosives

    The Elgas Underground Storage Facility at Port Botany, Sydney, is the first purpose-built cavern of its kind in Australia and allows large capacity, safe and environmentally benign storage of Liquefie

    Jan 1, 1999

  • AUSIMM
    Bioflotation of Sarcheshmeh Copper Sulfide Ore

    By Y S. M Tabatabaei, R Hosseini Tabata

    Application of Acidithiobacillus ferrooxidans bacteria to flotation of Sarcheshmeh low-grade copper sulfide ore was studied. Sarcheshmeh low-grade ore contains pyrite, which causes some problems in th

    Jan 1, 2004

  • AUSIMM
    Long Term Mine Planning at BHP Iron Ore Ltd's Mt Whaleback Mine

    By R D ROSENTHAL

    BHP Iron Ore Ltd's Mt Whaleback is the largest single open-pit iron ore mine in the Pilbara region of Northwestern Western Australia. A division of BHP Minerals, one of three core businesses o

    Jan 1, 1992

  • AUSIMM
    Direct Fuming of Zinc from Sulphide Concentrates

    By Iley J. D

    The production of zinc from low grade concentrates, particularly those high in iron, has a poor economic return due to a combination of higher concentrate transport costs, increased processing costs

    Jan 1, 1993

  • AUSIMM
    Capacity Evaluation of Iron Ore Processing Facilities Utilising Dynamic Simulations

    By N Steenkamp, L Furstenberg, W Cele, M Richter

    Managing productivity and improving efficiency for a healthy return on capital employed have become key mining industry strategies under prevailing tough global market conditions. However, achieving t

    Jul 13, 2015

  • AUSIMM
    Can a Risk-Based Evaluation Provide a More Valuable Mine Design?

    By B Maybee

    In underground mine planning, many potentially value-eroding decisions are made due to a lack of time and proper evaluation practices. The information required for mine planning decisions goes beyond

    May 24, 2012

  • AUSIMM
    Fluid flow in discontinuous porous media with special reference to block caving of mines

    By A Jafari, N Khalili, M Vahab, P Broumand

    This paper presents the implementation of the eXtended Finite Element Method (XFEM) in the general-purpose commercial software package COMSOL Multiphysics for multi-field thermo-hydromechanical proble

    Nov 29, 2022

  • AUSIMM
    The ground motions induced by blasting in open pit lignite mines and its environmental effects

    By O Aydan, R Ulusay

    Blasting is the most commonly used excavation technique in mining and civil engineering applications. Blasting induces strong ground motions and fracturing of rock mass in rock excavations. Particular

    Nov 30, 2018

  • AUSIMM
    Discovery of the Hamersley Iron Deposits (Duck Creek - Mt.Pyrton - Mt. Turner Area)

    By Burks WG, Hughes FE, Muceniekas E, Whitcher IG

    The area containing the iron field, recognised by the writers, is part of an uplifted, portion of the 'Western Australian Plateau,' ranging in elevation from about 1,000 feet to about 30

    Jan 1, 1964

  • AUSIMM
    Ventilation Design and Practice at the Olympic Dam Mine, South Australia

    By Clarke B. N

    The Olympic mine is currently and development to 1988. The mine practice is, and number of factors. Dam copper-uranium-gold undergoing construction start production in May ventilation design a

    Jan 1, 1988

  • AUSIMM
    Challenges within the minerals industry R&D landscape in Australia

    By P Revell, A Jenkin

    This paper presents an analysis of significant Australian-based R&D programs focussed on the minerals industry, which was commissioned by CRC ORE. The landscape analysis may assist organisations with

    Nov 10, 2020

  • AUSIMM
    The Use of Magnesium Oxide and Iron to Predict Host Units in Grade Control and Exploration at Bulong Nickel Operation

    At Bulong, the mineralised (>0.8 per cent nickel) ore exists within numerous lithologies, which can and do occur coincidently. It is very important to discriminate between the different host units for

    Jan 1, 2000

  • AUSIMM
    Supergene sulphide ore from the Mutooroo mine, South Australia: characterization and dissolution of copper

    By Davey P. T, Tsambourakis G

    Mineralogical analysis of supergene sulphide ore recovered from areas close to the underground workings at the abandoned Mutooroo (South Australia) mine shows that the original sulphide minerals have

    Jan 1, 1986