Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mount Isa Cut and Fill (MICAF) StopingABSTRACTMechanised cut and fill stoping in the Racecourse orebodies between II and 9 levels was started in 1964.Five stopes are in progress over the two level interval, extracting the full strike leng
Jan 1, 1968
-
Some Notes on Gold Milling Practice in BendigoThis paper endeavours to lay as concisely as possible, before the members the salient features of local gold milling practice, and to point out in what respects this practice differs from that of othe
Jan 1, 1902
-
Optimising Geotechnical Logging to Accurately Represent the Geotechnical EnvironmentTypically, large volumes of data are collected during geotechnical investigations for mining projects but rarely is this done in a comprehensive manner that enables all aspects of the geotechnical env
Nov 25, 2010
-
Possible Mechanisms for the Production of Foamed Blast Furnace SlagsSolid. dense, air-cooled slag can fulfil most, if not all, the functions of natural stone for civil engineering purposes. The value of pumice, also, has long been appreciated, and processes for the ma
Jan 1, 1963
-
Strong Acid Leaching and Filtration of Lead/Silver ResidueBy Adams R. W
A commercial scale strong acid leaching plant was commissioned at the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, a member of the Pasminco group of companies, in February
Jan 1, 1989
-
The 2,600 Feet Level Exploratory Drive North at North Broken Hill LimitedCONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill
Jan 1, 1946
-
Mount Angelo Copper Prospect, East Kimberleys, W.A.The Mount Angelo prospect outcrops as two copper rich gossans, the larger of which is 250 ft long and 70 ftwide. The mineralization is epigenetic and replaces part of a brecciated and disturbed lime t
Jan 1, 1966
-
Cyclone Process for Heavy Metals Decontamination of SedimentsCyclone Process for Heavy Metals Decontamination of Sediments
Sep 13, 2010
-
Metallurgical Practice in the Beach Sands IndustryThe history of the industry which recovers rutile and zircon from the heavy mineral beach sand deposits of Eastern Australia began with the initial discovery of zircon in 1895. Whereas a large number
Jan 1, 1963
-
The Importance of Sampling in the Mineral IndustryBy R J. Holmes
An accurate knowledge of the chemical, mineralogical and physical characteristics of ores and mineral products that are mined, processed and traded is crucial to effective resource utilisation, plant
Jul 15, 2013
-
Innovative Treatment of Gold Mine Water for Sustainable Benefit ù Processes and Case StudiesGold mines produce unique water treatment requirements. This paper focuses on case studies of innovative processes used for treatment of water resulting from gold mining and processing. The case studi
Jan 1, 2007
-
Intrusive rocks associated with Gold Mineralisation in Southeastern Papua New GuineaBy Clarke DS
The igneous intrusions in SE Papua New Guinea are part of a sub-volcanic to plutonic, high-K calc-alkaline to shoshonitic suite. High-K andesitic to dacitic intrusives on Misima and Woodlark Isla
Jan 1, 1991
-
Deep Well Pumping as an Aid To Shaft Sinking at Mount Isa Mines LimitedThe association of deep well turbine type pumps with metal mining is by no means a new one, though undoubtedly each application has certain features of interest, conformable with attendant circumstanc
Jan 1, 1939
-
-
Drilling and Blasting Cost EstimationDrilling and blasting are an essential part of most mining operations, and are commonly major operating cost centres. The effectiveness of blasting can have a significant influence on all subsequent
Jan 1, 1990
-
A mobile laboratory for nickel prospecting and drilling operationsThis paper describes a mobile laboratory developed specifically for nickel prospecting, and which was designed to be operated by sub-professional staff in remote areas independently of established lab
Jan 1, 1970
-
Study on Rational Process Flow Sheet for Beneficiating Low-Grade Cu, Mo, Bi, S, W Polymetallic OreStudy on Rational Process Flow Sheet for Beneficiating Low-Grade Cu, Mo, Bi, S, W Polymetallic Ore
Sep 13, 2010
-
Past and Future Parameters for Mining the Otago Alluvial Gold DepositsThe early records of hydraulic elevator and bucket ladder dredging in the Clutha River system indicate the success of that era of alluvial gold mining in Otago. This paper briefly reviews parameters o
Jan 1, 1992
-
The Flotation Capacity Project to Increase the Recovery in the Mount Isa Mines Copper ConcentratorBy D R. Carr
The installation of the Flotation Capacity Project flow sheet in the copper concentrator at Mount Isa Mines Limited has recently been completed. The project involved increasing the flotation capacity
Jan 1, 2003
-
The Influence of Feed Size Distribution on the Staged Flotation of Poorly Floating CoalsBy Nicol S. K, Swanson A. R
The poor flotation response of many coals has in the past been attributed to such factors as differences in rank, differences in degree of oxidation, differences in petrographic composition, or slime
Jan 1, 1978