Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Development of a KPI and Metallurgical Accounting Systems at Nabalco

    By J Barnes

    During September 2000, Nabalco management identified the need for a corporate system to deliver its key performance indicators (KPIs). In June 2001, a need was also identified to replace the existing

    Jan 1, 2002

  • AUSIMM
    Can a simple price-rise unlock complex copper orebodies?

    By R Valenta, J Owen, D Kemp, E Lebre, G Corder, J Thomas

    Numerous recent analyses have shown that future demand for a broad range of critical commodities is unlikely to be met by new discoveries and recycling alone. The only practical alternative source to

    Nov 21, 2018

  • AUSIMM
    Numerical Simulation of Chemical and Nuclear Contamination Transport in Aquifers and its Possible Application for the Control of Environmental Impacts due to Mining Activity

    The paper describes a simulating method.for ground water contamination originating from industrial and mining activrty. The finite difference model simulates heat, mass and solute transport. The ap

    Jan 1, 1988

  • AUSIMM
    The Design, Construction, Instrumentation and Performance of a Full-Scale Overburden Stockpile Trial for Mitigation of Acid Rock Drainage, Grasberg Mine, Papua Province, Indonesia

    By S Miller, A Neale

    As part of a long-term acid rock drainage (ARD) mitigation study, PT Freeport Indonesia has completed the construction of a highly instrumented, full-scale, experimental, overburden stockpile to furth

    Jan 1, 2003

  • AUSIMM
    Towards 40,000 Tonnes/Day Workings

    By Vidalinc, Raffoux

    Longwall faces producing in the order of 20,000 tons per day of raw coal are presently running in the Houilleres du Bassin de Lorraine of Charbonnages de France. Production levels of twice that l

    Jan 1, 1988

  • AUSIMM
    Geometallurgical Modelling - Quo Vadis?

    By W J. Shaw

    Geometallurgical modelling is now a hot topic in deposit evaluation and in optimising mine performance; however, its history is long and varied. Historically metallurgical sampling has frequently suff

    Jan 1, 2009

  • AUSIMM
    The Relationship Between Mineralisation and Depositional Environment in Early Proterozoic Metasediments of the Pine Creek Geosyncline

    Recent geological mapping has indicated changes to the stratigraphy of the Pine Creek Geosyncline. The new stratigraphy and interpreted depositional environments are examined in relation to the di

    Jan 1, 1984

  • AUSIMM
    Simulations of the Muyumkum Uranium Roll Front Deposit by Using Truncated Plurigaussian Method

    By H Beucher

    The uranium grade in roll front deposits is the result of successive processes that can be summarised in two steps. First a sedimentary phase, which gives the deposit support, then an oxidation-reduct

    Jan 1, 2006

  • AUSIMM
    Fluid-Dynamic Aspects in Blast Furnace with Gas Injection into the Stack

    By Quintiliani G, Giordano V

    A research field of interest and a topical subject with the aim to reduce a considerable amount of coke in ironmaking is the injection into blast furnace stack of hot reducing gas combined with use o

    Jan 1, 1975

  • AUSIMM
    Perimeter Control in Development Mining

    By A J. Tucker, L Bottomley

    The principle objective of development mining is to create thoroughfares that can be accessed by personnel and machinery for the entire life of an underground mine. The drill and blast process, being

    Jan 1, 2005

  • AUSIMM
    Simulation of the Competitive Effects of a Horizontal Merger in the Iron Ore Industry

    By L Wsrell

    During recent years the iron ore industry has experienced a continuous consolidation trend following increased merger and acquisition activities. Analysing and evaluating these mergers is important in

    Jan 1, 2005

  • AUSIMM
    The Geology of the Rum Jungle Uranium Deposits

    Three major and two minor uranium deposits 'have been worked by open out mining since the discovery of ,the Rum Jungle field in 1949. Total production has been about 9679000 tons of uranium ore

    Jan 1, 1968

  • AUSIMM
    Review of Mineral Exploration in South Australia

    Mineral exploration conducted over a wide area of the State during the period 1960 to 1973 has resulted in the discovery of a number of significant deposits. Base metals, particularly copper, have

    Jan 1, 1975

  • AUSIMM
    The Exposure of Mining Personnel to Ionising Radiations in Cornish Tin Mines

    South Crofty's ventilation network is large and complex. Of the total exhaust air quantity 40% enters the mine by leakage routes through old workings, this air carries high concentrations of

    Jan 1, 1988

  • AUSIMM
    Lower Levels Project Development at the C.S.A. Mine, Cobar

    By Grant BPM

    The lower levels at the CSA Mine have been developed to mine reserves between theNo.7 level and No.9 level.Work on major excavations for the project began during 1982 with the develop-ment of the crus

    Jan 1, 1985

  • AUSIMM
    The Rise And Fall Of Mt Keast-Locating Feed For Current Retreatment Operations From A Study Of Processing History At The Zinc Corporation, Limited

    In 1976, The Zinc Corporation Limited Broken Hill set up a plant to re-process a hill of tailing (Mt. Keast) from the original treatment operations. With the likely disappearance of this source of

    Jan 1, 1983

  • AUSIMM
    The Contribution of Research to Sustainability (With a Minerals Industry Perspective)

    Since the 1970s we have seen a marked corporate response in terms of the environment. In part this has come from regulation but it has largely come from stakeholders and the community. We now see a si

    Jan 1, 2004

  • AUSIMM
    Comparative performance of single and tandem stator arrangements in a one stage ventilation fan

    By G C. Snedden

    Tandem row stator arrangements are common in the last stage of multirow, gas turbine compressors. Tandem row stators, or stator and de-swirler vane combinations are used to relieve the loading on the

    Oct 12, 2022

  • AUSIMM
    Tunnelling in Unsolidified Water Bearing Sandstone-Construction of Tsugaru Tunnel (Futamata Construction Section)

    By Kaji S

    The Tsugaru Tunnel, located on the Honshu island approach to the Seikan Tunnel, is 5,880 m long and has a "Shinkansen" cross section of 90 m2 area. The geological formation through which the tunne

    Jan 1, 1987

  • AUSIMM
    Thiorea Leaching of a Refractory Gold Ore

    By Ciminelli VST

    Thiourea leaching has been applied to a refractory gold concentrate previously treated by bacterial oxidation. Following the bio-oxidation, gold has been leached in acidic thiourea solutions, under

    Jan 1, 1993