Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Development and Application of the Selective Zinc Precipitation Process for Controlling Impurities in Electrolytic Zinc Plant Circuits

    By Matthew I. G, Hall P. G

    The Selective Precipitation (Basics) Process is a means of controlling impurities such as the ions of Mn, Mg, and Cl as well as sulphate and water, in an electrolytic zinc plant circuit. This is a

    Jan 1, 1977

  • AUSIMM
    HellyerÆs Innovative Escapeway

    By Will D. P

    A 328 m, 2.4 m diameter raise-bored shaft has been equipped with a modular ladderway system to provide a second means of egress from Aberfoyle's Hellyer Mine in Tasmania. The modular ladderwa

    Jan 1, 1988

  • AUSIMM
    Drill Blast Versus Reverse Circulation Grade Control Sampling ù A Case Study From the Mt Muro Gold Silver Mine, Central Kalimantan, Indonesia

    Mt Muro was a gold and silver mine in Central Kalimantan on the Island of Borneo, Indonesia. Aurora Gold through its Indonesian subsidiary Indo Muro Kencana owned the project. Processing commenced in

    Jan 1, 2003

  • AUSIMM
    Lubrication Oil Refining

    Although a small quantity of lc,;v viscosity index ' (L.V.I.) oils are presently manufactured in. Australia, lubricating oil refining methods are assuming gxeater significance since in 1964 Austr

    Jan 1, 1962

  • AUSIMM
    Optimization of Bench blast Design with the Aid of Computer

    A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully- fractured zone, through a s

    Jan 1, 1992

  • AUSIMM
    Mine Owner and Explosives Supplier - Partners in Controlling the Environmental Effects of Blasting

    By Hagan T. N, Tucker A. J

    The Cumnock Open Cut Mine (COCM) is located in the Hunter coalfield in New South Wales. Five coal seams are being mined, mostly by drilling and blasting, loaders and excavators, and trucks. The ann

    Jan 1, 1995

  • AUSIMM
    Analysis of Transportation Systems in Polish Mining Industry

    By L Gladysiewicz

    This paper deals with the current situation in the mining industry in Poland. An overview of typical transport systems working in the different branches of mining is provided. The transport systems cu

    Jan 1, 2003

  • AUSIMM
    Milling Operations At New Broken Hill Consolidated Limited

    By Braes J. R, Neale J. R

    The New Broken Hill Consolidated Limited (NBHC) mine currently produces 1.42 million tonnes of silver, lead and zinc ore annually. All of this ore is treated by the NBHC milling ccx[plex. This pape

    Jan 1, 1983

  • AUSIMM
    Commissioning of Two 750 kW Centrifugal Fans at PT Freeport IndonesiaÆs Deep Ore Zone Mine

    By K Karmawan, T Casten

    The PT Freeport Indonesiaæs Deep Ore Zone (DOZ) copper deposit is located in the province of Irian-Jaya, Indonesia. Currently, a block cave mine is being developed around this deposit. Production is s

    Jan 1, 2000

  • AUSIMM
    Practical Aspects of Availability and Reliablity Management in a Large Open Pit Mine

    The large El Cerrejon coal open pit in north east Columbia has been developed over the last decade in a remote, entirely new mining area with hitherto unskilled inhabitants. Now over 200 pieces of hea

    Jan 1, 1991

  • AUSIMM
    Electrolytic Chlorine at Mount Morgan, Queensland

    As the Mount Morgan electrolytic chlorine plant is the first of its kind installed in Australia, and as the details of this method of producing chlorine have, up to the present time, been kept more or

    Jan 1, 1911

  • AUSIMM
    The Role Of The Geoligical Survey Of Queensland In Exploratory Coal Drilling

    The Coal Section of the Geological Survey of Queensland was formed in 1950 to plan and supervise systematic diamond drilling programmes to investigate the State's coal resources. For the first

    Jan 1, 1977

  • AUSIMM
    The Generation of Minimum Search Patterns in the Optimum Design of Open Pit Mines

    By Giannini L. M

    Optimisation techniques, based on the block model, for solving the optimum pit limit problem were discussed in an earlier paper. Of the available techniques the one based on graph theory proved to be

    Jan 1, 1988

  • AUSIMM
    The Application of High Resolution Seismic Profiling in the Preliminary Assessment of Lignite Resources, South Island, New Zealand

    High resolution seismic profiling has proved a cost effective tool for defining the structure and seam geometry of Late Cretaceous-Late Miocene age lignite deposits in the South Island of New Zealand

    Jan 1, 1989

  • AUSIMM
    The Goldamere Agreement ù A Co-operative Mutually Beneficial Environmental Management Framework for the Remediation of Acid Rock Drainage

    The Savage River open cut magnetite mine is located in rugged terrain in densely rain forested northwest Tasmania. The mine and concentrating plant are both in the Savage River valley. Pickand Mather

    Jan 1, 2003

  • AUSIMM
    Key Parameter Reporting System at Mt Newman Mining

    By Fink ST

    Management requires up-to-date information on the activities of an enterprise in order to maintain control and to assist in decision-making and planning. In today's environment it is essential

    Jan 1, 1983

  • AUSIMM
    Evaluating and Controlling Geological Risk

    The paper first outlines the conceptual basis for evaluating and controlling geological risk. Geological risk, the economic reflection of the uncertainties associated with tonnage, grade, and other

    Jan 1, 1994

  • AUSIMM
    Australian longwall ventilation systems

    By J Rowland, B Belle, M Webber

    The Australian underground coal industry has experienced substantial improvements in longwall productivity and, as such, the methods of providing a safe and productive mine environment have needed to

    Aug 28, 2017

  • AUSIMM
    Research and Application of Total Tailings Backfill at Zhangmatun Iron Mine

    By Wang Xia, Zhou Aiming, Shi Shengyi

    Zhangmatun Iron Mine is situated in the suburbs of Jinan city, Shandong, China. Because of surface environmental constraints, no suitable site can be selected to dispose of mill waste. The full mill t

    Jan 1, 1998

  • AUSIMM
    Drillling Patterns and Ore Reserve Assessments

    By Watson D. F

    Armstrong's (1983) criticisms of PhiIip and Watson's (1982b) note on optimal drilling patterns are based on misinterpretation, supported by errors in geometry. Furthermore, Armstrong argues

    Jan 1, 1984