A Decision-making Framework for Water Supply and Flood Protection Options in Net Present Value TermsBy H J. J Boshoff, A J. Karrasch
Mine planners frequently face the challenge of mitigating the impact of climatic events on mining operations, such as floods and droughts. Specific water management infrastructure can be implemented t
Jun 28, 2016
-
Development of Design Criteria for Upgradeable Friction HoistsFuture depth and production limitations of an ore hoisting system are fixed by its initial design criteria. There is little scope to extend these limitations once installation is completed. Depth and
Jan 1, 2005
-
Research and Its Application for Rehabilitation after MiningMy closest personal connection with the problems of rehabilitation comes from two years spent on a project at Weipa. At the beginning I am fairly certain that the engineers did not understand the me
Jan 1, 1971
-
Plant Design for the Whole of Project LifeThe complete life cycle of a production facility has many phases requiring many different skills and many different personalities. It is not unlike the life cycle of a person and many parallels can be
Jan 1, 2002
-
Designing of New Energy-Saving Cutting Drums of Longwall ShearersBy P Cheluszka, M Jaszczuk, P Sobota
This paper refers to a new idea of stereometry of cutting drums of longwall shearers designed to get medium and hard to mine coals. A new way to place picks on a drum enables to readjust a number of p
Jan 1, 2003
-
Radical involved reaction and weak magnetic effect between alumina refractory and high alumina slagsBy S H. Li, H Z. Gu, A Huang
High aluminium steel is a promising advanced steel known for its exception properties and holds significant economic and strategic importance. However, the CaO-Al2O3-SiO2 based slag with high alumina
Jun 19, 2024
-
A risk-based approach to drainage design standard selection for mine rehabilitation and relinquishmentBy A Densten, C Gimber
Surface water management and drainage is a key aspect of mine rehabilitation and closure planning. In the authors’ experience, drainage related problems are amongst the most common forms of failure in
Jul 25, 2018
-
Rock Cuttings for Railways-Construction Methods and GeologyRailway cuttings require the highest care in design and construction, as the pro- bability of failure concept does not allow any risks to be taken with hundreds of lives being dependent on continued
Jan 1, 1979
-
A Review Of Cementing Agents For Hydraulic FillThis paper carries on from an earlier paper 'Cemented fill practice and research at Mount Isa' and reports further on the laboratory programme at Mount Isa to develop a cheap cem- ented fi
Jan 1, 1973
-
Designing for Maximum Production from Trucks and LoadersIn many mining operations, the truck and loader equipment represents the bulk of the invested capital and the majority of the mine operating cost. The profitability of these mines is therefore crit
Jan 1, 1983
-
Solute Transport Studies for a Tailings Disposal SiteBy P H. Warton
It is proposed to construct a gold extraction plant at Matatoki, near Thanes. Ore to be processed at the mill will come from reopened and enlarged underground mines north of Thanes. The project has be
Jan 1, 1987
-
Pilot Tunnel and Blast Enlargement for Vibration ControlBy Lunardi P, Pelizza S
The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section
Jan 1, 1987
-
A Case For Coal Mining Research In AustraliaThe Bowen Basin coal field is an important energy resource. A relatively small proportion is avail- able by open cut operations. Responsible men throughout the world have warned of the need to incr
Jan 1, 1976
-
The Exploration for and Economic Appraisal of AsbestosAsbestos is a commercial term applied to fibrous varieties of several minerals, the properties of which are not generally appreciated by the majority of geologists. A thorough knowledge of these pro
Jan 1, 1971
-
Essentials for Estimating Ore Reserves in Alluvial DepositsThe grades of alluvial ore deposits are low compared with grades of hard rock mining. This factor, combined with other parameters of irregular distribution of particles, bedrock irregularities, siz
Jan 1, 1987
-
Ore Block Optimisation for Open Pit Grade ControlBy M B. McKevitt, W J. Shaw
The main task of grade control on a daily basis is to define the material that should be mined to a destination under various categories. This can be determined by grade, lithology, quality and blendi
Jan 1, 2009
-
Defining Residual Risk for Successful Mine Closure – a Geochemical PerspectiveBy T Baumgartl, B Noller, B Forsyth, J Park, M Edraki, P Pham
Understanding and quantifying residual risk is the key to the successful closure and rehabilitation of mines. An important aspect of residual risk is predicting the long-term chemistry of mine water a
Jun 28, 2016
-
Development of Methods for Use of Punched Cards in the Recording of Drill Logs in the Exploration for Brown CoalInformation from bores in the LatTobe Valley has been accumulating for over fifty years, and the manual extraction of details has become a limiting factor in their use.Punched card equipment, installe
Jan 1, 1960
-
A study of heat and material balances in direct reduction plant with various conditionsBy H Kim, M J. Sun
Global steel companies are actively combating climate change by reducing carbon emissions. Traditional steel production, using the blast furnace (BF) – basic oxygen furnace (BOF) process, heavily depe
Aug 21, 2024
-
Reassessing Rehabilitation Objectives and Targets for Mature Mining Operations in QueenslandBy T R. Anderson, A R. Butler
Haymont (2012) notes that in parts of Australia significant areas of mining disturbance cannot be relinquished. In Queensland it has been estimated that by 2010, just 0.3 per cent 507 ha of mining dis
Jun 28, 2016