Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Role of Chlorine in the Passivation of Preg Robbing Gold OresChlorination of organic matter by direct injection of chlorine gas or hypochlorite has been investigated metallurgically worldwide with little understanding of the basic chemistry of the passivation
Jan 1, 1991
-
Making use of potentially contaminating mine waste in cover designBy N Jamson, T K. Rohde
The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a
Jul 23, 2018
-
Mine reconciliation standardisation – R Factor SeriesBy R Hargreaves, T Elkington, W J. Shaw, G W. Booth
Every day, around the world, thousands of tons of ore are loaded onto ships completing the miningproduction process and starting a multimillion-dollar economic transactions process. These transactions
Mar 22, 2022
-
Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in BrisbaneBy A Purwodihardjo
Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t
Mar 8, 2011
-
Impact testing of raise bore protection meshBy M Doran
The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3
Mar 29, 2023
-
Automated Multi-Drills in Rio TintoBy C McHugh, F Oppolzer, B Rogers, A Stokes
Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation has more to do with improving the accuracy and consistency of mining pr
Sep 18, 2012
-
A new approach to implement quality assurance and quality control to technological innovations – quality of spectral data capture and processes in the minerals industryBy M Haest, O Dominguez, D Mittrup
Technological innovations and emerging analytical capabilities are transforming the way drill samples are analysed, with real-time mineralogical analysis made possible. In addition, new business/techn
May 9, 2017
-
Current Issues in the Mining Industry - From the Operational Mineral ProcessorÆs PerspectiveBy S Schwarz, D Alexander
The mining industry, and in fact the world, has undergone significant changes in the past five to ten years, ranging from the metals boom, the global financial crisis and the rise and fall of national
Oct 29, 2012
-
Learning to Love UncertaintyExploring long-term future possibilities for your business and methods for achieving them are critical functions of leadership. More than ever, strategic initiatives today have to be planned and deliv
Jan 1, 2006
-
Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald RiverBy J Player, R de Vries, J F. Carswell, R Hassell
"The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development
Oct 16, 2017
-
Durability Planning for Underground InfrastructureBy D Wimpenny
Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur
Mar 8, 2011
-
The critical role of mine planners in the evolution of closure at BHPBy J Heyes, R Getty, M Sanapala
Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti
Sep 18, 2023
-
The Development and Operation of a Continuous Tapping Lead Blast Furnace at Port PirieOn the 17th November, 1964, a new No., 2 lead blast furnace was blown in at Port Pirie. The furnace departed from previous designs by incorporating a centrally located continuous tapper for both l
Jan 1, 1975
-
How Much Do We Need to Drill?By C Taylor, E Retz
Sequential Gaussian conditional simulation of wide-spaced exploration data has been completed in order to optimise a drilling grid at Fortescue’s Eliwana deposit. The aim of this drill grid is to impr
Jul 13, 2015
-
"A Geometallurgical Proxy for Nickel Laterite Heap Leaching"By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman
"Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long
Jun 15, 2016
-
The Use of Gravity as an Exploration Tool for the Robertson Range and Davidson Creek Iron Ore Deposits, East PilbaraBy R McCarthy, P Darvall
FerrAus Limited's Robertson Range and Davidson Creek iron ore projects are located on the far eastern margin of the Hamersley Province, approximately 100 km to the east of Newman, Western Austral
Jan 1, 2009
-
Gas Evolution Trends for Coal from Two Different Areas at Clarence CollieryBy J Sargeant, T Levi, J Theiler, B Beamish
Two coal samples (810 Panel and Area 900) collected from Clarence Colliery have been tested under a controlled heating procedure to evaluate the gas evolution trends corresponding to increasing temper
Aug 31, 2015
-
Three-Dimensional Geometallurgical Data Integration for Predicting Concentrate Quality and Tailings Composition in a Massive Sulfide DepositBy R Knight
The spatial variability of geometallurgical characteristics in a mineral deposit can have significant impact on financial and mine planning, mineral processing, concentrate quality and tailings compos
Sep 5, 2011
-
Application of a reinforcement learning AI solution for optimisation of screening shuttles controlBy A Horeth, E Duggan, B Versiani, A Gooch
Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati
Nov 8, 2021
-
Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame ThemBy J Paradis, K Dudgeon, M Topping
At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon
Aug 18, 2014