Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USA

    By S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick

    Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir

    Nov 4, 2015

  • AUSIMM
    Developments in Steel Recycling Technology

    By Y Pan

    The recycling of steel is a crucial aspect of the shift toward a sustainable metals industry. The emphasis on steel recycling through the introduction of the scrap based mini-mill concept is also matc

    Jan 1, 2004

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018

  • AUSIMM
    Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

    By M G. Millad, M Zammit

    The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa

    Aug 18, 2014

  • AUSIMM
    Improved hydration management on Australian mine sites with the MX3 hydration testing system

    By T Kilpatrick

    Managing heat stress on Australian mine sites is a complex and enduring challenge due to the combined and variable contribution of environmental conditions, physical activities, and protective equipme

    May 5, 2022

  • AUSIMM
    Recovery-by-size Kinetic Analysis to Determine Where Metallurgical Improvements Occur When Converting to High-chrome Grinding Media

    By C J. Greet, S Jacques

    In most instances, the application of high-chrome grinding media results in an increase in the recovery of the valuable mineral(s). The authors have published data from a number of plant-based case st

    Sep 1, 2014

  • AUSIMM
    The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western Australia

    By J Lea, D C. Kettlewell

    The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst

    Jan 1, 2009

  • AUSIMM
    Preparation of a JORC Code Compliant Resource Statement Based on an Evaluation of Historical Data – A Case Study from the Panguna Deposit, Bougainville, Papua New Guinea

    By P Collier

    From 1972 until 1989 when operations were suspended Bougainville Copper Limited (BCL, owned 53.58 per cent by Rio Tinto Limited) operated a large open pit mine and processing facility at Panguna on Bo

    Aug 22, 2011

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    Conducting comprehensive evaluations of preconcentration options

    By P Holtham, K Duffy, B, W Valery, E Tabosa, rade

    Pre-concentration has potential to significantly improve Mineral Resource efficiency by removing gangue early in the process, before energy intensive and expensive comminution and fine processing. How

    Nov 10, 2020

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    "Development of a Synthetic Ore Deposit Model for Geometallurgy"

    By V Lishchuk, C Lund

    "Geometallurgy aims to improve resource efficiency by creating a spatial model of an orebody in order to forecast ore processing behaviour. This enables calculation of the economic value of each ore b

    Jun 15, 2016

  • AUSIMM
    The Case for an International Mining Law

    State ownership of minerals results in domestic legislation regulating mining operations. The mining industry today is dominated by a number of transnational companies, each subject to internal and ex

    Jan 1, 2004

  • AUSIMM
    Characterisation of Gold Ore from the Nick O’Time Shoot (Tarnagulla, Australia) Using High Resolution X-ray Computed Tomography

    By I M. Platten, Y Xie, B W. Cuffley, S C. Dominy

    "Geometallurgical programs require the collection of representative samples for geochemical, mineralogical and metallurgical test work. Such protocols must be designed to suit the style of orebody in

    Jun 15, 2016

  • AUSIMM
    Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South Australia

    By A Querzoli, B Williams

    In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann

    Jul 25, 2018

  • AUSIMM
    Exploration and Mining Unified through Seismic Imaging

    By J Dwyer, G Turner, D Pridmore, M Urosevic

    Due to their ability to produce high-resolution images of the subsurface to great depths, seismic surveys provide critical inputs to almost all oil and gas exploration projects. However, with some not

    Nov 4, 2015

  • AUSIMM
    The Influence of Liner Wear on Milling Efficiency

    By P Toor

    Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in

    Aug 8, 2011

  • AUSIMM
    ‘MRC-wiki’ – a Mine Rehabilitation and Closure Knowledge Management Tool for Central Queensland Coalmine Practitioners

    By C J. Unger, T Baumgartl, C J. Bond, P Sabourenkov, V C. Glenn

    Social licence to mine is influenced by society’s perception of the mining sector’s ability to effectively rehabilitate mined land and for governments to appropriately regulate that process for the br

    Jun 28, 2016

  • AUSIMM
    Challenges and Opportunities in the Development of a Cultural Heritage Management Strategy at the Lihir Gold Mine, Papua New Guinea

    By J Cook

    In this paper we present a case study of the challenges and opportunities associated with the development of cultural heritage management strategies at the Lihir gold mine in Papua New Guinea. We disc

    Jan 1, 2009