Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ore characteristics that Affect Breakage and Mineral Liberation during Grinding

    By W. Petruk

    A study was undertaken to determine whether interrelations between mineral grains affect ore breakage during grinding, and to establish a correlation between ore breakage and mineral liberation. A bas

    Jan 1, 1988

  • CIM
    Improved pellet reducibility by closing grinding circuits with hydro classifiers at QCM's Pellet Plant (a963ef26-a855-4c7b-8f4c-3961a4652f30)

    By Colleagues from Process and Operation departments, Guy Chevalier

    "QCM's pellet plant, located in Port-Cartier, Quebec, produces up to 8.6 million tons of iron ore pellets annually. Four different types are produced: three for blast furnace operations and one for di

    Jan 1, 2002

  • CIM
    Development of New Laboratory-Scale Tests to Optimize Industrial Thermo-Mechanical Processing of Thick Plate Products: Application to Alculi Alloys

    By Jean-Christophe Ehrström, Fanny Mas

    "A specific test set-up has been developed to study at the lab-scale the high-temperature behavior of aluminium alloys in conditions close to those experienced by thick plates during hot-rolling. A pa

    Jan 1, 2018

  • CIM
    The Pacific perspective: coal development in British Columbia, 1981-2000

    By John Clancy, Andrew J. Freyman

    "Trends in world coal markets indicate that the next twenty years could be a period of intensive development for British Columbia's coal resource. This paper examines demand projections for metal

    Jan 1, 1982

  • CIM
    Substrate Effect on The Structural And Electrochemical Properties Of Electrolytic Manganese Dioxide Deposited From Sulphate Solutions

    By B. K. Mishra, Avijit Biswal, B. C. Tripathy, Abhijeet Singh, K. Sanjay, T. Subbaiah

    We studied theeffect of anode substrates such as pure lead (Pb), lead antimony (Pb-Sb), and lead-silver (Pb-Ag) on the structural and electrochemical properties of electrolytic manganese dioxide (EMD)

    Jan 1, 2014

  • CIM
    Recycling of Metal-Coated Plastic-Parts from End-Of-Life-Vehicles with Biotechnological Methods

    By F. Logsch, H. Pempel, J. Markowski, P. Ay

    "Due to the European Directive 2000/53/EC on end-of-life-vehicles, from 2015 on more than 95% of car materials have to be recycled. In order to recycle the materials back into the economic cycle, it i

    Jan 1, 2016

  • CIM
    Commissioning of a Mini REE SX Pilot Plant at SGS Minerals – Lakefield Site

    By Niels Verbaan, Ernesto Bourricaudy, Ronald Molnar, James Brown, Sunil Jayasekera

    "SGS Minerals commissioned an internal R&D program to develop in-house expertise to design, set up and operate REE separation pilot campaigns at its Lakefield, Canada site. A team approach was used th

    Jan 1, 2016

  • CIM
    Three Dimensional Numerical Modelling of Joint Spacing and Orientation Effects on Rock Cutting Process by a Single TBM Cutter

    By A. A. Iranzadeh

    The performance of a tunnel boring machine (TBM) depends on the efficiency of the cutters, which can be influenced by geological conditions and rock mass properties. In this study, a three-dimensional

    Jan 1, 2009

  • CIM
    A Kinetic Model for Dynamic Recrystallization in Austenitic Stainless and Hypereutectoid Steels

    By J. J. Jonas, G. R. Stewart, A. M. Elwazri

    Two important parameters for dynamic recrystallization can be derived from the changes in the strain hardening rate: the critical strain for initiation of dynamic recrystallization and the point of ma

    Jan 1, 2004

  • CIM
    Design, development, and verfication of a Lovat 7.6-metre full-face tunnel-boring machine

    By R. Lovat, J. A. Hunter

    "The design, development, and verification of the Lovat 7.6metre diameter full-face tunnel-boring machine is reviewed. Programmatic and technical challenges are outlined with a review of the specifica

    Jan 1, 1984

  • CIM
    Shaft Sinking at Falconbridge

    By E. N. Gilje

    "IntroductionDURING the past five years, over two miles of shaft sinking have been completed at Falconbridge. As sinking has continued, we have improved our equipment and technique with a resulting in

    Jan 1, 1955

  • CIM
    Global Requisitioning Suite (GRS) Completing the Requisitioning Cycle

    By Kevin Bell

    About Beltek Inc. For more than a decade Beltek, Inc. has been working with national and international organizations to harness and deliver solutions which gain real ebusiness advantages in today&apos

    May 1, 2004

  • CIM
    The Superior Province

    By H. D. B. Wilson

    THIS PAPER has resulted from a preliminary draft of a background paper prepared anonymously for the Science Council's Special Study of the Solid-Earth Sciences in Canada. The draft was circulated to e

    Jan 1, 1970

  • CIM
    Replacement Hematite Deposits, Steep Rock Lake, Ontario

    By Hugh M. Roberts

    DEVELOPMENT at Steep Rock lake has given rise to renewed interest in the geology of the iron ore deposits in the Lake Superior Region and has implications of no small moment bearing upon methods of ex

    Jan 1, 1943

  • CIM
    Development, Testing and Applications of an Induction-Balance Sensor for Low-Grade Nickel Ores

    By D. J. Houlahan

    ABSTRACT Sorting has the potential to massively improve the pro?tability of mining base metal, hard-rock ores. However, several barriers to the increased application of sorting have been identi?ed, in

    Jan 1, 2010

  • CIM
    The Anode Department of the Noranda Smelter

    By W. B. Boggs

    Part 1 Originally, the copper produced at the Noranda ?smelter was shipped in the form of blister bars to the Laurel Hill refinery of the Nichols Copper Co., New York. In 1930 a refinery was built at

    Jan 1, 1932

  • CIM
    The Heavy Oil Situation in Western Canada

    By J. C. Gilbert

    "IntroductionTHE PURPOSE of this paper is to discuss in a general way the heavy oil situation in Western Canada, and particularly to acquaint those in the oil industry who have not participated in the

    Jan 1, 1952

  • CIM
    Electromagnetic refinement of the 319 aluminum casting structure

    By F. C. Robles Hernandez

    This paper presents the results of the electromagnetic semi-solid treatment of the 319 aluminum foundry alloy, Various levels of structure modification were achieved controlling the AC current used to

    Jan 1, 2004

  • CIM
    An Overview of the Fe oxide-Cu-Au Deposits and Related Deposit Types

    By Sunil S. Gandhi

    Magmatic-hydrothermal deposits rich in magnetite and/or hematite form a broad group that includes monometallic Fe deposits and polymetallic (mainly Cu and Au) deposits. They show a considerable variat

    May 1, 2003

  • CIM
    A New Approach to Identify Crack Initiation Stress of Crystalline Rocks Under Uniaxial Compression Condition

    By X. G. Zhao, M. Cai, L. K. Ma, P. F. Li

    "Crack initiation stress is one of the characteristic stress thresholds in the rock deformation process under compression. By analyzing AE responses of brittle rocks in uniaxial compression, a new met

    Jan 1, 2015