Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Simulation of the Mineralogical and Chemical Aspects of Heap and Dump Leaching as an Aid to Ore-Process Evaluation

    By Box JC

    A comprehensive computer simulation has been developed for heap and dump leaching processes. It deals with complex chemical interactions, involving several minerals and reagents, which vary with t

    Jan 1, 1983

  • AUSIMM
    The New Iron and Steelmaking Process at New Zealand Steel

    This paper describes the new iron and steelmaking process recently commissioned at NZ Steel. Ironsand mined and concentrated at Waikato North head is slurry pumped 18 km to the company's Glenbroo

    Jan 1, 1986

  • AUSIMM
    Development of Sampling and Assaying Protocols at the New Bendigo Gold Project, Victoria, Australia

    By S C. Dominy

    The Bendigo Goldfield is located in the state of Victoria, Australia, and is one of a number of quartz-reef fields that make up the greater Central Victorian Goldfield. At Bendigo gold particles are c

    Jan 1, 2005

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • AUSIMM
    Abra, A Middle Proterozoic Mineralized Body, Western Australia

    The Abra mineralized body is regarded as a significant new style of mineralization for its environment. It is a blind polymetallic deposit, located in the Bangemall Basin of Western Australia. It was

    Jan 1, 1987

  • AUSIMM
    Paleomagnetic Constraints on Terrane Tectonic in New Guinea

    By Davies H, Pigram C, Sunata W, Falvey D, Loxton C, Giddings J, Rogerson R

    PALAEOMAGNETIC CONSTRAINTS ON TERRANE TECTONICS IN NEW GUINEA Chris Klootwijkl), John Giddingsl), Wahyu Sunata2), Chris Pigraml), Charles Loxton3), Hugh Daviesl), Rick Rogerson3) and David Falveyl) 1

    Jan 1, 1987

  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    The Douglas Project Strandline Systems, Wimmera Region, Western Victoria

    By D Judkins N OÆLoughlin

    "Basin Minerals Limited commenced exploring for conventional strandline hosted mineral sands (rutile, ilmenite and zircon) deposits in the Murray Basin in April 1997. This has resulted in the discover

    Jan 1, 2001

  • AUSIMM
    HoistEM ù A New Airborne Electromagnetic System

    HoistEM is a helicopter-towed time domain electromagnetic system. This paper presents details of the towed array structure (the Hoist) as well as a description of the instrumentation. A comparison bet

    Jan 1, 2004

  • AUSIMM
    Evaluation of rock joint on construction tunnel face using convolutional neural network

    By H Kusumi, A Nishio, K D. Halim, Y Yun

    In Japan, evaluation of rock mass is crucial in mountain tunnels that are constructed using the NATM (New Austrian Tunneling Method) to determine the support pattern that in turns determine the final

    Nov 29, 2022

  • AUSIMM
    Industrial Scale Results from Shear Enhanced Thickening Technology

    By I Arburthnot, N Lawler, C Loan

    The function of a thickener is to optimise and accelerate the process of gravity sedimentation. The desired end product (be that maximised concentrated solids or clarified liquid) determines how the t

    Oct 29, 2012

  • AUSIMM
    Pillar Design in Bump-Prone Deep Western U.S. Coal Mines

    By Kneisley RO

    This paper presents a brief overview of current bump mechanics theories and pillar design methodologies, and relates these concepts to experiences at two mines located in a north- central Utah coal

    Jan 1, 1992

  • AUSIMM
    Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York City

    By A Fareth

    Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri

    Jan 1, 2008

  • AUSIMM
    Advances in Theory and Application of Non-Electric Initiation Systems to 60 Series Extraction at the Mount Lyell Copper Mine

    By Duniam P

    Sequencing of large underground firings is a critical aspect of blast performance. Using theory developed in open cut operations, where blast results are easier to quantify, a new technique for sequ

    Jan 1, 1995

  • AUSIMM
    Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?

    By Williams P. A

    Tailings dams constructed by the upstream method have traditionally been built using the sand fraction of the tailings, which has automatically provided a relatively permeable embankment material, and

    Jan 1, 1992

  • AUSIMM
    Excavating a Tunnel in the Foothills of the Southern Alps of New Zealand

    By E Giles

    Pike River Coal Limited (PRCL) is opening a new underground coal mine in the Paparoa Ranges north-east of Greymouth. To access the coal reserves, PRCL have had to build a 13 km access road through reg

    Jan 1, 2008

  • AUSIMM
    Possible Impact of New Safety Technology Developments on the Future of the United States Mining Industry

    The future of the United States (US) mining industry will be affected greatly by recent coal mining disasters. These have resulted in new legislation which will have an impact on mining economic costs

    Jan 1, 2008

  • AUSIMM
    Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine Closure

    By S Jahn, M Noel, E M. Rykaart, M Pau

    Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m

    Jan 1, 2003

  • AUSIMM
    The Use of a Colour Parameter in a Machine Vision System, SmartFroth, to Evaluate Copper Flotation Performance at Rio TintoÆs Kennecott Utah Copper Concentrator

    By G Forbes, D J. Bradshaw, G S. Heinrich, D

    Traditionally, operators on mineral flotation plants have relied on visual inspection of the froth surface when making adjustments to process set-points. Machine vision systems are being developed to

    Jan 1, 2005