Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Fly-In, Fly-Out Operations ù Strategies for Managing Employee Well-BeingBy J Sibbel, K Goh
A key issue facing mine managers in remote locations in Australia and overseas is that of managing a fly-in, fly-out (FIFO) workforce. Current Australian research (Sibbel, in prep) indicates that FIFO
Jan 1, 2006
-
Ensuring Professional Engineering Capability - Queensland Professional Engineers Act 2002The provision of professional engineering services in Queensland is regulated through the Professional Engineers Act 2002. The Act requires that anyone providing professional engineering services must
May 1, 2010
-
Investigations on the Martha Hill Gold ProspectMining at Waihi on the Martha Hill commenced in 1878 and between 1892 and 1953 produced 35 million ounces of bullion from some 13.5 million short tons of ore from 40 named quartz reefs. The general g
Jan 1, 1979
-
Coal: Development of Nsw's Major Energy ResourceThe Energy Authority of NSW has wide powers and responsibilities conferred by its Act which are pertinent to the State's coal industry and its development into the next century. With respect
Jan 1, 1987
-
Coalmine ventilation – examining the past, looking to the futureBy J M. Galvin
History attests to the catastrophic consequences that fire, explosion and contaminated, noxious andirrespirable atmospheres can have for workplace health and safety in underground coal mining. It also
Oct 12, 2022
-
Tunnel Boring Machine Usage Speeds up Development at Stillwater MineBy D Willis, A Shanahan, C Jacobs, T Luxner
The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin
Sep 17, 2014
-
Calibrating Comminution Models Using Operating Data to Forecast and Optimise Plant PerformanceBy A L. Zawadski, B G. Putland
"This paper discusses a method to build a calibrated comminution circuit model, using historic operating data and blend information that is useful for forecasting and optimising plant performance, as
Oct 10, 2016
-
Lead Removal from Contaminated Soils with Chelating AgentsLead Removal from Contaminated Soils with Chelating Agents
Sep 13, 2010
-
Commissioning of the Barrytown Ilmenite Pilot PlantBy T Wootton
The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced
Jan 1, 1990
-
Flotation of Hematite Using Oleates as CollectorsLaboratory scale flotation tests were done on mineral hematite and aspecular hematite ore using oleic acid and sodium oleate as collectors. The mineral hematite floated strongly in the neutral pH regi
Jan 1, 1999
-
A Structural Framework for the Otago Gold-Quartz Lodes Involving Flexing of a Metamorphic CarapaceAny hypothesis for the origin of the Otago gold-quartz lodes must account for the following observations. 1. Southeast of Glenorchy, where the schists hosting the lodes are comparatively unaffected b
Jan 1, 1992
-
The Planning of Pre-Commitment Phase Geotechnical Investigation in the Lochiel Coal, South AustraliaGeotechnical conditions in the Lochiel Deposit are somewhat unusual, and thus geotechnical and hydrological investigations have assumed a high priority. The cost of mining the deposit has been sho
Jan 1, 1986
-
Reason Analysis of Impurity Containing and Technology Discussion of Quality Improvement for Low-Quality Iron ConcentrateReason Analysis of Impurity Containing and Technology Discussion of Quality Improvement for Low-Quality Iron Concentrate
Sep 13, 2010
-
Incorporating Economic Risk in Pit Slope DesignsAdvances in technology have led to larger and deeper open pit mines and, consequently, also increased the potential economic impact associated with slope failures. If the ultimate aim of mining operat
May 1, 2010
-
Project Sustainability Assessment - Matching Method to Enterprise SizeProject Sustainability Assessment - Matching Method to Enterprise Size Sustainable development requires managing natural resources, including minerals, in a way that is conducive to long-term wealth
Sep 13, 2010
-
Copper Skarn Deposits in Eastern ChinaIn eastern China, most of the copper skarn deposits occur in folded troughs which are controlled by the EW-trending faulted fold systems (the Pal-Asian geotectonic domain), and the NNE-trending rift o
Jan 1, 1995
-
Correlation of Air Recovery with Thin Film and Froth Stability in FlotationCorrelation of Air Recovery with Thin Film and Froth Stability in Flotation
Sep 13, 2010
-
Equipment Selection - What is the Issue? What About the Application of Simulation Packages?The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t
Dec 6, 2010
-
Particle Size Measurement of TiO2 Nanoparticles in Non-Aqueous Solvent by Interactive Force Apparatus Under an Electric FieldParticle Size Measurement of TiO2 Nanoparticles in Non-Aqueous Solvent by Interactive Force Apparatus Under an Electric Field
Sep 13, 2010
-
Improving the Sustainability of Primary Metal Production - The Need for a Life Cycle ApproachImproving the Sustainability of Primary Metal Production - The Need for a Life Cycle Approach
Sep 13, 2010