Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
East Side Access - Segmental Lining Design Challenges for Closely Spaced and Shallow TunnelsBy D. I. Smith
Constructing tunnels in congested urban areas requires tunnels to be placed closer together and with less cover than was previously necessary. Contract CQ031 of New York?s East Side Access project wil
Jan 1, 2008
-
Presplitting and Controlled Blasting TechniquesThe objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.
Jan 1, 1990
-
Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive SoilsBy Mohammed Sakr
This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.
Jan 1, 2012
-
OFR-35-88 Prediction Of Incipient Electrical-Component FailuresBy Jeffery L. Kohler
This final report on Bureau of Mines Contract J0338028 presents the results of a research effort to predict incipient failure in electric-power-system components. The development of continuous monitor
Jan 1, 1987
-
RI 8383 Relationship of Mineralogical and Chemical Composition of Refractory Periclases to Modulus of Rupture at 1,500° to 1,600° CBy J. T. McLendon
As part of its research project in developing improved refractory materials for metallurgical applications, the Federal Bureau of Mines obtained hot modulus of rupture data at 1,500°,1,550°, and 1,600
Jan 1, 1979
-
Macraes New Zealand Success StoryWho Macraes Mining Company Limited is can be summed up by the following statements: + We have been New Zealand's largest gold producer for seven ye
Jan 1, 1997
-
Alluvial gold dredging: a case study of effects on groundwater turbidityBy H. R. Thorpe
A floating gold dredge operating in coarse alluvial gravels of the Grey River on the west coast of the South Island, New Zealand, generated high concentrations of clay and colloidal particles in the d
Jun 19, 1905
-
Islais Creek Contract E: Tunneling Through Jet Grouted Bay MudBy D. N. Adams, M. M. Wong, M. J. Robison
Islais Creek Contract E, a transport/storage tunnel in San Francisco, was visited on a fieldtrip during construction by delegates to the 1995 RETC. This paper is a follow-up to that fieldtrip. The p
Jan 1, 1997
-
IC 7146 Pulmonary Diseases In The Mining IndustryBy R. R. Sayers
Although the attention of those interested in diseases peculiar to mining as teen focused recently on one duct disease - silicosis - other respiratory diseases may cause more suffering and economic lo
Jan 1, 1941
-
Dorr-Oliver Application Driven Design of Flotation CellsBy Kallioinen Jouko
"Advanced Flotation Technology is the application driven design of Don-Oliver flotation cells to achieve the optimum performance for each type and grind of flotation. Optimum performance is the combin
Jan 1, 2000
-
New Pillar Strength Formula For South African CoalBy J. N. Van der Merwe
The data base of failed pillar cases as used by Salamon and Munro (1967) in their original analysis to determine the strength of coal pillars empirically, has been updated for this study. It is shown
Jan 1, 2003
-
OFR-77-79 Methods And Materials For High-Modulus Fills In Underground MinesBy Koehler Stout
Many hydraulic backfills are deposited at low density and provide less than optimum support strength to stope walls. This laboratory study shove that fill strength can be considerably increased. Place
Jan 1, 1979
-
Meeting the Challenges and Risks for Tunneling Under San Diego State UniversityBy Dave Ragland
The SDSU tunnel and underground station are the first of these type facilities to be constructed by the Metropolitan Transit Development Board. Because there is no previous experience, and because tun
Jan 1, 2001
-
Effects of drum vibration on performance of coal shearersBy B. Tiryaki, O. Z. Hekimoglu
Shearer drums are a critical component in the overall performance of coal shearers, with the cutting performance depending very much on the disposition of cutter tools on the drums (the tool-lacing ar
Jun 19, 1905
-
Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And Strata Measurements Of Yield And Abutment PillarsBy J. Brasfield
Jim Walter Resources, along with the Rock Mechanics Branch of British Coal and Strata Control Technology Pty. Ltd., is presently studying the yield-stable-yield pillar design in use at the Blue Creek
Jan 1, 1994
-
Post-coal Transition In Germany And The Un Sustainability Goals - SME Annual Meeting 2022By J. Kretschmann, N. M. Smith, J. F. Brune, P. Goerke-Mallet
Coal production and coal use for electric power generation are diminishing worldwide. Germany will phase out lignite mining as well as lignite and hard coal-powered electricity generation by 2038. In
Mar 2, 2022
-
Study on Mineral Processing of Refractory Copper-Nickel OreStudy on Mineral Processing of Refractory Copper-Nickel Ore
Sep 13, 2010
-
Social and Economic Aspects of Reducing Mercury Pollution in Artisanal Gold MiningBy Simon D. Handelsman
?Artisanalmining ?Application of human energy (e.g. pick & shovel) directly to produce minerals ?majority no technical skills and lack adequate working tools ?Small-scale mining ?Application of mo
May 1, 2006
-
OFR-61(5)-78 Coal Mine Electrical System Evaluation - Volume V - Battery And Battery-Charging SafetyBy Lloyd A. Morley
The primary goal of this research report is to discuss safety considerations involved in the use of lead-acid batteries for traction purposes in underground coal mines. In order to arrive at the o
Jan 1, 1977
-
RI 3499 Combustibility Of Coke In Air - A Laboratory MethodBy R. E. Zane
[The Northwest Experiment Station of the Bureau of lines, in cooperation with the College of Mines, University of Washington, has completed a detailed investigation of the physical and chemical proper
Jan 1, 1940