Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
OFR-58-85 A Pilot Program For Underground Mine Rescue And Emergency Program Utilizing Cooperative ResourcesBy James H. McCutchan
The small and remote mine operators must comply with the Federal Mine Safety and Health Administration regulation requiring them to train and maintain mine rescue teams. The alternative is for the ope
Jan 1, 1984
-
Digital Assessment of Northern and Central Appalachian Basin CoalsBy Leslie F. Ruppert
The US Geological Survey (USGS) is currently conducting a coal resource assessment of the coalbeds and zones that are projected to provide the bulk of the nation’s resources for the next few decades.
Jan 1, 1999
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic TestBy Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
The Improvements To Copper Casting Machine For FerroalloysBy A. More, J. M. Míguez, J. Bullón
In 2000 Ferroatlantica started a project with the aim to develop a new casting machine for silicon and other ferroalloys. Until now, it has been cast more than 25.000 tons of silicon for the chemical
Jan 1, 2007
-
RI 2256 Notes On The Oil-Shale Industry With Particular Reference To The Rocky Mountain District ? IntroductionBy M. J. Gavin
Within the past three years numerous inquiries for information on oil shale have been received by the Bureau of Manes. These inquiries have been increasing to such an extent that it has seemed advisab
Jan 1, 1921
-
Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, TasmaniaJudicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou
Nov 25, 2010
-
Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? IntroductionBy A. Jennings
[ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran
Jan 1, 2012
-
Metal Accounting In The Platinum Industry: How Effective Is It? - SynopsisThe AMIRA Code of Practice and Guidelines for Metal Accounting was developed in response to demand from a number of sponsor companies, including one major platinum producer. Since its publication in 2
Jan 1, 2013
-
Continuous Vat Bio-Oxidation of a Refractory Arsenical Sulphide ConcentrateBy P. Brad Marchant
"To properly evaluate bioleaching as a commercial alternative for sulphide concentrate oxidation, to enhance cyanidation response, it was necessary to define and optimize critical operating variables
Jan 1, 1985
-
Comparison Of Numerical And Analytical Models Of Unsaturated Flow Around Underground Openings, Considerations For Performance Assessments Of Yucca Mountain, Nevada, As A High-Level Nuclear Waste RepositoryBy R. Codell, D. L. Hughson
While benchmarking the integrated finite-volume code MULTIFLO against the analytical solution of Philip et al. (1989) for cylindrical underground openings, we found numerical simulation of dripping th
Jan 1, 2000
-
OFR-29(2)-85 Physiological Responses Of Miners To Emergency - Volume II - AppendicesBy E. Kamon
This report summarizes completed research pertaining to the reaction of human subjects exposed to Self-Contained Breathing Apparatus (SCBA) stressors during escape conditions (viz., resistance breathi
Jan 1, 1984
-
IC 8250 Oilfields In Mahoning, Columbiana, Carroll, Jefferson, And Harrison Counties, OhioBy Charles E. Whieldon
Data on the oilfields in Mahoning, Columbiana, Carroll, Jefferson, and Harrison Counties, Ohio, were collected from scattered sources and compiled to make the information readily available to operator
Jan 1, 1965
-
The Design of Draft Tube CirculatorsDraft tube circulators are now widely used instead of Pachucas for suspension of slurries in large tall tanks.Precipitators in the alumina industry are an example.Draft tube/tank diameter ratio is cri
Jan 1, 1982
-
Electrowinning of Lead Directly From GalenaA description is given of preliminary work done to identify the problems inherent in electrochemical oxidation of metal sulphides, and particularly in the use of powder compacts as anodes in electroly
Jan 1, 1972
-
Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer ProgrammingBy M. Kuchta, A. Newman
LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use
Jan 1, 2002
-
Journal: Hazmat 101 / PART 4 – Cargo Segregation and SecurementBy Tom Snyder, John Brulia
Part 4 is the final article by the authors on hazardous materials (HM)transportation safety and compliance for U.S. shippers and carriers who offer and transport commercial explosives in commerce on p
Jan 1, 2015
-
Present Developments In The Design Of Deep FoundationsBy Rolf Katzenbach
The principle questions related to the design of deep foundations especially in soft soils are the stability and the cost optimised settlement reduction to prevent possible damages and to minimise the
Jan 1, 2006
-
A New Approach to Stope Scale Orebody MappingBy I Mason, A Wellington, J Hargreaves
Many people are familiar with the use of marine echo sounders which are used by fishermen to monitor water depth and locate schools of fish. Similar technology has recently been used in some West Aust
Jan 1, 2000
-
RI 3544 A Study Of Timber Decay In The Crucible Mine Of The Crucible Fuel Co. ? Introduction (aed0b321-b91a-4601-a1a8-28ba35c9479e)By E. R. Maize
[In report of Investigations 3452,5/ baling with roof movement in the Crucible mine, reference was made do to the fact tart timber decay was being studied at the time of writing. This roper, written a
Jan 1, 1940
-
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels ProjectBy Chris Tattersall, Tomyuki Kudo, Peter Raleigh, Nestor Garavelli, Steve Redmond, Michael J. Lehnen
Twin bore running tunnels driven approximately 4,500 route feet by a Mitsubishi Heavy Industries (MHI) EPB Tunnel Boring Machine link the West Portal and East Portal on this complex Light Rail Project
Jan 1, 2007