    Design Strategy For Deep Slurry Stabilized Bored Piles In Compression

    By Chu E. Ho

    Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p

    Jan 1, 2002

  • CIM
    Achieving the Benefits of Information Technology in Surface and Underground Mining Processes

    By Sean Dessureault

    Information technology (IT) initiatives in the past have tended to be sold on their ability to maximize resource output and return on capital by using assets more effectively and efficiently. Many IT

    May 1, 2002

  • SME
    A Computer-Based Hazard-Awareness Assessment Program For Surface Mines – Preprint 97-120

    By C. J. Bise, D. A. Poukhovski

    Two integral components of the 30 CFR 48 training requirements mandated for new miners, newly employed experienced miners, and the annual refresher training of all miners are hazard recognition and pr

    Feb 24, 1997

  • SME
    Sustainability For Nature And Mankind

    By M. Javier

    Defining the concept of sustainability is an important step for industry and society. It is necessary in order to clarify what it means when debunking the many misinterpretations pervasive in differe

    Jan 1, 2012

  • SAIMM
    Mathematical Solutions To The Multiple-Fan Ventilation Systems

    By S. Sarac

    In this study, graphical and mathematical methods used to determine operating points in single or multiple fan ventilation systems are summarized. The problem is mathematically formulized for parallel

    Jan 1, 2000

  • DFI
    Prediction And Calculation Of Construction Vibrations - Summary:

    By Mark R. Svinkin

    Construction-induced vibrations may be detrimental to adjacent structures and sensitive electronics operating nearby. Construction vibration sources have a wide range of energy and velocity, as a func

    Jan 1, 1999

  • SME
    Non-Destructive Testing of in-Situ Underground Mine Seals: Preliminary GPR Assessment

    Numerous underground coal mine ventilation seals have been installed in the United States of America prior to 2006 and after implementation of the Mine Improvement and New Emergency Response (MINER) A

    Feb 23, 2014

  • NIOSH
    RI 8059 Composition of Lead Sinter

    By W. M. Dressel

    In producing feed for a lead blast furnace, concentrates analyzing 70 to 80 pct Pb are sintered to produce a physically acceptable low-sulfur product which contains only about 50 pct Pb. Mixtures of P

    Jan 1, 1975

  • AUSIMM
    Mineral Matter in Australian Bituminous Coals

    The mineral matter has been isolated from a selection of Australian bituminous coals using low temperature (radio-frequency) oxidation or hydrogen peroxidation techniques and the species present ident

    Jan 1, 1978

  • DFI
    Sand Compaction Piles ? Synopsis

    By A. Holeyman

    The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ

    Jan 1, 2010

  • SAIMM
    Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analyses

    By H. Jang, Y. Kawamura

    Unplanned dilution and ore loss directly influence not only the productivity of underground stopes, but also the profitability of the entire mining process. Stope dilution is a result of complex inter

    Jan 1, 2015

  • AUSIMM
    Ventilating the 1,480 Ft Level Drive at the South Mine, Broken Hill

    The problem of ventilating an advancing drive which finally reached 5,550 ft from the fresh air base in rock with virgin temperature of 83°F was solved economically by the use of two 15 h.p. elec

    Jan 1, 1965

  • SME
    Rehabilitation of the Cape Creek Highway Tunnel Under Traffic

    By Roberto J. Guardia, Tim Shell, Robert A. Robinson, Steve Rodolf

    Our aging infrastructure includes numerous tunnels that provide easy access through topographic and societal obstacles. These tunnels are renewable resources that require periodic maintenance and reha

    Jan 1, 2005

  • SME
    Geochemical Profiling Of A Sulfide Leaching Operation: A Case Study

    By S. M. Flaherty, R. E. Scheffel, A. Guzman

    Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me

    Jan 1, 2006

  • NIOSH
    IC 9203 Characterization Of The 1986 Sand And Gravel Mining Workforce

    By Shail J. Butani

    In 1986 the Bureau of Mines conducted a probability sample survey, Mining Industry Population Survey, to measure such employee characteristics as occupation; principal equipment operated; work locatio

    Jan 1, 1988

  • NIOSH
    RI 8755 Preliminary Evaluation of Bit Impact Ignitions of Methane Using a Drum-Type Cutting Head

    By David A. Larson

    Preliminary laboratory experiments have been conducted by the Bureau of Mines to define the influence of bit geometry on methane ignitions as a step toward establishing safer mining-machine operating

    Jan 1, 1983

  • CIM
    Comparative tests of two operating procedures for the Turam electromagnetic prospecting system conducted at the McClean uranium deposits in northern Saskatchewan

    By K. Duckworth

    "Comparative tests of the conventional Turam survey configuration and an alternative configuration called the Tx-parallel configuration were conducted at the McClean uranium deposit in northern Saskat

    Jan 1, 1988

  • DFI
    Compressive Behaviour of Hollow Core Micropiles in Cohesive Soil

    By M. Hesham El Naggar, Osama F. E. Drbe

    "Abstract: The use of micropiles has greatly increased the last twenty years, including applications involving low capacity micropile networks, seismic retrofitting, underpinning of existing foundatio

    Jan 1, 2014

  • SME
    Risk Mitigation for Open Pit Mining in Areas With Underlying Old Underground Workings

    By J. Duran

    Mining at Phoenix is currently done by surface operation in the Fortitude and Bonanza Pits, at a combined rate of approximately 110,000 tons per day. A portion of the ore bodies targeted by these pit

    Feb 23, 2014

  • NIOSH
    OFR-134-81 Outcrop Barrier Design Guidelines For Appalachian Coal Mines

    By Mary L. Pearson

    Ibis report summarizes the results of the contract. Included are summaries of existing legislation pertaining to outcrop barriers and a state-of-the-art survey of outcrop barrier designs and related,

    Jan 1, 1981