Search Documents

  • AUSIMM
    The successful deployment of a fatal risk system, designed for the front-line

    By C J. Pitzer

    The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine

    Mar 29, 2023

  • SAIMM
    The Allure, Magic And Mystery - A Brief History Of Diamonds

    By G. Smith

    This paper describes the allure of diamonds over time and highlights the magic and mystery of famous diamonds. Consideration is given to the effectiveness of marketing in the diamond industry. It is c

    Jan 1, 2003

  • NIOSH
    IC 8767 Guide For The Construction Of Driven-Rod Ground Beds

    By R. L. King

    This report describes a method for designing and constructing ground beds that has been developed under the sponsorship of the Bureau of Mines. The procedures for designing and constructing a driven-r

    Jan 1, 1978

  • SME
    Membrane Vs. Chemical Treatment To Remove Mine Water Contaminants ? Determining Which Process Works Best For Mine Water Treatment Needs ? Introduction

    By H. C. Liang

    Reverse osmosis (RO) and nanofiltration (NF) are widely regarded as being best available technologies (BATs) for removing contaminants of concern from water. In recent years, NF or RO treatment has i

    Jan 1, 2012

  • AIME
    Chile’s Coquimbo Port Installs Mobile Loading Facilities

    By A. T. Yu

    On March 18, 1964, the 52,000 dwt ore carrier M/S Houn Maru called at the port of Coquimbo, Chile, on its maiden voyage to take iron ore to Japan. This marked the first time a vessel of this size ever

    Jan 5, 1964

  • SME
    Amax Uses Practical Approach to Dewatering at Its Sleeper Mine

    By W. David Tyler

    Any mining or engineering-construction excavation that extends below the water table must be dewatered. In many situations, the ground is of low permeability or the workings extend only a short distan

    Jan 1, 1991

  • CIM
    Social indicators for mining in Ancash, Peru: combining community objectives, technical considerations and community relations insight to design a practical framework.

    By Carol J. Odell

    As a mining social practitioner, social indicators are within the purview of required competencies. A situation, where the ER manager requested assistance in quickly deriving a few social indicators f

    May 1, 2010

  • AIME
    Coal - Surface Subsidence Associated with Longwall Mining

    By W. C. McClain

    The amount of vertical subsidence occurring over a longwall operation is a function of the thickness of material removed, the quantity and quality of any fill material, the width of the extraction, an

    Jan 1, 1967

  • SME
    Face Dust Levels At Deep-Cut Underground Coal Mines

    By J. D. Potts

    Dust surveys were conducted at six underground coal mines to determine if deep-cutting practices expose face workers to higher levels of respirable dust. The surveyed mines were able to successfully m

    Jan 1, 2011

  • CIM
    Start-Up and Early Optimization of the New Afton Concentrator

    By C. O’Hara, S. Roy, K. Swedburg, J. Katchen

    "New Gold Inc.’s New Afton concentrator commenced operation in June 2012, producing a copper-gold-silver concentrate. During the first two years of operation, various optimization efforts have improve

    Jan 1, 2015

  • DFI
    Statnamic Loading Tests On Different Pile Types - 1.0 Introduction

    By Patrick Bermingham

    This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile

    Jan 1, 1993

  • NIOSH
    Helium (2af1a135-8295-4649-857e-48f24312c552)

    By Edwin M. Thomasson

    HELIUM SHIPMENTS in 1964 exceeded the volume shipped during the previous year for the 15th successive time. Shipments from Bureau of Mines helium plants were 667.4 million cubic feet,2 about 6 percent

    Jan 1, 1965

  • IOM3
    Exploration and origin of stratigraphically controlled platinium-group element mineralization in crustal sequence ultramafics, Shetland ophiolite complex

    By R. A. Lord, H. M. Prichard

    Paper presented at Mineralisation in the Caledonides, the Mike Gallagher memorial meeting held in Edinburgh, 27-28 June 1996. The complex exemplifies a class of olivine-rich, platiniferous ophiolite c

    Jun 19, 1905

  • SME-ICGCM
    Field Experience Of Measuring The Acoustic Energy From A Hammer Blow To Coal Mine Roof And Its Relationship To Roof Stability

    By Peter Altounyan

    The rate of decay of the energy from a hammer blow to a coal mine roof is related to the size and nature of the contacts between the rock being struck and its surroundings The use of this principle as

    Jan 1, 2000

  • NIOSH
    OFR-47-77 Reducing The Operator Sound Level Of A Mining Service Vehicle - A Demonstration Project

    By G. G. Huggins

    A demonstration project has been completed to reduce the operator sound level of an underground service vehicle, a personnel dispatch wagon, to go dB(A) or less. The program objective was to implement

    Jan 1, 1975

  • TMS
    Reaction Sequences in Sulphide Particle Oxidation

    By E. J. Peuraniemi

    Oxidation of chalcopyrite concentrate and two low-iron copper mattes were studied using a laboratory scale laminar-flow furnace simulating the phenomena taking place in different zones of the reaction

    Jan 1, 2000

  • SME
    Application Of Modern Technology In Today’s Limestone Quarry Operation

    By B. Moore, Y. J. Zhang

    In today’s competitive dimensional stone business environment, use of available technology is critical to achieve and maintain a competitive advantage. Awareness of improvements in diamond cutting tec

    Jan 1, 2004

  • NIOSH
    OFR-43-84 Noise Control Of Rubber-Tired Front-End Loaders Used In Surface Mining

    By N. R. Dixon

    This report summarizes all work performed under U.S. Bureau of Mines Contract No. J0395028, "Noise Control of Rubber-Tired Front-End Loaders Used in Surface Mining. " Two loaders, a Caterpillar 988 an

    Jan 1, 1983

  • NIOSH
    Analysis Of Nonstandard Noise Dosimeter Microphone Positions

    By Efrem R. Reeves, David C. Byrne

    This study was conducted as part of a project involving the evaluation of a new type of noise exposure monitoring paradigm. Laboratory tests were conducted to assess how “nonstandard” dosimeter microp

  • NIOSH
    OFR-114-85 Development Of A Roof Competence Tester

    By J. B. Czirr

    MESA Corporation has completed a four-year program for the Bureau of Mines to develop a technique for measuring roof competence in underground coal mines. The preferred technique employs a tracer gas

    Jan 1, 1985