Search Documents

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • SAIMM
    Fatigue Knowledge?A New Lever In Safety Management - Synopsis

    By W. J. Theron

    The purpose of the paper is to give an introduction to the concept of fatigue and its causes in the mining industry. By knowing the fundamental role it plays, together with its dynamics, can positivel

    Jan 1, 2011

  • AUSIMM
    Cave Propagation and Open Pit Interaction at the Ernest Henry Mine

    By E Ah Mu and C R Lilley, A D. Campbell

    Cave propagation is a complex process due to interacting variables such as mine geometry, rock mass heterogeneity and complex structural networks and stress fields. The Ernest Henry sublevel cave (SLC

    May 9, 2016

  • AUSIMM
    Sumps Aids the Broken Hill Proprietary Company Limited in Saxonvale Feasibility Study

    By G T. Kukla

    A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine planning sy

    Jan 1, 1980

  • SME-ICGCM
    Destressing Practice In Rockburst-Prone Ground

    By J. Willan

    This paper addresses the problem of designing a destress blasting procedure to reduce the incidence of rockbursting in hard rock mines. A review is made of the developed theory and practice of destres

    Jan 1, 1984

  • ISEE
    Algorithms for Adaptive Solutions: Essential Tools for Operational Blast Optimization

    By Sushil Bhandari, Amit Bhandari

    Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field

    Jan 1, 2019

  • ISEE
    Vibration Effects on Historic Structures

    By Randy Wheeler

    One of the more difficult topics to address concerns the effects of vibration on historic structures. Not only blast induced vibration, but also vibration from other transient and semi-continuous sour

    Jan 1, 2004

  • SAIMM
    Safety Considerations When Handling Metal Powders ? Synopsis (00a81d62-4249-4705-86a3-c89cdfe5d31a)

    By J. M. Benson

    Metal powder compaction offers unique advantages in the manufacture of net-shape components using techniques such as laser sintering, conventional press and sintering, metal injection moulding, direct

    Jan 1, 2012

  • CIM
    Fast Track Reactivation -Jacobina Mine

    Mine Evaluation Engineering , Operational and Social evaluation. Focus is on what opportunities are available. Social ??History ??Past Management Practices ??Community / Available labor force Mi

    May 1, 2006

  • CIM
    Characteristics of Coal Supplied by Eastern Producers for Use in Thermal Generating Stations

    By Paul R. Terry

    This paper presents a brief picture of the quality of coal produced in Eastern Canada for use in thermal generating stations. It describes, in particular, the characteristics of coals burned in six po

    Jan 1, 1965

  • ISEE
    Pre-Splitting With The New AIRDEK Technique

    By David G. Borg, John Bussey

    The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application

    Jan 1, 1988

  • AUSIMM
    Oil Exploration in the Western Great Artesian Basin

    Delhi Australian Petroleum Ltd., acting as operator for the joint interests of Delhi and Santos Ltd., has been engaged in petroleum exploration in the western Great Artesian Basin since 1958.Extensive

    Jan 1, 1964

  • NIOSH
    IC 9025 Tungsten Availability - Market Economy Countries - A Minerals Availability Program Appraisal

    By T. F. Anstett

    The Bureau of Mines estimated the potential availability of tungsten from 57 mines and deposits in 19 market economy countries. The tungsten resources of China and the U.S.S.R. were also estimated. Th

    Jan 1, 1985

  • AUSIMM
    Recovery of Tantalum Capacitors from Waste Printed Circuit Boards Using a Pneumatic Separator

    Recovery of Tantalum Capacitors from Waste Printed Circuit Boards Using a Pneumatic Separator

    Sep 13, 2010

  • AUSIMM
    Geotechnical Factors Affecting Coal Recovery in the Maramarua, Mokau, and Ohinewai Deposits

    By B W. Riddol1s

    The 1983 Energy Plan calls for an increase in North Island coal production from both underground and opencast sources from the 1982/1983 production of 843 000 tpa to approximately 3.4 Mtpa within the

    Jan 1, 1984

  • SME-ICGCM
    A Method for Sizing Longwall Pillars Based on Field Measurements

    By Christopher Mark

    A new method for the design of longwall pillars, called "Analysis of Longwall Pillar Stability" (ALPS), is described. The method is the final result of a research program that included two major field

    Jan 1, 1987

  • CIM
    Mining for Space Why now?

    By Michel Doyon

    Canadian Context: Exploration ??Space Exploration is within the unique mandate of the Canadian Space Agency ??Global partnerships ??Maintain close relationship with our partners ??New knowledge

    May 1, 2009

  • NIOSH
    Review Of The Mineral-Fuel Industries In 1959 - General Summary

    By Victor Erickson

    ECONOMIC recovery, which began in 1958, carried through into 1959 but was somewhat retarded by the 116-day steel strike beginning in July 1959. Recovery and economic growth increased production and co

    Jan 1, 1960

  • SAIMM
    The Role Of Alloying Elements In Bainitic Rail Steels - Synopsis

    By A. Kapito

    The formation of bainite in steel is dependent on the size of the casting, the heat treatment, and the alloying elements. It is difficult to obtain a fully bainitic microstructure in steels during hea

    Jan 1, 2013

  • CIM
    Finite Element Evaluation of the Residual Stress Fields Obtained by Hole Expansion on 6061-T6 Aluminum Welds

    By K. C. Viveros, R. R. Ambriz, C. García, F. De Villèle, A. Talha, D. Jaramillo

    Cold hole expansion on base metal, weld metal and heat affected zone of 6061-T6 aluminum alloy welds was simulated by means of finite element method. Three dimensional compact test models with a previ

    Jan 1, 2014