Search Documents

  • SAIMM
    Factorial Kriging for Multiscale Modeling

    By Y. Z. Ma

    This paper presents a matrix formulation of factorial kriging, and its relationships with simple and ordinary kriging. Similar to other kriging methods, factorial kriging can be applied to both statio

    Jan 1, 2014

  • SME
    Horizontal Geotechnical Investigations for Tunneling

    By Nick Salisbury, Alan Howard, Scott Tunison

    INTRODUCTION Geotechnical investigations for tunneling projects typically use vertical test borings and, to a lesser extent, angled borings. Horizontal drilling applications were often limited to

    Jan 1, 2005

  • ISEE
    Fire and Explosion of a Mobile Explosive Manufacturing Unit

    By Jose a. Sanchidrian, Ramon G. Eguren, Javier L. Amigo

    On December 2013 a MEMU exploded at a blasting site in Norway, after burning for more than two hours. This paper describes the analyses made to determine the actual yield of the explosion, the lessons

    Jan 1, 2016

  • SAIMM
    Using Machine Carousel To Reduce Cladding Support Cycle At Pk2 Ventilation Shaft (311f8feb-63e6-4d23-980e-900e4671e984)

    By Braam Blom

    PK2 Ventilation shaft is part of Paardekraal No 2 twin shaft system that is being developed to replace depleting Merensky reef production at Paardekraal shaft complex. The sinking team at this shaft f

    Jan 1, 2009

  • AUSIMM
    Paper No. 128. The Rise And Fall of Dry Crushing on The Hauraki Goldfield.

    n the early days of the Hauraki goldfield (1866 to 1889) almost the only system of ore treatment was wet crushing followed by copper plate amalgamation. A further saving of bullion was in most cases o

    Jan 1, 1903

  • AUSIMM
    Heat load assessment and mine cooling strategies for a longwall coalmine

    By M Olsen, L van den Berg

    Bowen Basin coalmines suffer from hot and humid ambient conditions during the summer period. The ambient conditions combined with high VRTs, increasing depth of working and significant equipment heat

    Aug 28, 2017

  • SME
    Evaluation of Whole‑Body Vibration Exposure of Dozer Operators, a Task‑Based Approach

    By Bülent Erdem, Zekeriya Duran, Tuğba Doğan

    The objective of this study was to evaluate the potential health risk associated with exposure of dozer operators to whole-body vibration. Measurements were made on 31 dozers used in different surface

    Jun 16, 2022

  • NIOSH
    OFR-46-85 Mine Power System Safety And Reliability Improvement - Part I

    By Herman W. Hill

    This report summarizes research into the root causes of failures in mine power systems which impact safety and reliability. Abnormally low fault currents, due to arcing faults, self-excited systems, a

    Jan 1, 1981

  • NIOSH
    RI 3586 Preliminary Report On The Flotation Of Bauxite ? Introduction

    By J. B. Clemmer

    This report summarizes the results of u laboratory study of the beneficiation of Arkansas bauxite by flotation. Although the investigation is not yet completed, a preliminary retort of the results on

    Jan 1, 1941

  • NIOSH
    RI 3586 Preliminary Report On The Flotation Of Bauxite ? Introduction (ac12c6b0-21f7-4176-bc03-aa490cce21e2)

    By J. B. Clemmer

    This report summarizes the results of u laboratory study of the beneficiation of Arkansas bauxite by flotation. Although the investigation is not yet completed, a preliminary retort of the results on

    Jan 1, 1941

  • IIMP
    Metalogenia del batolito andahuaylas – yauri y sus implicancias en la exploración de pórfidos Cu – Au

    By Raymond Rivera

    El presente texto describe la evaluación desarrollada por INGEMMET donde se analiza el potencial de los depósitos minerales en el Batolito Andahuaylas, Yauri, así como el potencial de algunas zonas qu

    Sep 12, 2011

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • AUSIMM
    Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken Hill

    The 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The

    Jan 1, 1965

  • AUSIMM
    Macraes Gold Mine - Continuous Improvement of a Refractory Gold Treatment Plant

    By S R. La Brooy, T Giraudo, I C. Ritchie

    The treatment plant at the Macraes Gold Project in New Zealand processes a carbonaceous, refractory sulphide gold ore. Since its commissioning in 1990, there has been a programme of continuous improve

    Jan 1, 1998

  • SAIMM
    Can Buffer Stores Improve Productivity? ? Synopsis

    By R. C. D. Phillis

    The management of critical resource inventories is an important productivity lever and a significant risk factor?risk in the sense that poor resource availability lends itself to disempowerment of wor

    Jan 1, 2011

  • NIOSH
    OFR-29(2)-83 High Angle Conveyor Study - Volume II

    By E. A. Mevissen

    With the ever increasing consumption of mineral commodities, the vital question is not whether sufficient mineral quantities will be available, but rather can the known existing low grade resources be

    Jan 1, 1981

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • SAIMM
    Evaluation And Control Of Iron And Steelmaking Slags Through Electrochemical FeO Sensors

    By A. McLean, M. Iwase, K. Wakimoto, K. Katogi, Y. Kikuchi

    One of the greatest obstacles to the application of physical chemistry principles to the elucidation of slag-metal reactions is a lack of knowledge of activities of the reacting species. To a large ex

    Jan 1, 2004

  • AUSIMM
    Mine Rehabilitation for Sustainable Landcare: Cost-Effective Strategies

    By R Simcock

    Why Rehabilitate? Legislative Requirement Land rehabilitation is a condition of resource consents for mining. Clause 17 (1) of the Resource Management Act 1991 (duty to avoid, remedy, or mitigate adve

    Jan 1, 1997

  • AUSIMM
    Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in India

    By I D. Gregson, A S. Garcia, K M. MacAndrew

    The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm

    Nov 5, 2014